• Title/Summary/Keyword: Delay days

Search Result 413, Processing Time 0.024 seconds

An Adaptive FEC based Error Control Algorithm for VoIP (VoIP를 위한 적응적 FEC 기반 에러 제어 알고리즘)

  • Choe, Tae-Uk;Jeong, Gi-Dong
    • The KIPS Transactions:PartC
    • /
    • v.9C no.3
    • /
    • pp.375-384
    • /
    • 2002
  • In the current Internet, the QoS of interactive applications is hardly guaranteed because of variable bandwidth, packet loss and delay. Moreover, VoIP which is becoming an important part of the information infra-structure in these days, is susceptible to network packet loss and end-to-end delay. Therefore, it needs error control mechanisms in network level or application level. The FEC-based error control mechanisms are used for interactive audio application such as VoIP. The FEC sends a main information along with redundant information to recover the lost packets and adjusts redundant information depending on network conditions to reduce the bandwidth overhead. However, because most of the error control mechanisms do not consider end-to-end delay but packet loss rate, their performances are poor. In this paper, we propose a new error control algorithm, SCCRP, considering packet loss rate as well as end-to-end delay. Through experiments, we confirm that the SCCRP has a lower packet loss rate and a lower end-to-end delay after reconstruction.

The Effects the Composite Differences of the Transferred Vascular Tissues and the Surgical Delay on the Vascularization of the Prefabricated Cutaneous Flap (전위혈관조직의 성상과 외과적 지연처치가 선조작 피부피판의 혈관화에 미치는 효과)

  • Kim, Sang Bum;Won, Chang Hoon;Dhong, Eun Sang;Han, Seung Kyu;Park, Seung Ha;Kim, Woo Kyung;Kim, Young Jo;Lee, Byung Il
    • Archives of Plastic Surgery
    • /
    • v.32 no.3
    • /
    • pp.327-334
    • /
    • 2005
  • This study was designed to investigate the effect of the surgical delay in the prefabricated cutaneous flap. Abdominal skin flaps (n=40), $4.5{\times}6.0cm$ in size, were created by the subcutaneous implantation of a saphenous vascular tissue in the male Sprague-Dawley rats. In the groups 1 and 2, the pedicle was skeletonized. In the groups 3 and 4, perivascular muscle cuff or gracilis fascia was retained, respectively. Six weeks later, each flap was elevated as an island flap and reposed in place. All flaps of the group 2 had a 72-hours of delay period. Five days after the flap repositioning, estimation of flap viability, microangiographies, and histological evaluation of vessel development were performed. The groups 2 and 3 showed higher viability in flap survival. The dilated choke vessels and fully developed vascular network were observed in the flap of the group 2, but not typically seen in the other groups. New vessels around the implanted pedicle were more developed in the group 2. Amount of the vessels in the mid-portion of the flap was significantly increased in the groups 2 and 4. In conclusion, the delay procedure enhanced the viability, and its effect was dependent on the new vessel formation around the implanted pedicle.

The Reliability of the Pediatric Functional Muscle Testing in Children with Developmental Delay

  • Seo, Hye-Jung;Kim, Joong-Hwi
    • The Journal of Korean Physical Therapy
    • /
    • v.27 no.4
    • /
    • pp.183-189
    • /
    • 2015
  • Purpose: The aim of this study was to examine the test-retest and inter-rater reliability of the pediatric functional muscle testing (PFMT) when applied to children with developmental delay. Methods: Sixteen children with developmental delay (seven females, nine males) participated in this study. For the inter-rater reliability, each was scored on the PMFT by two pediatric physical therapists with more than 8 years of clinical experience on the same day. For assessment of the test-retest reliability, one therapist tested the children again within 10 days. The second measurement was performed by taking a first measurement in video. Intraclass correlation coefficient (ICC) was calculated to determine the test-retest and inter-rater reliability of the PFMT, and Chronbach's alpha was used to measure internal consistency. Results: The results of this study were as follows: 1) The test-retest ICC of the score of the infant action month and the right side of the PFMT was from 0.53 to 1.00 and from 0.63 to 0.99, respectively. 2) The inter-rater ICC of the score of the infant action month and the right side of the PFMT was from 0.66 to 1.00 and from 0.64 to 1.00, respectively. 3) Chronbach's alpha was 0.93. The internal consistency indicated excellent. Conclusion: In conclusion, this study showed that the test-retest and inter-rater reliability of the PFMT was relatively high, except for a few items. Therefore, it can be suggested that the PFMT will be a useful tool for measurement of muscle strength for children with developmental delay if it be some modifications.

