Various organizational factors effect successful implementation of IT enabled business transformation. Among them, the most critical success factor is deemed to overcoming change management problem. Lots of studies have been made on Implementation methodologies and business process formalizations to encourage organizational members to accept new business process changes. However, the logic or process redesign still depends on qualitative problem solving techniques mostly depending on basically human intuition such as brainstorming. cause-and-effect analysis. and so on. In this paper, we focused on developing analytic framework to design to-be business process structure. which can complement qualitative problem solving procedures. With effective use of IT as an enabler, we provide algorithmic framework applicable to designing various business process changes such as process automation, business process resequencing, and more radical process integration. The framework follows dynamic programming approach in the literature, which is based on the decision making paradigm of organizations to abstract business processes as quantitative decision models. As such, our research ran fill the gap of limited development of theory based analytic methodologies for business process design, by providing objective rationale to reach the consensus among the organizational members including senior management.
The 5th International Conference on Construction Engineering and Project Management
/
pp.521-524
/
2013
Schedule management of construction work is important in order to complete construction projects within a given period of time. Many efforts have been made and many tools have been developed in order to manage construction projects by a smart device such as smart phones and smart pads. This research proposed a basic design to manage construction schedules via a smart device using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A basic structure was designed for a user to be able to make and change a schedule by touching the smart device's screen. And a prototype was implemented by Adobe Flash/Flex Builder, it is applied to a sample network in a smart phone.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.550-555
/
2011
Utilizing construction knowledge and experiences in design phase can reduce change orders and improve productivity in construction phase. To do so, information must be made available to the design team in time. Current approaches for effective utilization of constructability knowledge, however, only focus on the formalization of constructability knowledge such as a checklist, which lacks the consideration of the appropriate use at the proper point in time. The inadequate use of constructability knowledge can result in unnecessary reworks. To deal with this problem, the design team needs to know what constructability knowledge is required for specific design activities in the design process. This paper presents a constructability implementation model using the dependency structure matrix (DSM) that focuses on information flows between design activities and constructability knowledge. For this objective, design activities in the design process are modeled in a matrix form based on their dependency. Then, constructability knowledge, which needs to be considered in the design stage, is mapped into activities and incorporated into the matrix, creating Constructability-DSM (C-DSM). Next, the partitioning algorithm is applied to C-DSM for optimal information flow. The Partitioned C-DSM is then analyzed based on the relationship between activities. Finally, the optimal utilization of construction knowledge in the design process is determined by identifying what constructability knowledge is required for each design activity, and how and when it is reflected to design for constructability. Thus, this research can help provide robust control actions to reduce unnecessary iterative cycles in design process for efficient constructability implementation.
양산 부산대학교병원 건립공사는 종합병원 의료타운 신축 프로젝트이다. 계획단계부터 건설사업관리자(CMr)가 참가하여 설계 시공일괄사업자를 선정한 후, 실시설계 진행과정을 거쳐 시공단계, 시공이후단계에 이르기까지 프로젝트의 모든 단계에 건설사업관리(CM) 업무를 일관적으로 적용한 사례이다. 또한 설계와 시공의 추진에 Fast Track을 도입하여 공기단축에 성공한 것에 그 의미를 찾을 수 있다. 본 사례는 설계 이전단계에 설계시공일관업체를 선정하였으며, Fast Track수법의 적용을 염두에 둔 설계 및 공사일정계획, 설계단계의 설계관리, Fast Track에 입각한 단계별 공사발주 및 계약관리, 기본설계 실시설계단계의 VE 수행, 시공단계에서의 설계변경 관리, 시공 후 유지관리 단계의 운용관리 등 건설사업관리 업무가 모든 단계에서 다각적으로 제공되었다. 본 보고에서는 상기와 같은 건설사업관리 적용상의 과제와 개선방향, 특히 설계 시공일괄사업에서 효율적으로 CM 업무를 수행할 수 있는 방안을 제시하여, 초대형 턴키(Turnkey) 프로젝트의 CM적용에 기여하고자 한다.
Purpose - Strategic causes for the failure include unrealistic growth, overexpansion, unfamiliar new markets, volume obsession, unrealistic promises and poor project selection. Organizational causes are insufficient capital and profits, lack of business knowledge, poor financial management, poor sales skills, inadequate marketing, poor leadership, poor leadership transfer, project losses, poor field performance and owner bankruptcy. Uncontrollable causes include industry and economic weakness and banking and surety changes. While helpful, the list provides insufficient clarity regarding the causal roots of failure. Research design, data and methodology - The research framework to organize the information involved with many of the recent and large failures in the industry. Results - This research then identified five dominant root causes - excessive egoism, poor strategic leadership, too much change, loss of discipline and inadequate capitalization. Conclusion - Finally, additional input from external forces may accelerate the firm's pace to failure. It is important on the development of diagnostic tools that are based on this model and that will provide new ways to assess a conglomerate's level of risk for incurring a financial crisis.
