• Title/Summary/Keyword: Demand factor

Search Result 1,351, Processing Time 0.028 seconds

Improvement Method of Peak Load Forecasting for Mortor-use Distribution Transformer by Readjustment of Demand Factor (호당 수용률 조정을 통한 동력용 배전 변압기 최대부하 예측 개선 방안)

  • Park, Kyung-Ho;Kim, Jae-Chul;Lee, Hee-Tea;Yun, Sang-Yun;Park, Chang-Ho;Lee, Young-Suk
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.41-43
    • /
    • 2002
  • The contracted electric power and the demand factor of customers are used to predict the peak load in distribution transformers. The conventional demand factor was determined more than ten years ago. The contracted electric power and power demand have been increased. Therefore, we need to prepare the novel demand factor that appropriates at present. In this paper, we modify the demand factor to improve the peak load prediction of distribution transformers. To modify the demand factor, we utilize the 169 data acquisition devices for sample distribution transformers in winter, spring summer. And, the peak load currents were measured by the case studies using the actual load data, through which we verified that the proposed demand factors were correct than the conventional factors. A newly demand factor will be used to predict the peak load of distribution transformers.

  • PDF

A Study on the Peak Load Prediction for Molter-use Distribution Transformer (동력용 배전 변압기의 최대부하 예측 개선 방안에 관한 연구)

  • Park, Kyung-Ho;Kim, Jae-Chul;Yun, Sang-Yun;Lee, Young-Suk;Park, Chang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.530-532
    • /
    • 2002
  • The contracted electric power and the demand factor of customers are used to predict the peak load in distribution transformers. The conventional demand factor was determined more than ten years ago. The contracted electric power and power demand have been increased. Therefore, we need to prepare the novel demand factor that appropriates at present. In this paper, we modify the demand factor to improve the peak load prediction of distribution transformers. To modify the demand factor, we utilize the 169 data acquisition devices for sample distribution transformers. The peak load currents were measured by the case studies using the actual load data, through which we verified that the proposed demand factors were correct than the conventional factors. A newly demand factor will be used to predict the peak load of distribution transformers.

  • PDF

Demand response modification factor for the investigation of inelastic response of base isolated structures

  • Cheraghi, Rashid Eddin;Izadifarda, Ramezan Ali
    • Earthquakes and Structures
    • /
    • v.5 no.1
    • /
    • pp.23-48
    • /
    • 2013
  • In this study, the effect of flexibility of superstructures and nonlinear characteristics of LRB (Lead Rubber Bearing) isolator on inelastic response of base isolated structures is investigated. To demonstrate the intensity of damage in superstructures, demand response modification factor without the consideration of damping reduction factor, demand RI, is used and the N2 method is applied to compute this factor. To evaluate the influence of superstructure flexibility on inelastic response of base isolated structures, different steel intermediate moment resisting frames with different heights have been investigated. In lead rubber bearing, the rubber provides flexibility and the lead is the source of damping; variations of aforementioned characteristics are also investigated on inelastic response of superstructures. It is observed that an increase in height of superstructure leads to higher value of demand RI till 4-story frame but afterward this factor remains constant; in other words, an increase in height until 4-story frame causes more damage in the superstructure but after that superstructure's damage is equal to the 4-story frame's. The results demonstrate that the low value of second stiffness (rubber stiffness in LRBs) tends to show a significant decrease in demand RI. Increase in value of characteristic strength (yield strength of the lead in LRBs) leads to decrease in the demand RI.

A Study on the Relations Between Curriculum Determinant Factors and Composition Factors -Focus on Department of Information Management- (교육과정 결정 요인과 교육 과목 구성에 관한 연구 -정보관련 학과를 중심으로-)

  • 김정열
    • Journal of the Korea Society of Computer and Information
    • /
    • v.5 no.4
    • /
    • pp.211-217
    • /
    • 2000
  • The Curriculum Determinant Factors of Information Management are identified Manpower Demand Factor, Department Associate Perception Factor, Imitation Factor, Education Demand Factor. The result of This Study proposed that Computer Science Field, IT Field, Internet Field had to Include to Curriculum of Information management. In Addition, The Result of This Study is identified that Curriculum Determinant Factor is related to Composition Factor. Manpower Demand factor Department Associate Perception Factor are important to Curriculum Determinant. And IT Field, Computer Science Field are critical to curriculum of Information Management.

