• Title/Summary/Keyword: Delay section

Search Result 170, Processing Time 0.025 seconds

Constructing the Models Estimated for Speed Variation on the Merge Section in the Freeway (고속도로의 합류구간내 속도변화 추정모형 구축에 관한 연구)

  • 신광식;김태곤
    • Journal of Korean Port Research
    • /
    • v.13 no.1
    • /
    • pp.113-122
    • /
    • 1999
  • Congestion and traffic accidents occur on the merge and diverge sections in the interchange of the freeway. Studies have been conducted to reduce the traffic delay and accidents on the merge section in the freeway since 1960s. but a study was not conducted to estimate the speed variation on the merge section construct models estimated for the speed variation and suggest the appropriate measures. The purpose of this study was to identify the traffic flow characteristics on the merge section in the freeway construct the models estimated for the speed variation on the merge section in the freeway and finally establish the appropriate measure for reduction of traffic delay and accidents on the merge section in the freeway. The following results were obtained: I) Speed variations in the urban freeway appeared to be about 3.2mph, 6.5mph and 7.4mph based on the morning peak period, afternoon peak period and 24-hours period but those in the suburban freeway appeared to be about 8.0mph, 11.1mph and 10.1mph based on the same periods respectively. So different speed reduction signs need be installed to reduce delay and accidents on the merge section in the freeway based on the areas and periods as the freeway traffic management system(FTMS). ii) These models estimated for speed variation need to be studied with the changeable message sign(CMS) technique based on the real-time data so that the traffic flow could be maximized and the traffic delay and accidents be on the merge section in the freeway as more efficient freeway traffic management system(FTMS) in the near future.

  • PDF

Sound recognition and tracking system design using robust sound extraction section (주변 배경음에 강인한 구간 검출을 통한 음원 인식 및 위치 추적 시스템 설계)

  • Kim, Woo-Jun;Kim, Young-Sub;Lee, Gwang-Seok
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.11 no.8
    • /
    • pp.759-766
    • /
    • 2016
  • This paper is on a system design of recognizing sound sources and tracing locations from detecting a section of sound sources which is strong in surrounding environmental sounds about sound sources occurring in an abnormal situation by using signals within the section. In detection of the section with strong sound sources, weighted average delta energy of a short section is calculated from audio signals received. After inputting it into a low-pass filter, through comparison of values of the output result, a section strong in background sound is defined. In recognition of sound sources, from data of the detected section, using an HMM(: Hidden Markov Model) as a traditional recognition method, learning and recognition are realized from creating information to recognize sound sources. About signals of sound sources that surrounding background sounds are included, by using energy of existing signals, after detecting the section, compared with the recognition through the HMM, a recognition rate of 3.94% increase is shown. Also, based on the recognition result, location grasping by using TDOA(: Time Delay of Arrival) between signals in the section accords with 97.44% of angles of a real occurrence location.

A Study on the Traffic Effect Zone and Application of Road Occupying Construction (도로 공사중의 교통영향권역 설정 및 적용성에 관한 연구)

  • Lee, Ju-Ho;Lee, Young-Woo;Lim, Chae-Moon
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.6 no.2
    • /
    • pp.131-139
    • /
    • 2003
  • The links operating interrupted flow are intend to yield the traffic between the out flow and inflow part effect zone of street section, we build the delay model using the time gap between under construction and not. We review the applicability of interrupted flow, and thus we can put this data to practical use as the basis data to compute the inducement charge for traffic delay. Also building about traffic effect zone of interrupted flow wouldn't produce at the section beside occupying roads and construction cross section, thus we must review the plan to minimize traffic delay by the construction occupying road. In future there must be advanced the incomplete in this study, and groping for the various alternatives to minimize the traffic delay by the road occupying construction, with developing the various sets of detailed analyzing models, that is analysis on the street strength, crossroads geometrical forms of crossroads, public traffics, pedestrians, occupying types.

