A STUDY ON THE SELECTION CRITERIA OF DELIVERY SYSTEM BY TYPES OF THE PUBLIC CONSTRUCTION PROJECTS

  • Eun-A Choi;Su-Man Choi;Jai-Dong Koo;Nam-Gi Lim;Sang-Beom Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1440-1445
    • /
    • 2009
  • Clients demands have been changed by construction circumstances such as high-technology, megaprojects, and the complexity of construction. Advanced foreign nations have already introduced and applied new project delivery systems (i.e, CM, DB, etc.) to deal with the change of such that. Korea has also promoted variation of the delivery systems for the progressive measure to the rapid changeable situation. Even though government has made his efforts as stated above, some clients have uniformly used those to public construction projects. That is because there are not selection criteria of project delivery system for clients. Therefore, this study presented the selection criteria of project delivery system based on project types in the public large construction projects. In addition, the study has verified the viability of the presented models through consultation with professionals and experts.

  • PDF

The Improvement Plan of Project Delivery Systems in the Public Construction Projects (공공건설사업의 발주방식 개선방안)

  • Choi, Eun-A;Kim, Hyun;Park, Sung-Yong;Cho, Hyeong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.509-512
    • /
    • 2008
  • Clients demands have been changed by construction circumstances such as high-technology, mega-projects, and the complexity of construction. Advanced foreign countries have already introduced and applied new project delivery systems(i.e, CM, DB, etc.) to deal with the change of such that. Recently, Korea also launched two new project delivery systems, "Best Value Contracts to which the State is a Party" to provoke the project delivery system, which helps a public owner select a project delivery system appropriate to the project characteristics. Even though government has made his efforts as stated above, some clients have still used those to public construction projects uniformly. That is because there are not a selection criteria of project delivery system for clients. Therefore, this paper proposes the selection criteria of project delivery system based on project types in the public large construction projects.

  • PDF

FUZZY APPROACH TO PROJECT DELIVERY SYSTEM SELECTION

  • F. Nasirzadeh;N. Naderpajouh;A. Afshar;A. Etesami
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.662-671
    • /
    • 2007
  • Since variety of construction projects with their individual specifications could be handled through different procurement systems, selection of the most appropriate project delivery system is a vital step towards more efficient project execution. The appropriate selection of project delivery system may also ensure more competent management of the project. Its impacts are not only limited to the first stages of the project, as it could also influence pre-construction, construction and operational phases of the project. Among different approaches exerted for this purpose, none has taken uncertainty into account, despite the fact that during first stages of the project most of the selection factors are still uncertain and not clearly defined. This paper, hence, aims to provide a fuzzy insight into the project delivery system selection. Through this approach more tangible model of the evaluation process may be presented. Proposed fuzzy method is indeed a multi criteria decision making model, based on the group of criteria, assigned for the evaluation procedure. A case study is also conducted, based on the opinion of an invented group of the experts.

  • PDF

Project Delivery Systems and Project Performance;An Evaluation Model for Public Construction Projects (공공건설사업의 발주방식 선정 및 성과평가 모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.41-47
    • /
    • 2007
  • The selection of the reasonable project delivery system (PDS) is crucial for a successful performance of a project, which means to achieve project objectives. Furthermore, the project performance has been tightly related to the selection of PDS appropriate to pertinent project characteristics. In this context, the ministry of finance and economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". For efficient operation of the new project delivery systems, this paper suggested a PDS selection model which supports decision making of the reasonable PDS for a pertinent project by assessing characteristics of the public construction projects, both quantitatively and qualitatively. In addition, a PDS performance evaluation model was proposed in order to get feedback on the result of the PDS selection and the operation for the succeeding project. The standard models suggested in this paper might be used as a tool to support the decision making of the public organizations.

  • PDF

A study on the electronic document delivery systems (전자식 문헌전송 시스팀에 관한 고찰)

  • 박준식;김정현
    • Journal of Korean Library and Information Science Society
    • /
    • v.16
    • /
    • pp.191-220
    • /
    • 1989
  • This study is an attempt to furnish some helpful data for the design and implementation of the electronic document delivery system based on the analysis of it's cases. To begin with, the concepts and basic models of electronic document delivery system(Fig. 1) were overviewed in the second chapter, on the basis of which the concrete cases were introduced in the third chapter ; ADONIS Project, ARTEMIS Project, HERMES Project, APOLLO Project, UNIVERSE Project, DOCDEL Project, and etc. In the future rapidly developed the technology of electronic communication, there are many possibilities of the evolution of electronic document delivery system.