  • PDF

Sensitivity Analysis of the Power System Considering the Load Power Factor While using Direct Load Control (부하 역률을 고려한 직접부하제어 실행시 계통의 민감도 분석)

  • Chae, Myeong-Suk
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.4
    • /
    • pp.333-336
    • /
    • 2015
  • Recently, the power load is growing larger and because of the environmental limitation of generation, the expansion of generation facilities are becoming more difficult. For that reason the importance of the demand-side resources come to be higher. One method of the demand-side resource, the DLC Program, has executed, and moreover, the loads which are available to be controlled are increasing. It should be considered of some kinds of power system components such as DLCs, because the fact that using the demand resources will be an important part of the power system. This paper considers the power factor of the load-bus which is shedded in the direct load control program. and then analyze the power system using flow sensitivity and voltage sensitivity. In this paper, we assumed two scenarios through the rank of the load power factor at each bus and to compare and evaluate each case, we used Power World for the simulation.

A Study on the Reasonable Design Standard and Countermeasures of the Demand Factor (변전설비 용량기준의 합리화 방안 및 대책에 관한 연구)

  • Yoo, H.J.;Ha, B.N.;Nam, K.D.;Pak, S.M.;Cho, N.H.
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.902-904
    • /
    • 1996
  • In this paper, we proposed the reasonable design standard and countermeasures of Demand Factor for large office buildings, that was made by the statistical way considering actual conditions, such as investicated electric equipment capacity, electric power consumption, etc. So as to save electric equipment investment, the decrease of power loss, the improvement of facilities utilization and the decrease of electric rates, we can be contributed by the application of the design standard. The result of saving effect is showed to confirm the practical use of the proposed Demand Factor, and also, it is believed that this proposed Demand Factor will be useful in electric equipment operation and planning.

  • PDF

A Study on Factors Influencing Fire Service Power - An Analysis of the Fundamental Variable for Fire Service Budget - (소방력에 영향을 미치는 요인에 관한 연구 - 소방예산의 기본변수분석을 중심으로 -)

  • Kim, Jin-Dong
    • Fire Science and Engineering
    • /
    • v.22 no.2
    • /
    • pp.9-19
    • /
    • 2008
  • Recently the systematic change in the fire and disaster prevention administration, which was less studied than other administrative systems, has been in progress. In particular, the fire service demands are increasing and forms are diversified. The first thing you must do is to make up the fire service power according to the fire service demands. Such an allocation results in social welfare satisfaction. The purpose of this study is to investigate the determinants of fire service force. And this study investigates that fire service demand is affected by socioeconomic factor. To do this, this study reviews fire service force, the fire service demand, socioeconomic factor and financial factor. And this study sets up four hypotheses based on the theoretical backgrounds and the past research. The statistical method used for the verification of hypotheses are multiple regression analysis and structural equitation analysis. The analysis showed that fire service demand and financial factor were positive significant variable for fire service power. But socioeconomic factor was a negative significant variable. Also the analysis showed that social factor was a positive significant variable and economic factor was a negative significant variable for fire service demand.

