CONSTRUCTABILITY IMPLEMENTATION MODEL USING DEPENDENCY STRUCTURE MATRIX

  • Youngjib Ham;Moonseo Park;Hyun-Soo Lee
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.550-555
    • /
    • 2011
  • Utilizing construction knowledge and experiences in design phase can reduce change orders and improve productivity in construction phase. To do so, information must be made available to the design team in time. Current approaches for effective utilization of constructability knowledge, however, only focus on the formalization of constructability knowledge such as a checklist, which lacks the consideration of the appropriate use at the proper point in time. The inadequate use of constructability knowledge can result in unnecessary reworks. To deal with this problem, the design team needs to know what constructability knowledge is required for specific design activities in the design process. This paper presents a constructability implementation model using the dependency structure matrix (DSM) that focuses on information flows between design activities and constructability knowledge. For this objective, design activities in the design process are modeled in a matrix form based on their dependency. Then, constructability knowledge, which needs to be considered in the design stage, is mapped into activities and incorporated into the matrix, creating Constructability-DSM (C-DSM). Next, the partitioning algorithm is applied to C-DSM for optimal information flow. The Partitioned C-DSM is then analyzed based on the relationship between activities. Finally, the optimal utilization of construction knowledge in the design process is determined by identifying what constructability knowledge is required for each design activity, and how and when it is reflected to design for constructability. Thus, this research can help provide robust control actions to reduce unnecessary iterative cycles in design process for efficient constructability implementation.

  • PDF

DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구 (Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM))

  • 김승호;김상용;전지훈;안성훈
    • 한국건축시공학회지
    • /
    • 제16권2호
    • /
    • pp.151-159
    • /
    • 2016
  • 건설프로젝트에서 요구되는 중요한 장비 중 하나는 타워크레인 이다. 특히, 대부분의 고층건물 공사에서는 자재들의 이동작업들을 수행하기 위해 타워크레인이 더욱 요구되어진다. 따라서 타워크레인의 양중계획은 공사기간과 비용의 측면에서도 중요하다 할 수 있다. 하지만, 건설현장 대부분의 양중계획은 여전히 합리적인 작업의 분석없이 현장 관리자들의 경험과 직관에 의존하여 행해지고 있다. Dependency structure matrix (DSM)는 CPM과 Pert 같은 기존의 툴과는 다르게 작업 활동 순서 계획과 정보관리를 하는데 있어서 유용한 툴이다. 본 연구는 타워크레인의 양중 관리를 향상시키기 위하여 실제 건설 현장의 Case study를 통해 타워크레인 양중관리의 새로운 틀을 DSM을 이용하여 제시 할 것이다. DSM을 이용한 T/C의 양중계획의 Case study를 통해 나타난 결과는 기준층 양중 계획에 있어서 T/C의 양중계획을 최적화 시키는데 매우 유용하다는 결론을 보여주었다.

DSM을 이용한 건설사업 공정관리에 관한 연구 (A Study on Schedule Management in Construction Project Using the Dependency Structure Matrix(DSM))

  • 장세훈;박문서;이현수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.682-686
    • /
    • 2007
  • 건설사업은 다양한 시대적 요구를 충족시키기 위해 매우 다변화되었고, 그에 따라 참여주체들이 많아지고 복잡성이 증가하게 되었으며, 사업의 규모 측면에 있어서도 날로 대형화되어 가고 있는 실정이다. 하지만 현재의 건설 프로젝트 공정관리 수준은 1950년대에 만들어진 PERT나 CPM을 반세기가 지난 지금까지 그대로 사용하고 있을 정도로 후진성을 면치 못하고 있다. 또한 현재의 공정관리는 결과위주의 방식으로 건설사업 과정에서 나타나는 작업 간의 정보의 흐름과 변이요소의 발생을 충분히 고려하지 못하고 있다. 따라서 본 연구에서는 기존의 공정관리도구들의 단점을 개선하고 공정관리기술의 한계를 극복하기 위하여, 국내에는 잘 알려지지 않은 설계관리기법인 DSM(Dependency Structure Matrix)를 도입하여 건설사업 공정관리에 대한 적용성을 고찰해보고자 한다.

