• Title/Summary/Keyword: Design Flood

Search Result 650, Processing Time 0.031 seconds

The Study for Reduction Effect of Riverbed Scour due to Shape of Vanes (베인 형태에 따른 하상세굴 저감 효과에 관한 연구)

  • Hae Min Noh;Ho Jin Lee;Sung Duk Kim
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.2
    • /
    • pp.57-63
    • /
    • 2023
  • Recently, Heavy rains and super typhoons occurred by climate change cause a lot of damage in Korea. In order to reduce such damage, various types of river maintenance projects are being promoted, but it is difficult to maintain the balance of rivers in Korea with distinct flood and dry seasons. In particular, river structures installed as a river maintenance project cause various problems such as scouring of structures and their foundations during floods and river bed changes. In order to reduce such bed scour, various vanes are installed in the bend of the river, and various bed scour reduction effects appear depending on the size, arrangement, and shape of the vanes. The vane regenerates the secondary flow in the opposite direction to the secondary flow generated by the centrifugal force, thereby reducing scour around the outer bed and promoting deposition. The theory of this study uses the governing equation applying the continuity equation that satisfies the law of conservation of mass and the momentum equation that satisfies the conservation of momentum, and measures the overall average flow velocity change rate according to design factors to investigate the effect of vanes under various conditions. Both the average and cross-sectional flow velocities decreased in both the trapezoidal vane and the square vane. In addition, vanes installed perpendicularly or inclined to the direction of river flow generate a secondary flow in the opposite direction to the secondary flow generated by centrifugal force, thereby canceling the secondary flow of centrifugal force, so the effect of the vane appears.

Analysis of runoff reduction performance of permeable pavement and rain barrel in Mokgam stream basin and determination of installation priorities (목감천 유역 내 투수성포장과 빗물저류조의 유출량 저감 성능 분석 및 설치 우선 순위 결정)

  • Chae, Seung-Tak;Chung, Eun-Sung;Park, Inhwan
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.12
    • /
    • pp.905-918
    • /
    • 2023
  • This study aimed to assess runoff reduction performance and determine installation priorities for Permeable Pavement (PP) and Rain Barrel (RB) within the Mokgam Stream basin. Optimal design parameters were determined to maximize the effectiveness of PP and RB in reducing runoff. Furthermore, the optimal parameters were incorporated to compare the runoff reduction performance of PP and RB. Analysis of the runoff curve at the basin outlet indicated that PP demonstrated superior performance in reducing runoff during the rising limb of the curve. At the same time, RB excelled within the falling limb. Comparisons of total runoff and peak runoff reduction by sub-catchment revealed that in larger sub-catchment areas, PP outperformed RB in runoff reduction. In contrast, RB exhibited higher performance in areas with a higher impervious ratio. Based on the evaluation of runoff reduction performance for PP and RB, installation priorities were determined within the Mokgam Stream basin. The results showed that PP and RB installations were prioritized for sub-catchments with larger areas and a higher impervious ratio. Furthermore, the correlation between the ranking of runoff reduction performance and sub-catchment characteristics showed a high correlation with both the impervious area ratio and sub-catchment geometrical properties in sub-watersheds exhibiting the top 25% runoff reduction performance. These results emphasize that when determining the priority for installing LID facilities in developed urban areas, it is necessary to consider not only the impervious area ratio but also the geometrical properties of the sub-catchment.

Study on the Rice Yield Reduction and Over head Flooding Depth for Design of Drainage System (배수 설계를 위한 벼의 관수심 및 관수피해율에 관한 연구)