  • PDF

Novel Section-Based Joint Network Coding and Scheduling Scheme in WMNs: JNCS

  • Cha, Jae Ryong;Baek, Gwang Hun
    • ETRI Journal
    • /
    • v.37 no.2
    • /
    • pp.380-386
    • /
    • 2015
  • Guaranteeing quality of service over a multihop wireless network is difficult because end-to-end (ETE) delay is accumulated at each hop in a multihop flow. Recently, research has been conducted on network coding (NC) schemes as an alternative mechanism to significantly increase the utilization of valuable resources in multihop wireless networks. This paper proposes a new section-based joint NC and scheduling scheme that can reduce ETE delay and enhance resource efficiency in a multihop wireless network. Next, this paper derives the average ETE delay of the proposed scheme and simulates a TDMA network where the proposed scheme is deployed. Finally, this paper compares the performance of the proposed scheme with that of the conventional sequential scheduling scheme. From the performance analysis and simulation results, the proposed scheme gives more delay-and energy-efficient slot assignments even if the NC operation is applied, resulting in a use of fewer network resources and a reduction in ETE delay.

Application of Percentile Speed for Appraisal of Road Section with Recurring Congestion (상습 지체구간 선정을 위한 Percentile 속도의 활용)

  • Kim, Hyung Gon;Lee, Ki Young;Lee, Soong Bong;Chang, Myungsoon
    • International Journal of Highway Engineering
    • /
    • v.16 no.5
    • /
    • pp.165-171
    • /
    • 2014
  • PURPOSES : The objective of this study is to find Percentile Speed($V_p$) for Appraisal of Road Section with Recurring Congestion. METHODS : Percentile Speed($V_p$) is determined by correlation analysis of CSI that proposed existing literature. and CSI(Consistency Service Index) is a index that subtract service fail frequency from 100 points, and service fail is defined as traffic situation is driving less than 80kph speed. In this study, We analyzed the highest correlation percentile speed associated with CSI. This speed is chosen as a delay decision speed. In order to verifying reliability, it performed a comparison with the previous method. RESULTS : As a result, 30 percentile speed($V_{30}$) was decided as index speed for judgement of recurring congestion section, and through comparison with existing methods, we demonstrated that 30 percentile speed can be useful for judgement of recurring congestion section. CONCLUSIONS : This method to Determine recurring congestion section using the percentile speed($V_{30}$) was proposed for the first time in this paper. This method can be applicated more quickly and easily than existing method for determining of recurring delay section.

Development of Consistency Service Index for Deciding Habitual Congestion Section (상습지체구간 결정을 위한 일관성 서비스지수(CSI) 개발)

  • Lee, Ki Young;Choi, Kee Choo;Son, Bum Soo;Kim, Hyung Gon;Lee, Soong Bong
    • International Journal of Highway Engineering
    • /
    • v.15 no.5
    • /
    • pp.227-234
    • /
    • 2013
  • PURPOSES : In order to do an improving countermeasures for congestion on the highway with a limited budget, it is very important to select a habitual congestion section effectively. This study is develop CSI(Consitency Service Index) which contained the service for drivers on the highway to select a habitual congestion section. METHODS : By applying the concept of service for the users paying a fee, proposed CSI(Consistency Service Index) to determine habitual delay. CSI is mean that users using the highway road must be provided an environment which can driving more than 80kph, anytime, anywhere. RESULTS : The result applying developed method in this study included most of congestion sections selected by conventional method. but, in some section of existing non-congestion section were included by CSI. The annual average speed and CSI correlation analysis result was high correlation. This result proved that CSI was reflecting road traffic condition well. CONCLUSIONS : It was verified practicality from the delay section of gyeonggi-do area highway. we can judge whether or not to be a habitual congestion in the specific highway and do the traffic improving countermeasures accordingly.