  • PDF

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

A Project Delivery System Selection Model for Large Public Construction Projects (대형 공공공사의 적정 발주방식 선정모델)

  • Hyun Chang-Taek;Seo Yong-Chil;Lee In-Keun;Ryu Kil-Sang;Lee Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.71-80
    • /
    • 2000
  • Project delivery systems determine the relationship, responsibility, authority and the scope of works of those involved in project, hence, optimum project delivery system should be selected to so that construction project would be executed successfully, Until now, the traditional design-bid-build mainly has been used for public projects, but the government is making efforts actively to introduce other methods such as design-build, alternative bidding by its policy. However, delivery systems should be determined through considering physical projects characteristics, owner's goals, external factors, etc, rather than government' policy. Therefore, the purpose of this research is to propose objective delivery system selection criteria and delivery system selection model, which help owners to select the suitable delivery system through quantitative and reasonable manner.

  • PDF

AA Study on the Selection Criteria for Delivery Systems of Public Construction Projects in Local Governments (지자체 공공건설사업의 발주방식 선정기준에 관한 연구)

  • Choi, Eun-A;Kim, Byung-Ok;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.111-117
    • /
    • 2009
  • With the current trend in the industry toward increasingly complex, diversified and large construction projects, advanced countries in the construction field have already introduced and applied a variety of methods for placing orders in order to cope with such changes in construction circumstances. In Korea, there have been efforts to continuously improve approaches to placing an order. With the aim of diversifying the methods of Delivery Systems, the "Technical Proposal Type Bid," and the "Design Competition and Technical Proposal Type Bid" were introduced through a revision of Korea's contract law enforcement ordinance. In line with the government's efforts, criteria for a method of placing an order that is suitable for a public construction project should be presented. This study enumerates the current issues using a survey for construction projects already placed and an analysis of the current status, and presents the selection criteria for Delivery Systems by business type as an improvement for the problem.

CONNECTING TECHNOLOGY, INDUSTRY AND RESEARCH: A VERTICAL INTEGRAL PROJECT COURSE FOR BIM EDUCATION OPPORTUNITIES

  • F. H. (Bud) Griffis;Mei Liu;Andrew Bates
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.252-259
    • /
    • 2013
  • Building Information Modeling (BIM) is utilizing CAD technology in a way that ultimately ties all the components of a building together as objects imbedded with information, and has been changing the way we design and build over the last 20-30 years. In Polytechnic Institute of NYU, there are four BIM courses offered which provide students with different levels of knowledge regarding BIM Technique, BIM Standards, BIM Guideline and Roadmap for Private and Public Implementation, BIM Application in Real Projects, the Cooperation of BIM and IPD for Public Works in New York City. With advanced BIM technology, BIM's integration into the construction process and its incorporation into project delivery systems, especially Integrated Project Delivery (IPD) are the bridges between technology, industry and research. This paper presents an integrated BIM curriculum with three modules: 1) BIM functions and Bid Preparation; 2) Time-Cost Trade-off Analysis; and 3) Problems Solving in BIM/IPD Environment. In this project-based curriculum developed by the common efforts of academia, public agency and industry, the objectives are: (1) to provide the information and skills needed to successfully implement BIM into the construction phase; (2) to identify BIM's role in construction and the project delivery system; (3) to develop a module in conjunction with leading BIM into project delivery system, particularly coordination between BIM and IPD; (4) to connect technology and research into industry. The course assessment was conducted and the results indicate that it is a successful reform in construction management education.

  • PDF

Innovation Strategy for Manufacturing in Korea based on Collaboration (기업간 상생협력 기반 한국형 제조혁신 전략)

  • Lee, Seok-Woo;Ryu, Kwang-Yeol;Nam, Sung-Ho;Hong, Won-Pyo;Choi, Hon-Zong
    • Proceedings of the KSME Conference
    • /
    • 2007.05a
    • /
    • pp.1328-1333
    • /
    • 2007
  • Unpredictable customer demands make manufacturers to make quality products with cheaper price and shorter delivery. To survive in the global market, the manufacturing industry needs to equip with advanced technologies including IT. Under this situation, "collaboration"is the best solution for manufacturers to survive and to grow their company instead of competition. With this strategy, we have conducted a project(e-Manufacturing). The companies participate to the project attained the amazing results by utilizing collaboration systems such as delivery shortened and increase in sale/profit. Since the strategy of the project is assessed to be very useful to increase competition power of manufacturers, the project will be enlarged to cover wider application domains with a new project name called "i-Manufacturing". In this paper, therefore, we introduce the specific output from the e-Manufacturing project and the specific strategies/plans of i-Manufacturing project.

  • PDF