  • 김천환;김시원
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.4
    • /
    • pp.69-79
    • /
    • 1982
  • The objective of this study is to contribute to drainage planning in the most realistic and economical way by establishing the relationship between rice yield reduction and overhead flooding by muddy water of each growth stage of paddy, which is the most important factor in determining optimum drainage facilities. This study was based on the data mainly from the experimental reports of the Office of Rural Development of Korea, Reduction Rate Estimation for Summer Crops, published by Ministry of Agriculture and Forestry of Japan and other related research documenta- tion. The results of this study are summarized as follows 1. Damages by overhead flooding are highest in heading stage and have the tendency of decrease in the order of booting stage, panicle formation stage, tillering stage, and stage just after transplanting. Damages by overhead flooding of each growing stage are as follows: a) It is considered that overhead flooding just after transplanting gives a little influence on plant growth and yield because the paddy has sufficient growth period from floo ding to harvest time. b) Jt is analyzed that according to the equation y=11 12x 0.908 which is derived from this study, damages by overhead flooding during tillering stage for 1, 2, 3 successive days are 11.1 %, 20.9%, and 30.2% respectively. c) Damages by overhead flooding after panicle formation stage are very serious because recovering period is very short after damage and ineffective tillering is much. Acc- ording to the equation y=9. 58x+10. Ol derived from this study, damages by overhead flooding fal 1,2,3,5 successive days are 19.6%, 29.2%, 38.8%, 57.9% respectively. d) Booting stage is the very important period in which young panicle has grown up almost completely and the number of glumous flower is fixed since reduction division takes place in the microspore mother cell and enbryo mother cell. According to the equation y=39. 66x 0.558 derived from this study, damages by overhead floodingfor 0.5, 1, 3, 5 successive days are 26.9%, 39.7%, 72. 2% and 97.4%, respectively. Therefore, damages by overhead flooding is very serious during the hooting stage. e) When ear of paddy emerges, flowering begins on that day or the next day; when paddy flowers, fertilization will be completed 2-3 hours after flowering. Therefore overhead flooding during heading stage impedes flowering and increases sterilizing percentage. From this reason damages of heading stage are larger than that of booting stage. According to the equation y-41 94x 0.589 derived from this study, damages by overhead flooding for 0.5, 1, 3, 5, successive days are 27.9%, 63.1 %, 80.1%, and 100% 2. Considering that temperature of booting stage is higher than that of beading stage and plant height of booting stage is ten centimeters shorter than that of heading stage, booting stage should be taken as a critical period for drainage planning because possi- bility of damage occurrence in booting stage is larger than that of heading stage. There-fore, it is considered that booting stage should be taken as critical period of paddy growth for drainage planning. 3. Overhead flooding depth is different depending on the stage of growth. In case, booting stage is adopted as design stage of growth for drainage planning, it is conside red that the allowable flooding depth for new varieties and general varieties are 70cm and 80cm respectively. 4. Reduction Rate Estimation by Wind and Flood for Rice Planting of the present design criteria for drainage planning shows damage by overhead flooding for 1 to 2, 3 to 4, 5 to 7 consecutive days; damages by overhead flooding varies considerably over several hours and experimental condition of soil, variety of paddy, and climate differs with real situation. From these reasons, damage by flooding could not be estimated properly in the past. This study has derived the equation which shows damages by flooding of each growth stage on an hourly basis. Therefore, it has become possible to compute the exact damages in case duration of overhead flooding is known.

  • PDF

Analysis of Soil Changes in Vegetable LID Facilities (식생형 LID 시설의 내부 토양 변화 분석)

  • Lee, Seungjae;Yoon, Yeo-jin
    • Journal of Wetlands Research
    • /
    • v.24 no.3
    • /
    • pp.204-212
    • /
    • 2022
  • The LID technique began to be applied in Korea after 2009, and LID facilities are installed and operated for rainwater management in business districts such as the Ministry of Environment, the Ministry of Land, Infrastructure and Transport, and LH Corporation, public institutions, commercial land, housing, parks, and schools. However, looking at domestic cases, the application cases and operation periods are insufficient compared to those outside the country, so appropriate design standards and measures for operation and maintenance are insufficient. In particular, LID facilities constructed using LID techniques need to maintain the environment inside LID facilities because hydrological and environmental effects are expressed by material circulation and energy flow. The LID facility is designed with the treatment capacity planned for the water circulation target, and the proper maintenance, vegetation, and soil conditions are periodically identified, and the efficiency is maintained as much as possible. In other words, the soil created in LID is a very important design element because LID facilities are expected to have effects such as water pollution reduction, flood reduction, water resource acquisition, and temperature reduction while increasing water storage and penetration capacity through water circulation construction. In order to maintain and manage the functions of LID facilities accurately, the current state of the facilities and the cycle of replacement and maintenance should be accurately known through various quantitative data such as soil contamination, snow removal effects, and vegetation criteria. This study was conducted to investigate the current status of LID facilities installed in Korea from 2009 to 2020, and analyze soil changes through the continuity and current status of LID facilities applied over the past 10 years after collecting soil samples from the soil layer. Through analysis of Saturn, organic matter, hardness, water contents, pH, electrical conductivity, and salt, some vegetation-type LID facilities more than 5 to 7 years after construction showed results corresponding to the lower grade of landscape design. Facilities below the lower level can be recognized as a point of time when maintenance is necessary in a state that may cause problems in soil permeability and vegetation growth. Accordingly, it was found that LID facilities should be managed through soil replacement and replacement.