Power automation system to operate power distribution systems can be distinguished by distribution SCADA with remote monitoring and control; and distribution automation system with basic functions such as service restoration to the distribution SCADA; and distribution management system which is operated by various applications in order to enhance distribution system operation performance based on the distribution automation system. In the technological change, a technical boundary of information technology (IT) and operation technology (OT) is being blurred by that new concepts such as interoperability. In addtion, IT/OT convergence has been proposed by the improvement of ICT and power system technology. At the viewpoint, advanced distribution management system (ADMS) to have the new concepts and to increase distribution system operation efficiency through global information and functions from the other systems has been proposed. In order to implement the ADMS, IT and OT have to be employed together on the ADMS; and the concept-based IT/OT convergence concept has been presented. Therefore, this paper introduces ADMS and IT/OT convergence and proposes a design of IT/OT convergence based ADMS system design with configurations and functions.
HRD 프로페셔널은 계획, 조직 개발, 조직 디자인 등과 같은 전략적인 경영 협력 활동을 통해 생산성의 향상을 도모한다. 특정한 개입 방안만을 제시하는 것은 조직의 기본적인 시스템을 변화시키거나 향상시킬 수 없으므로 시스템적 관점을 지향하는 것은 전략 개발에 중요하다. 조직을 시스템적으로 운영하기 위해 HRD 프로페셔널은 문제해결에 있어서의 조직 내 저항을 잘 다룰 뿐만 아니라 변화관련당사자와의 협업을 통해 제시된 문제해결의 효과를 양적으로 측정할 수 있는 방법을 밝힐 수 있어야한다. 또한 HRD 프로페셔널은 경영 목표들간의 일치 혹은 통일성, 프로세스 디자인, 프로세스 운영에서 핵심적인 역할을 할 필요가 있다. 성과에 대한 정책과 실행을 지역의 문화적 특성을 고려하여 기획하는 것 역시 중요한 과제 중의 하나이다.
This study aims to analyze the influences of LOHAS cuticle management, which based on LOHAS consciousness among customers using nail art shops and removes only Cuticle layer without Eponychium, on the preference and expected value of service quality. Further, it tackles how above related variables have important bearing on reuse intention. A survey was conducted only with customers over the age of 20 in Seoul, Daejeon and Daegu areas in terms of LOHAS consciousness. For the collected 389 data, frequency analysis, t-test, ANOVA, correlation analysis and multiple regression analysis were carried out by using SPSS 18.0 Version statistical package. The results are as follows. First, according to the results, it shows high positive correlation between LOHAS cuticle management based on the consciousness of LOHAS, and LOHAS cuticle management preference, tendency and willingness to transfer toward it. Second. it is proven that LOHAS consciousness tend to be possessed in older age groups, married and a professional employee layers and this LOHAS motivated groups showed high LOHAS cuticle management preference, inclination and intention of a change in management. Lastly, the reuse intention is mostly affected by experience and preference of LOHAS cuticle management. There is negative correlation between reuse intention and experience in blooding and pain during care service. Higher interest in preference of LOHAS cuticle management has highly influenced positive link with the repurchase intention.
This essay talks about research of robust design for quality improvement of production procedure of Wet Etchant. It suggested the optimum design method in consideration of specific capability value that is the way to maximize the quality of product in the production system by using Daguchi parameter design method while finding factors affecting product quality with analysis of production system of product A from producer D. Also, it set long term of 6months as noise factor and let it to be the robust design that can find the optimum condition of control factor that is dull to the changes of each month, that is the change in noise factor. The control factor which affects the product quality is decided as combination method, temperature of raw material, combination time and as there are too many possibilities for combination methods, we performed 4 methods first based on previous research data then derived three ways with product that passed SPEC and set as the factor. As a result of application of optimum production procedure suggested in this essay to the actual production process with its standardization, there was a effect of drop of more than 10particles in comparison to the particle number of previous product and also it brought the effect that resulted the stable number of particle of under 30 that is what the client company suggested.
International journal of advanced smart convergence
/
제10권2호
/
pp.130-137
/
2021
In the current software project, it is still very difficult to extract and define clear requirements in the requirement engineering. Informal requirements documents based on natural language can be interpreted in different meanings depending on the degree of understanding or maturity level of the requirements analyst. Also, Furthermore, as the project progresses, requirements continue to change from the customer. This change in requirements is a catastrophic failure from a management perspective in software projects. In the situation of frequent requirements changes, a current issue of requirements engineering area is how to make clear requirements with unclear and ambigousrequirements. To solve this problem, we propose to extract and redefine clear requirements by incorporating Design Thinking methodologies into requirements engineering. We expect to have higher possibilities to improve software quality by redefining requirements that are ambiously and unclearly defined.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.