• Title/Summary/Keyword: Depth of Excavation

Search Result 363, Processing Time 0.024 seconds

Effects of new construction technology on performance of ultralong steel sheet pile cofferdams under tidal action

  • Li, Ping;Sun, Xinfei;Chen, Junjun;Shi, Jiangwei
    • Geomechanics and Engineering
    • /
    • v.27 no.6
    • /
    • pp.561-571
    • /
    • 2021
  • Cofferdams made of teel sheet piles are commonly utilized as support structures for excavation of sea-crossing bridge foundations. As cofferdams are often subject to tide variation, it is imperative to consider potential effects of tide on stability and serviceability of sheet piles, particularly, ultralong steel sheet piles (USSPs). In this study, a real USSP cofferdam constructed using new construction technology in Nanxi River was reported. The design of key parts of USSP cofferdam in the presence of tidal action was first introduced followed by the description of entire construction technology and associated monitoring results. Subsequently, a three-dimensional finite-element model corresponding to all construction steps was established to back-analyze measured deflection of USSPs. Finally, a series of parametric studies was carried out to investigate effects of tide level, soil parameters, support stiffness and construction sequence on lateral deflection of USSPs. Monitoring results indicate that the maximum deflection during construction occurred near the riverbed. In addition, measured stress of USSPs showed that stability of USSP cofferdam strengthened as construction stages proceeded. Moreover, the numerical back-analysis demonstrated that the USSP cofferdam fulfilled the safety requirements for construction under tidal action. The maximum deflection of USSPs subject to high tide was only 13.57 mm at a depth of -4 m. Sensitivity analyses results showed that the design of USSP cofferdam system must be further improved for construction in cohesionless soils. Furthermore, the 5th strut level before concreting played an indispensable role in controlling lateral deflection of USSPs. It was also observed that pumping out water before concreting base slab could greatly simplify and benefit construction program. On the other hand, the simplification in construction procedures could induce seepage inside the cofferdam, which additionally increased the deflection of USSPs by 10 mm on average.

The gob-side entry retaining with the high-water filling material in Xin'an Coal Mine

  • Li, Tan;Chen, Guangbo;Qin, Zhongcheng;Li, Qinghai;Cao, Bin;Liu, Yongle
    • Geomechanics and Engineering
    • /
    • v.22 no.6
    • /
    • pp.541-552
    • /
    • 2020
  • With the increasing tension of current coal resources and the increasing depth of coal mining, the gob-side entry retaining technology has become a preferred coal mining method in underground coal mines. Among them, the technology of the gob-side entry retaining with the high-water filling material can not only improve the recovery rate of coal resources, but also reduce the amount of roadway excavation. In this paper, based on the characteristics of the high-water filling material, the technological process of gob-side entry retaining with the high-water filling material is introduced. The early and late stress states of the filling body formed by the high-water filling materials are analyzed and studied. Taking the 8th floor No.3 working face of Xin'an coal mine as engineering background, the stress and displacement of surrounding rock of roadway with different filling body width are analyzed through the FLAC3D numerical simulation software. As the filling body width increases, the supporting ability of the filling body increases and the deformation of the surrounding rock decreases. According to the theoretical calculation and numerical simulation of the filling body width, the filling body width is finally determined to be 3.5m. Through the field observation, the deformation of the surrounding rock of the roadway is within the reasonable range. It is concluded that the gob-side entry retaining with the high-water filling material can control the deformation of the surrounding rock, which provides a reference for gob-side entry retaining technology with similar geological conditions.

Research on reinforcement mechanism of soft coal pillar anchor cable

  • Li, Ang;Ji, Bingnan;Zhou, Haifeng;Wang, Feng;Liu, Yingjie;Mu, Pengfei;Yang, Jian;Xu, Ganggang;Zhao, Chunhu
    • Geomechanics and Engineering
    • /
    • v.29 no.6
    • /
    • pp.697-706
    • /
    • 2022
  • In order to explore the stable anchoring conditions of coal side under the mining disturbance of soft section coal pillar in Wangcun Coal Mine of Chenghe Mining Area, the distribution model of the anchoring support pressure at the coal pillar side was established, using the strain-softening characteristics of the coal to study the distribution law of anchoring coal side support pressure. The analytical solution for the reinforcement anchorage stress in the coal pillar side was derived with the inelastic state mechanical model. The results show that the deformation angle of the roadway side and roof increases with the roof subsidence due to the mining influence at the adjacent working face, the plastic deformation zone extends to the depth of the coal side, and the increase of anchorage stress can effectively control the roof subsidence and further deterioration of plastic zone. The roadway height and the peak support pressure have a certain influence on the anchorage stress, the required anchorage stress of the coal side rises with the roadway height and the peak support pressure. The required anchorage stress of the coal pillar side decreases as the cohesion between the coal seam and the roof and floor and the anchor length increases. Then, applied the research result to Wangcun coal mine in Chenghe mining area, the design of anchor cable reinforcement support was proposed for the section of coal pillars side that has been anchored and deformed, which achieved great results and effectively controlled the convergence and deformation of the side, providing a safety guarantee for the roadway excavation and mining.