The Research of Storage Capacity & Sedimentation of Reservoirs in HONAM Province (호남지방에 저수지의 매몰상황과 저수량에 관한 조사연구(농학계))

  • 이창구
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.13 no.2
    • /
    • pp.2262-2275
    • /
    • 1971
  • Fourteenes rervoirs maintained by the local land improvement associations in the province of Chullabuk-Do and 20 reservoir maintained by thos in the province of Chullanam-Do, were surveyed in connection with a correction between storage capacity and sediment deposit. In addition to this survey, 3,347 of small reservoir, that lie scattered around in the above-mentioned two provinces were investigated by using existing two provinces were investigated by using existing records pertaining to storage capacity in the office of City and country, respectively. According to this investigation the following comclusions are derived. 1. A sediment deposition rate is high, being about $10.63m^3/ha$ of drainage area, and resulting in the average decreasc of storage capaity by 27.5%. This high rate of deposition coule be mainly attributed to the serve denudation of forests due to disorderly cuttings of trees. Easpecially, in small reservoir, an original average design storage depth of 197mm in irrigation water depth is decreased to about 140mm. 2. An average unit storage depth of 325.6mm as the time of initial construction is decreased to 226mm at present. This phenomena causes a greater shortage irrigation water, since it was assumed that original storage quantity was already in short. 3. Generally speaking, seepage rates through dam abutment intakepipe, etc, are high due to insufficient maintenance and management of reservoir. 4. It is recommended that sediment deposit should be dredged when a reservoir is dry in drought. 5. Farmers usually waste excessive irrigation water. 6. Water saving methods should be practiced by applying only necessary water for growing stage of rice. 7. In are as where water defficiency for irrigation is severe, a soil moisture content should be kept at about 70% by applying water once in several days. 8. Tube wells should be provided so as to exploit ground water and subsurface current below stream bed as much as possible. 9. If an intake weir was constructed, a water collection well should be built for the use in drought. 10. Water conservation should be forced by converting devastated forests contained in the drainage area of reservoir to protected forests so as to take priority of yrefor estation, gully control, the prohibition of disorderly cutting of trees, etc. 11. Collective rice nurseries should be adopted, and it should be recommended that irrigation water for rice nurseries is supplied by farmer themselves. 12. Sediment desposit in reservoir should be thoroughly dreged so as to secure a original design storage capacity. 13. The structure of overflow weir should be automatic so as to freely control flood level and not to increase dam height.

  • PDF

Characteristics of Mass Transport Depending on the Feature of Tidal Creek at Han River Estuary, Gyeong-gi Bay, South Korea (경기만 염하수로에서의 비정규 격자 수치모델링을 통한 조간대 조수로의 고려에 따른 Mass Transport 특성)

  • Kim, Minha;Woo, Seung-Buhm
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.25 no.2
    • /
    • pp.41-51
    • /
    • 2013
  • The tidal creek dependent mass transport characteristic in Gyeong-Gi Bay (west coast of Korea) was studied using field measured data and numerical model. Gyeong-Gi Bay consists of 3 main tidal channels and contains a well-developed vast tidal flat. This region is famous for its large tidal difference and strong current. We aim to study the effect of tidal creek in the tidal flat on the mass exchange between the estuary and the ocean. For numerical application, the application of unstructured grid feature is essential, since the tidal creek has complicated shape and form. For this purpose, the FVCOM is applied to the study area and simulation is performed for 2 different cases. In case A, geographic characteristics of the tidal creek is ignored in the numerical grid and in case B, the tidal creek are constructed using unstructured grid. And these 2 cases are compared with the field measured cross-channel mass transport data. The cross-channel mass transport at the Yeomha waterway mouth and Incheon harbor was measured in June, 9~10 (Spring tide) and 17~18 (Neap tide), 2009. CTD casting and ADCP cross-channel transect was conducted 13 times in one tidal cycle. The observation data analysis results showed that mass transport has characteristic of the ebb dominance Line 1 (Yeomha waterway mouth), on the other hand, a flood dominant characteristic is shown in Line 2 (Incheon harbor front). By comparing the numerical model (case A & B) with observation data, we found that the case B results show much better agreement with measurement data than case A. It is showed that the geographic feature of tidal creek should be considered in grid design of numerical model in order to understand the mass transport characteristics over large tidal flat area.

Distribution and remediation design of heavy metal contamination in farm-land soils and river deposits in the vicinity of the Goro abandoned mine (고로폐광산 주변 농경지 토양 및 하천 퇴적토의 중금속 오염 분포 및 복원 대책 설계)