An Empirical Analysis on Public Transportation Demand and TOD Design Factors in Seoul subway adjacent area (서울시 역세권의 TOD환경과 대중교통이용수요 관계분석)

  • Moon, Young-Il;Rho, Jeong-Hyun
    • International Journal of Highway Engineering
    • /
    • v.13 no.4
    • /
    • pp.211-220
    • /
    • 2011
  • TOD(Transit Oriented Development) has recently been active, which presents that TOD planning elements should be comprehensively taken into consideration in order to enhance domestic transit ridership by changing environments in rail station areas and an empirical analysis on the type of rail station areas and transportation demand should be a prerequisite for usage of future development planning. This study aims to grasp a variety of TOD of influence factors in Seoul rail station area and to perform analysis to identify relationship between public transportation demand and these TOD design factors. To make it come true, we gathered data with respect to Density, Diversity, and Accessibility as representative TOD planning elements and carried out factorial and regression analysis. Consequently, we drew 7 influence factors base on factorial analysis: Factor 1(Diversity/ -Use Mix(LUM)), Factor 2(Density/development density), Factor 3(Accessibility/public transportation facility supply), Factor 4(Design/street design), Factor 5(Green/access mode (pedestrian, bike), Factor 6(Design/subway size), Factor 7(Accessibility/Public transit operation) As the result of model development by using factorial and regression analysis, positive influence factors on passenger flow in rail station area are Factor 1(Diversity : Land-Use Mix), Factor 3(Accessibility : public transportation facility supply), Factor 2(Density : development density), Factor 5(Design/ access mode) and Factor 6(subway size) Next, negative influence factor on passenger flow in rail station area shows Factor 7(Accessibility/Public transit operation) as the most influential factor. This is because the growth of service interval of linked subway and bus leads to reduced demand.

A Study on Simultaneous Load Factor of Intelligent Electric Power Reduction System in Korea (한국의 지능형 전력동시부하율 저감시스템에 관한 연구)

  • Kim, Tae-Sung;Lee, Jong-Hwan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.1
    • /
    • pp.24-31
    • /
    • 2012
  • This study is designed to predict the overall electric power load, to apply the method of time sharing and to reduce simultaneous load factor of electric power when authorized by user entering demand plans and using schedules into the user's interface for a certain period of time. This is about smart grid, which reduces electric power load through simultaneous load factor of electric power reduction system supervision agent. Also, this study has the following characteristics. First, it is the user interface which enables authorized users to enter and send/receive such data as demand plan and using schedule for a certain period of time. Second, it is the database server, which collects, classifies, analyzes, saves and manages demand forecast data for a certain period of time. Third, is the simultaneous load factor of electric power control agent, which controls usage of electric power by getting control signal, which is intended to reduce the simultaneous load factor of electric power by the use of the time sharing control system, form the user interface, which also integrate and compare the data which were gained from the interface and the demand forecast data of the certain period of time.

Identifying Supply-demand Relationships on Ecosystem Services Using Socio-ecological Approach in Gyeong-gi Province (사회-생태계 이론을 활용한 경기도 지역 생태계서비스 공급-수요관계 분석)

  • Park, Yoon-Sun;Kim, Choong-Ki;Lee, Jae-Hyuck;Song, Young-Keun;Hong, Hyun-Jeong
    • Journal of Korean Society of Rural Planning
    • /
    • v.27 no.3
    • /
    • pp.35-46
    • /
    • 2021
  • Ecosystem services play a role in promoting sustainable development by contributing to human welfare. For sustainable development, a balance between supply and demand for ecosystem services must be made. In this regard, in this study, factor analysis was performed using the results of measuring ecosystem services for the supply of ecosystem services and national statistical data representing socio-economic factors for demand for ecosystem services The results of analysis for Gyeong-gi Province are as follows. The service supply based on the result of ecosystem services was divided into the mixed service provisioning as factor1, the food provisioning as factor2, and the P retention service provisioning area as factor3. As for the demand for services based on socio-economic factors, factor1 is divided into urbanized areas, factor2 is forest development area, and factor3 is agricultural activity development area. Local governments that maintain balance were evaluated as Pocheon, Yangpyeong, Icheon, Pyeongtaek, Goyang, Suwon, Gwangmyeong, and Osan, and imbalanced local governments appeared in Gimpo, Uiwang, Anseong, and Yeoju. A management plan to maintain the balance between supply and demand of ecosystem services was suggested. The analysis method and results of this study are expected to be applicable to various local governments through regional expansion.