A Study on the Architectural Aspect of the Sutra Hall and the Promoters of the Rotating-sutra Case Cabinet of the Yeongguk Temple in the Koryo Dynasty (영국사(寧國寺) 대장전(大藏殿)과 전륜장(轉輪藏)의 조성주체와 건축특성)

  • Lee, Kyung-Mee
    • Journal of architectural history
    • /
    • v.20 no.5
    • /
    • pp.95-109
    • /
    • 2011
  • The building for the Sutra appeared as the Sutra-belief became popular in the early years of the Koryo Dynasty. According to the written documents, there were two types of apparatus to keep sutras, one by fixing the cabinet to the wall and the other by rotating the cabinet at the center of the hall. There are no remains. Recently, at the excavation of the site of the Yeongguk Temple (寧國寺) in the Chungcheong Prevince (영동군), a building which was presumed as the Sutra Hall was recovered at the side of the Main Hall. At the center of the building, of 6meters width and 6meters depth, there was a large stone which had a round trace which was presumed to supporting the rotating sutra-case cabinet. By examining the concerned situations, this building was concluded as the Sutra Hall of the temple. The Yeongguk Temple had a close relationship with the royal household. Budddhist monk Gwangji, son of the 16th King Yejong was lived at the Temple. the tomb of King's advisory priest Wongak was also erected at the Temple. Two monks were well known as the defender of the Sutra. The Sutra Hall of the Yeongguk Temple regarded as a significant example which showed us how the archtectural aspect of the Sutra Hall was shaped in the Koryo Dynasty. It could be said that revealing the architectural aspect of the Stura Hall will help revealing the Buddhist architecture of the Koryo Dynsty which is veiled in many field.

Analysis of the Characteristics of the Change in the Moisture Rate of Landfill with Recirculation Water Injection (재순환수 주입에 따른 매립장 함수율 변화특성 분석)

  • Kim, Young-Kyu;Choi, Won-Young;Chun, Seung-Kyu
    • Journal of Soil and Groundwater Environment
    • /
    • v.26 no.5
    • /
    • pp.39-48
    • /
    • 2021
  • Analysis of the change in water content and distribution was conducted according to the supply of recirculation water to a landfill. An excavation sample analysis showed that the recirculation water injection zone had water content 8.8% point higher than that of the non-injection zone, after 8 months of operation. And due to the influence of recirculation water supply by vertical wells in injection zones, the water content increases along with depth more clearly than non-injection zone. According to an electrical specific-resistivity survey after 13 months of operation, the water content got higher towards the bottom of the landfill. The water transmission coefficient is 8.72×10-4 cm/sec for injection zones and 3.36×10-5 cm/sec for the intermediate cover layer; analysis shows that the intermediate cover layer may affect the penetration velocity of water supplied by the horizontal injection tube. For the scientific design and operation of re-injection facilities, it was deemed necessary to follow-up research on the residence time and behavior of re-injection water considering the ratio of recirculation water supply in horizontal and vertical tubes, and pitcher coefficient of intermediate and waste layers.

EPB tunneling in cohesionless soils: A study on Tabriz Metro settlements

  • Rezaei, Amir H.;Shirzehhagh, Mojtaba;Golpasand, Mohammad R. Baghban
    • Geomechanics and Engineering
    • /
    • v.19 no.2
    • /
    • pp.153-165
    • /
    • 2019
  • A case study of monitoring and analysis of surface settlement induced by tunneling of Tabriz metro line 2 (TML2) is presented in this paper. The TML2 single tunnel has been excavated using earth pressure balanced TBM with a cutting-wheel diameter of 9.49 m since 2015. Presented measurements of surface settlements, were collected during the construction of western part of the project (between west depot and S02 station) where the tunnel was being excavated in sand and silt, below the water table and at an average axis depth of about 16 m. Settlement readings were back-analyzed using Gaussian formula, both in longitudinal and transversal directions, in order to estimate volume loss and settlement trough width factor. In addition to settlements, face support and tail grouting pressures were monitored, providing a comprehensive description of the EPB performance. Using the gap model, volume loss prediction was carried out. Also, COB empirical method for determination of the face pressure was employed in order to compare with field monitored data. Likewise, FE simulation was used in various sections employing the code Simulia ABAQUS, to investigate the efficiency of numerical modelling for the estimating of the tunneling induced-surface settlements under such a geotechnical condition. In this regard, the main aspects of a mechanized excavation were simulated. For the studied sections, numerical simulation is not capable of reproducing the high values of in-situ-measured surface settlements, applying Mohr-Coulomb constitutive law for soil. Based on results, for the mentioned case study, the range of estimated volume loss mostly varies from 0.2% to 0.7%, having an average value of 0.45%.