  • PDF

DSM을 활용한 모듈러 건축 설계단계에서의 제작 및 시공 정보 반영 및 재시공 감소 방안 (Design and Planning Process Management for Reducing Rework in Modular Construction Using Dependency Structure Matrix (DSM))

  • 현호상;이현수;이정훈;박문서
    • 대한건축학회논문집:구조계
    • /
    • 제35권2호
    • /
    • pp.29-36
    • /
    • 2019
  • Modular construction has benefits such as short construction duration and high productivity owing to the production in factory and owing to simultaneous on-site work. However, rework occurs in modular construction and the rework affects the efficiency of modular construction. The almost of causes of rework are exist in design process. To reduce the cause of rework, the information flow of the design process should be managed and the plan to reduce rework should be included. However, the modular construction has complex process because of impeded unit production so it is hard to manage the information flow in design process. Moreover, when the plan to reduce rework is included, the design process will be more complicated. Therefore, the objective of this research is to suggest the design process including the rework reduction plan and to alleviate the complexity of design process by using Dependency Structure Matrix(DSM). By using DSM, the iteration and feedback in design process is reduced and it can be expected that rework in modular project can be reduced by using suggested design process.

DSM(Design Structure Matrix)을 이용한 Transmission-Lever 설계과정의 체계화 (Design Process Systematization of Transmission-Lever Using the DSM)

  • 천준원;박지형;김태수
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2002년도 추계학술대회 논문집
    • /
    • pp.763-767
    • /
    • 2002
  • This paper explores a structuring method for solid modeling processes of an automobile automatic transmission-lever design. The aim of this work is to establish standard procedures to minimize iterations and trial and errors during the product development process to increase development time and costs. The design of the transmission-lever is periodically required to be changed with the model change of an automobile. The transmission-lever design process has mainly depended on the designer's experience. It causes to make difficulties to handle the dependency of components. The design process can be improved by resolving the dependency problem using the DSM. The process of applying the DSM provides a systematic way for the solid modeling of transmission-lever by the consideration of geometry dependency.

  • PDF

DSM을 활용한 BIM 기반 설계업무프로세스 정립 및 개선을 위한 연구 -기본설계단계를 중심으로- (A Study on Improvement Plan of BIM-based Design Process using DSM -Focus on the Criteria Design Phase-)

  • 정영호;이주성;함남혁;김주형;김재준
    • 한국CDE학회논문집
    • /
    • 제19권4호
    • /
    • pp.368-389
    • /
    • 2014
  • There are many agendas and discussion subjects for BIM-based Criteria Design phase. At that time, some problems are occurred by software compatibility, simple repetitive tasks, rework caused by missing information etc. In this study, we focus on solving that problems by applying API(Application Programming Interface) method. For effective study, we construct Criteria Design process by using DSM (Dependency Structure Matrix) and study applicability of API. It will be effective for time-consuming task and simply labor-intensive tasks by applying API. we expect improving BIM-based Design Process and Data quality, work productivity without missing information and shapes for using API.

시공성을 위한 Dependency Structure Matrix 기반의 설계 프로세스 관리 모델 개발 (Development of Design Process Management Model using Dependency Structure Matrix for Constructability)

  • 박문서;함영집;이현수;김우영
    • 한국건설관리학회논문집
    • /
    • 제11권5호
    • /
    • pp.65-74
    • /
    • 2010
  • 시공단계의 경험 및 지식을 반영한 설계 결과물은 시공 효율성을 향상시키고 설계변경을 최소화하여 프로젝트의 낭비요인 제거와 전체적인 생산성 향상을 가능하게 해준다. 설계자가 설계단계에서 시공단계의 경험 및 지식을 효과적으로 활용하기 위해서는, 설계과정에서 필요한 시공성 지식을 필요한 시점에 활용할 수 있어야 한다. 설계단계에서 시공성 지식의 효과적인 활용을 위한 기존의 접근방법은 체크리스트와 같이 설계단계 별로 활용되는 시공성 지식의 구조화에 초점을 맞추고, 설계의 사결정과정의 기본단위가 되는 액티비티 수준에서 시공성 지식의 활용시점에 대한 고려가 부족하다. 하지만 적절하지 않은 시점에서 고려된 시공성 지식은 설계자에게 불필요한 재작업을 야기해 설계생산성을 저하시키는 문제를 발생시킬 수 있다. 이러한 비효율적인 정보교환을 최소화하기 위해서는, 설계 프로세스 상에서 정보흐름에 중점을 둔 설계관리를 통해 각 시공성 지식들을 요구하는 설계 액티비티가 무엇인지를 파악해야 한다. 이에 본 연구는 Dependency Structure Matrix(DSM)를 이용하여 설계의사결정과정의 기본단위가 되는 설계 익티비티와 설계과정에서 고려해야 하는 시공성 지식간의 상호관계를 고려한 정보흐름기반의 설계프로세스관리를 제안한다. 이는 설계프로세스관리를 설계단계에서의 단순한 설계검토보다 한 단계 높은, 건설프로젝트 전 과정과 연계된 포괄적인 관리활동으로 발전시켜 건설생산합리화에 크게 기여할 수 있으리라 예상된다.