• 제목/요약/키워드: Delayed Neutron Monitoring System Tubing

검색결과 1건 처리시간 0.014초

월성1호기 계속운전 관련 결함연료위치탐지계통 배관의 열화관리평가 (Assessment on Aging Management of Delayed Neutron Monitoring System Tubing for Continued Operation of Wolsong Unit 1)

  • 송명호;김홍기;이영호
    • 한국압력기기공학회 논문집
    • /
    • 제7권2호
    • /
    • pp.14-20
    • /
    • 2011
  • The end of design lifetime for Wolsong unit 1 will be reached on 20th November in 2012. So the license renewal documents for the continuous operation of Wolsong unit 1 is under reviewing now. Major components of primary system such as pressure tubes, feeder pipes including delayed neutron monitoring system tubing are being replaced and many components of secondary system are also being repaired. In this paper, the assessment on the wear degradation of delayed neutron monitoring system tubing(on the other hand, DN tube was called) was performed for the ageing management of the same component. The wear defects of this component was one of causes that resulted in heavy water leakage accidents. Therefore design specifications of Wolsong uint 1 and heavy water leakage accidents of pressurized heavy water reactors were reviewed and causes of wear defect for DN tubes were analyzed. Wear propagation equations based on the heavy water leakage history were made and the proper repairing time was possible to be expected if the continued operation was considered. Finally design change items of DN tubes that were conducted for the long term operation of Wolsong unit 1 are introduced.