Research on the support of larger broken gateway based on the combined arch theory

  • Yang, Hongyun;Liu, Yanbao;Li, Yong;Pan, Ruikai;Wang, Hui;Luo, Feng;Wang, Haiyang;Cao, Shugang
    • Geomechanics and Engineering
    • /
    • v.23 no.2
    • /
    • pp.93-102
    • /
    • 2020
  • The excavation broken zones (EBZ) of gateways is a significant factor in determining the stability of man-made opening. The EBZ of 55 gateways with variety geological conditions were measured using Ground Penetrating Radar (GPR). The results found that the greatly depth of EBZ, the smallest is 1.5 m and the deepest is 3.5 m. Experimental investigations were carried out in the laboratory and in the coal mine fields for applying the combined arch support theory to large EBZ. The studies found that resin bolts with high tensile strength and good bond force could provide high pretension force with bolt extensible anchorage method in the field. Furthermore, the recently invented torque amplifier could greatly improve the bolt pretension force in poor lithology. The FLAC3D numerical simulation found that the main diffusion sphere of pretension force was only in the free segment zone of the surrounding rock. Further analysis found that the initial load-bearing zone thickness of the combined arch structure in large EBZ could be expressed by the free segment length of bolt. The using of high mechanical property bolts and steel with high pretension force will clearly putting forward the bolt length selection rule based on the combined arch support theory.

A stability study of deep and double-deck tunnels considering shape and reinforcing method of an enlarged section by using numerical analyses (수치해석을 이용한 대심도 복층터널의 확폭단면 형상 및 보강방법에 대한 안정성 연구)

  • You, Kwang-Ho;Jin, Su-Hyun;Kim, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.1
    • /
    • pp.41-56
    • /
    • 2017
  • Recently, the necessity of deep and double-deck tunnels has been grown day by day due to the increase of traffic volume at metropolitans and thus the study on the divergence of those tunnels becomes required. Therefore sensitivity analyses were conducted with FLAC 2D program by selecting ground condition, coefficient of lateral pressure, support pattern, and depth of rock cover as parameters. Ultimately, this study is to find the optimal shape and support method of a diverged section. As the results of this study, it turned out that the box type gave higher stability of the section than arch type unlike the general thought. It can be explained that the arch type has about 30% bigger excavation area than the box type. When the ground conditions are poor, steel pipe grouting reinforcement gives higher stability than rockbolt reinforcement, but its thickness and range do not give a great influence on the stability of the enlarged section.

Development of Prediction Models for Fatal Accidents using Proactive Information in Construction Sites (건설현장의 공사사전정보를 활용한 사망재해 예측 모델 개발)

  • Choi, Seung Ju;Kim, Jin Hyun;Jung, Kihyo
    • Journal of the Korean Society of Safety
    • /
    • v.36 no.3
    • /
    • pp.31-39
    • /
    • 2021
  • In Korea, more than half of work-related fatalities have occurred on construction sites. To reduce such occupational accidents, safety inspection by government agencies is essential in construction sites that present a high risk of serious accidents. To address this issue, this study developed risk prediction models of serious accidents in construction sites using five machine learning methods: support vector machine, random forest, XGBoost, LightGBM, and AutoML. To this end, 15 proactive information (e.g., number of stories and period of construction) that are usually available prior to construction were considered and two over-sampling techniques (SMOTE and ADASYN) were used to address the problem of class-imbalanced data. The results showed that all machine learning methods achieved 0.876~0.941 in the F1-score with the adoption of over-sampling techniques. LightGBM with ADASYN yielded the best prediction performance in both the F1-score (0.941) and the area under the ROC curve (0.941). The prediction models revealed four major features: number of stories, period of construction, excavation depth, and height. The prediction models developed in this study can be useful both for government agencies in prioritizing construction sites for safety inspection and for construction companies in establishing pre-construction preventive measures.

Stress-transfer in concrete encased and filled tube square columns employed in top-down construction

  • Kim, Sun-Hee;Yom, Kyong-Soo;Choi, Sung-Mo
    • Steel and Composite Structures
    • /
    • v.22 no.1
    • /
    • pp.63-77
    • /
    • 2016
  • Top-down construction is a construction technique in which pit excavation and structure construction are conducted simultaneously. Reducing construction time and minimizing noise and vibration which affect neighboring structures, the technique is widely employed in constructing downtown structures. While H-steel columns have been commonly used as core columns, concrete filled steel tube (CFT) columns are at the center of attention because the latter have less axial directionality and greater cross-sectional efficiency than the former. When compared with circular CFT columns, square CFT columns are more easily connected to the floor structure and the area of percussion rotary drilling (PRD) is smaller. For this reason, square CFT columns are used as core columns of concrete encased and filled square (CET) columns in underground floors. However, studies on the structural behavior and concrete stress transfer of CET columns have not been conducted. Since concrete is cast according to construction sequence, checking the stress of concrete inside the core columns and the stress of covering concrete is essential. This paper presents the results of structural tests and analyses conducted to evaluate the usability and safety of CET columns in top-down construction where CFT columns are used as core columns. Parameters in the tests are loading condition, concrete strength and covering depth. The compressive load capacity and failure behavior of specimens are evaluated. In addition, 2 cases of field application of CET columns in underground floors are analyzed.