  • 이민희;최정찬;김진원
    • Economic and Environmental Geology
    • /
    • v.36 no.2
    • /
    • pp.89-101
    • /
    • 2003
  • River deposits and farmland soils were analyzed to investigate the pollution level of heavy metals in the vicinity of the Goro abandoned Zn-mine. Surface (0-40 cm) and subsurface (40-100 cm) soils were collected around a main river located at the lower part of the Goro mine, and analyzed by ICP-MS for Cd, Cu, Pb, Zn and Cr after 0. 1N HCI extraction and by AAS for As after IN HCI extraction. Concentrations of cadmium and lead at the surface river deposits close to the mine were over the Soil Pollution Warning Limit (SPWL), and 43% of sample sites (6 of 14 samples) were over SPWL for As suggesting that river deposits were broadly contaminated by arsenic. Results from farmland soil analysis showed that surface soils were contaminated by heavy metals, while only arsenic was over SPWL at 50% of sampling sites. Main pollution mechanism around the Goro mine was the discharge of mine tailing and waste rocks from the storage site to the river and to adjacent farmland during flood season. Pollution Grades for sample locations were prescribed by the Law of Soil Environmental Preservation, suggesting that the pollution level of heavy metals around the Goro mine was serious, and the remediation operation fur arsenic and the isolation of mine tailing and waste rocks from river and farmland should be activated to protect further contamination. The area needed to clean up was estimated from pollution distribution data and the remediation methods such as a soil washing method and a soil improvement method were considered as the further remediation operation for arsenic contaminated soils and river deposits around the Goro abandoned mine.

A study on the rainfall management target considering inter-event time definition (IETD) (무강우 지속시간(IETD)을 고려한 빗물관리 목표량 설정 방안 연구)

  • Baek, Jongseok;Kim, Jaemoon;Park, Jaerock;Lim, Kyoungmo;Shin, Hyunsuk
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.8
    • /
    • pp.603-611
    • /
    • 2022
  • In urban areas, the impermeable area continues to increase due to urbanization, which interferes with the surface penetrating and infiltrating of rainwater, causing most rainwater runoff to the surface, deepening the distortion of water circulation. Distortion of water circulation affects not only flood disasters caused by rainfall and runoff, but also various aspects such as dry stream phenomenon, deterioration of water quality, and destruction of ecosystem balance, and the Ministry of Environment strongly recommends the use of Low Impact development (LID) techniques. In order to apply the LID technique, it is necessary to set a rainwater management target to handle the increase in outflow after the development of the target site, and the current standard sets the rainwater management target using the 10-year daily rainfall. In this study, the difference from the current standards was analyzed through statistical analysis and classification of independent rainfall ideas using inter-event time definition (IETD) in setting the target amount of rainwater management to improve water circulation. Using 30-year rainfall data from 1991 to 2020, methods such as autocorrelation coefficient (AC) analysis, variation coefficient (VC) analysis, and annual average number of rainfall event (NRE) analysis were applied, and IETD was selected according to the target rainfall period. The more samples the population had, the more IETD tended to increase. In addition, by analyzing the duration and time distribution of independent rainfall according to the IETD, a plan was proposed to calculate the standard design rainfall according to the rainwater management target amount. Therefore, it is expected that it will be possible to set an improved rainwater management target amount if sufficient samples of independent rainfall ideas are used through the selection of IETD as in this study.

A Proposal for Simplified Velocity Estimation for Practical Applicability (실무 적용성이 용이한 간편 유속 산정식 제안)

  • Tai-Ho Choo;Jong-Cheol Seo; Hyeon-Gu Choi;Kun-Hak Chun
    • Journal of Wetlands Research
    • /
    • v.25 no.2
    • /
    • pp.75-82
    • /
    • 2023
  • Data for measuring the flow rate of streams are used as important basic data for the development and maintenance of water resources, and many experts are conducting research to make more accurate measurements. Especially, in Korea, monsoon rains and heavy rains are concentrated in summer due to the nature of the climate, so floods occur frequently. Therefore, it is necessary to measure the flow rate most accurately during a flood to predict and prevent flooding. Thus, the U.S. Geological Survey (USGS) introduces 1, 2, 3 point method using a flow meter as one way to measure the average flow rate. However, it is difficult to calculate the average flow rate with the existing 1, 2, 3 point method alone.This paper proposes a new 1, 2, 3 point method formula, which is more accurate, utilizing one probabilistic entropy concept. This is considered to be a highly empirical study that can supplement the limitations of existing measurement methods. Data and Flume data were used in the number of holesman to demonstrate the utility of the proposed formula. As a result of the analysis, in the case of Flume Data, the existing USGS 1 point method compared to the measured value was 7.6% on average, 8.6% on the 2 point method, and 8.1% on the 3 point method. In the case of Coleman Data, the 1 point method showed an average error rate of 5%, the 2 point method 5.6% and the 3 point method 5.3%. On the other hand, the proposed formula using the concept of entropy reduced the error rate by about 60% compared to the existing method, with the Flume Data averaging 4.7% for the 1 point method, 5.7% for the 2 point method, and 5.2% for the 3 point method. In addition, Coleman Data showed an average error of 2.5% in the 1 point method, 3.1% in the 2 point method, and 2.8% in the 3 point method, reducing the error rate by about 50% compared to the existing method.This study can calculate the average flow rate more accurately than the existing 1, 2, 3 point method, which can be useful in many ways, including future river disaster management, design and administration.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF