Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.371-375
/
2015
Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.
The 3th International Conference on Construction Engineering and Project Management
/
pp.203-211
/
2009
Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.
During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.
Faced with increasing competitive pressures to reduce time-to-market, many business organizations have recognized that shortening the design cycle by taking full advantage of their intellectual property is inevitable in maintaining their market share. This paper describes a knowledge management system for machine tool design. Product structuring, change management, and complex design knowledge management are possible through the developed system. The system can speed up the design process by making necessary data instantly available as it is needed and keeping track of all the relevant design information and knowledge including individual decisions, design intentions, documents, and drawings.
Configuration Management (CM) is a process of identifying and documenting the characteristics of a Structures, Systems and Components (SSCs), and of ensuring that changes to these characteristics are properly assessed, approved, issued, implemented and verified. There are requirement management, change control, facility configuration information management for CM activities. In order to improve safety of Nuclear Power Plant(NPP), it is necessary to manage change item systematically. Existing CM concept is focused on the NPP in operation. On the other hand, NPP under construction is difficult to efficiently manage the change because of different change process from varoius stake-holders. This research considers method of consolidation change process for NPP to ensure that approved changes are accurately reflected in the design requirements, facility configuration information, and the physical configuration.
정부기관은 공사계획단계 및 시공 중 발생하는 설계변경으로 인한 공사비 증가가 23,663억 원에 달하는 것으로 발표한바 있다. 설계변경은 표준화가 어려운 건축설계의 특성으로 인해 발생하는 현상으로 발주자의 요구사항변경, 관련 제도, 설계 부적정, 현장여건 등 건설프로젝트 전반에 걸쳐 그 원인이 존재하기 때문에 기본설계 및 중간설계 단계에서 완벽한 설계를 한다 하더라도 설계변경을 예방하고 감소시키는 데에는 한계가 있다. 또한 공사계획 및 시공단계에서 단편적 인 검토만으로 설계변경안을 선정하는 현행 관리프로세스는 또 다른 설계변경을 유발시켜 재시공과 그에 따른 공사비 증가의 주된 원인이 되고 있어, 공사계획 및 시공 중 발생한 설계변경에 효율적으로 대처하는 방안이 요구되고 있다. 이에 본 연구에서는 CM 발주방식의 건축프로젝트를 대상으로 건설사업관리자가 프로젝트 수행 중 발생하는 설계변경에 대하여 다수의 설계변경안을 비용, 성능, 시공성 측면에서 복합적이고 정량적으로 평가하여 적정 설계변경안을 선정할 수 있는 의사결정지원 프로세스의 논리구조와 기본모형을 제시하였다.
Purpose: As the number of people directly employed in making things declines, the cost of labour as a proportion of the cost of production and delivery will diminish too. This will make to move the focus of quality management because new manufacturing techniques make it cheaper and faster to respond to changing local tastes Methods: This discussion is induced by understanding that change the point of view of quality. Results: Mark-processing method using a mold of 3D-printer is different from traditional manufacturing methods. Design, rapid prototyping of products produced by the right way, many changes in many industries will be created. Therefore, the design will be more emphasis on the importance of quality. Conclusion: As manufacturing goes digital, a Quality great change is now gathering pace. It will allow things to be made economically in much smaller numbers, more flexibly and with a much lower input of labour, thanks to new materials, completely new processes such as 3D printing. So we must change the vantage point of quality, from process to Design, R&D, and Delivery.
Classification and Coding(C&C) systems as a core of design information management have been accomplished by many studies in terms of design and manufacturing attribute based on Group Technology. Those are very difficult to apply in make-to-order(MTO) manufacturing because the environment of MTO has various characteristics of product, many licensors, engineering change, insufficiency of integrated management system for codes and so on. This paper presents a suitable C&C system to MTO manufacturing which consider management level and drawing.
As most of information systems developed are data-centric rather than process-centric, it is difficult for users to understand and manage the system from the viewpoint of work processes. To resolve the problem of the data-centric design, we propose a new method to design WFMSs(Workflow Management Systems), which are focused on processes and modified from current information engineering methods. In this research, the drawing approval and engineering change approval process of a K manufacturing company has been analyzed as a sample process. This method takes two steps, i.e., process analysis and system design. In the prosess analysis, data and processes are analyzed, and functions and tasks are derived from the processes. In the system design, a data model for the operation of WFMS is designed, and based on this data model, build-time and run-time functions of WFMS are designed.
최근 정부 공사를 중심으로 기술경쟁이 가능한 설계시공일괄 입찰방식이 확대 적용되고 있는 추세이며 이러한 시장의 변화에 따라서 그 중요성이 더욱 증가할 것으로 예상된다. 일반적으로 설계시공일괄방식의 단위 건설사업 생애주기는 기획, 기본 설계, 입찰, 계약, 상세설계, 착공, 시공, 준공, 평가의 진행단계를 가지게 된다. 계약자의 측면에서 주무부서의 잦은 변화로 효율적인 프로젝트 관리와 일관성 있는 정보의 공유가 어려워지는 문제점이 드러나고 있다. 이러한 문제점을 해결하기 위해 기존의 주무부서에 따른 기능 중심의 관리 체계에서, 프로젝트 중심의 관리 프로세스 체계로의 전환이 필요하다. 본 연구에서는 이러한 필요성에 따라 단위 프로젝트의 진행단계별 관리 프로세스 모델 개발을 목적으로 하였다. 이를 위해서 설계시공일괄방식의 진행단계별 주요 관리 쟁점과 의사결정 사항, 업무 분석을 하였고, 진행단계별 관리 주제의 책임 및 권한과 주요 관리 포인트의 변화를 분석하여 체계화 하였다. 프로젝트 특성별 및 진행단계별 연결고리가 되는 핵심 정보를 정의 하고 정보의 흐름을 분석하였으며, 이를 바탕으로 최종적으로 발주계획 수립 단계부터 실시설계 심의 단계까지의 업무 프로세스를 모델링하고 각 수행 주체별 업무프로세스를 모델링 하여 단위 프로젝트의 진행단계별 관리 프로세스 모델을 개발하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.