Distributed generation protection technique to minimize the outage section (정전구간 최소화를 위한 방향과전류계전기 기반 분산전원 보호 방법)

  • Kang Yongcheol;Lee Byungeun;Kim Eunsuk;Hwang Taekeun;Lee Jihoon;Cha Sunhee;Park Jongmin;Jung Taeyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.80-82
    • /
    • 2005
  • Distributed generation (IX;) plays an important role in the power system nowadays. Over-current relay, widely used in the DG protection, causes a wide outage section and long time delay. This paper proposes a DG protection technique to minimize the outage section. The proposed method uses three directional over-current relays with delay, which are connected to the point of common coupling. The method can minimize the outage section.

  • PDF

Distributed generation protection technique to minimize the outage section (정전구간 최소화를 위한 분산전원 보호)

  • Kang, Yong-Cheol;Lee, Byung-Eun;Jin, Enshu;Hwang, Tae-Keun;Lee, Ji-Hoon;Cha, Sun-Hee;Park, Jong-Min;Zheng, Tai-Ying
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.450-452
    • /
    • 2005
  • Distributed generation (DG) plays an important role in the power system nowadays. Over-current relay, widely used in the DG protection, causes a wide outage section and long time delay. This paper proposes a DG protection technique to minimize the outage section. The proposed method uses three directional over-current relays with time delay, which are connected to the point of common coupling. The method can minimize the outage section.

  • PDF

Construction of Delay Predictive Models on Freeway Ramp Junctions (고속도로 진출입램프 접속부상의 지체예측모형 구축에 관한 연구)

  • 김정훈;김태곤
    • Journal of Korean Port Research
    • /
    • v.14 no.2
    • /
    • pp.175-185
    • /
    • 2000
  • Today freeway is experiencing a severe congestion with incoming or outgoing traffic through freeway ramps during the peak periods. Thus, the purpose of this study is to identify the traffic characteristics, analyze the relationships between the traffic characteristics and finally construct the delay predictive models on the rap junctions of freeway with 70mph speed limit. From the traffic analyses, and model construction and verification for delay prediction on the ramp junctions of freeway, the following results were obtained : ⅰ) Traffic flow showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period. ⅱ) The occupancy also showed a big difference depending on the time periods, and the downstream occupancy(Od) was especially shown to have a higher explanatory power for the delay predictive model construction on the ramp junctions of freeway. ⅲ) The delay-occupancy curve showed a remarkable shift based on the occupancies observed : O$\_$d/〈9% and O$\_$d/$\geq$9%. Especially, volume and occupancy were shown to be highly explanatory for delay prediction on the ramp junctions of freeway under O$\_$d/$\geq$9%, but lowly for delay prediction on the ramp junctions of freeway under O$\_$d/〈9%. Rather, the driver characteristics or transportation conditions around the freeway were thought to be a little higher explanatory for the delay prediction under O$\_$d/〈9%. ⅳ) Integrated delay predictive models showed a higher explanatory power in the morning peak period, but a lower explanatory power in the non-peak periods.

  • PDF

A New Cross Section Design Concept for Better Efficiency in Two-Lane Highways (2차로도로 효율성 제고를 위한 횡단면 설계 방안)

  • Shim Kywan-Bho;Choi Jai-Sung
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.75-85
    • /
    • 2006
  • Currently, cross-section design can not reflect highway function and traffic volume, various construction. This research paper provides analysis of traffic accident type, improvement of traffic operation and safety, assessment for new cross-section standards of two-lane highway. Research show higher accident rate on 6$\sim$8.9m road than 9$\sim$12.9m road width in two-lane highway. Typical improvement is widening on lane and shoulder width. Simulation show large increase on 6$\sim$7m road delay-time in 1,200vph. In contrast 10$\sim$11.5m road shows slight change on delay-time. This research paper provides various cross-section construction by traffic volume in minor arterial and distributor two-lane highway. The new cross-section design provides adopting highway volume, various construction and flexibility.

  • PDF