Delayed compaction effect on the strength and dynamic properties of clay treated with lime

  • Turkoz, Murat
    • Geomechanics and Engineering
    • /
    • v.18 no.5
    • /
    • pp.471-480
    • /
    • 2019
  • The constructions of engineering structures such as airports, highways and railway on clayey soils may create many problems. The economic losses and damages caused by these soils have led researchers to do many studies using different chemical additives for the stabilization of them. Lime is a popular additive used to stabilize the clayey soils. When the base course is stabilized by mixing with an additive, inevitable delays may occur during compaction due to reasons like insufficient workers, breakdown of compaction equipment, etc. The main purpose of this study is to research the effect of compaction delay time (7 days) on the strength, compaction, and dynamic properties of a clay soil stabilized with lime content of 0, 3, 6, 9, 12 and 15% by dry weight of soil. Compaction characteristics of these mixes were determined immediately after mixing, and after 7 days from the end of mixing process. Within this context, unconfined compressive strength (UCS) under the various curing periods (uncured, 7 and 28 days) and dynamic triaxial tests were performed on the compacted specimens. The results of UCS and dynamic triaxial tests showed that delayed compaction on the strength of the lime-stabilized clay soil were significantly effective. Especially with the lime content of 9%, the increase in the shear modulus (G) and UCS of 28 days curing were more prominent after 7 days mellowing period. Because of the complex forms of hysteresis loops caused by the lime additive, the damping ratio (D) values differed from the trends presented in the literature and showed a scattered relationship.

Study on the Optimum Time of Seed Production and Development of Embryo in Panax ginseng C.A.Meyer (인삼종자의 채종적기구명과 배발달에 관한 연구)

  • 안상득;권우생;정찬문;손은용
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.31 no.2
    • /
    • pp.123-128
    • /
    • 1986
  • The characteristics such as characters of seed, fruit and endosperm, development of embryo, dehisced and germination rate of seeds which harvested at 10 days intervals from 20 days to 60 days after pollination were determined to clarify the optimum time for seed production of ginseng. The sizes of length, width and thickness of fruits, seeds and endosperms investigated on 20 days after pollination were not largely different from those that harvested after 60 days. But the weights of fruits and seeds were increased along with the delay of harvesting time. The seeds which harvested from 30 to 60 days showed comparatively high dehisced and germinated rates, especially 40 days in dehisced rates and 50 days in germinated rates. The embryos were rapidly grown in early stage. Lengths of the embryo on 20 days after pollination were approximately grown to 30 ${\mu}{\textrm}{m}$. And after 30 days pollinated, embryos were not only more rapidly grown to 213 ${\mu}{\textrm}{m}$ but also cotyledon premodia were developed in this time and completely formed after 40 days.

  • PDF

Runoff Reduction Effect of Rainwater Retentive Green roof (저류형 옥상녹화의 우수유출저감에 대한 연구)

  • Baek, So-Young;Kim, Hyun-Woo;Kim, Mi-Kyeong;Han, Moo-Young
    • KIEAE Journal
    • /
    • v.16 no.1
    • /
    • pp.67-71
    • /
    • 2016
  • Purpose: There is a growing interest in rainwater runoff reduction effect of green roof, as flooding caused by increasing impervious surface is becoming more and more frequent in urban areas. This study was conducted to prove runoff reduction and runoff delay effect of the retentive green roof and to investigate its influencing factors to the rainfall events that occurred in the summer of 2013. Method: The experiment intended to monitor the runoff quantity of the retentive green roof($140m^2$) and normal roof($100m^2$) in #35 building in Seoul National University, Seoul, Korea for 75 days in 2013. Result: On analysis of 9 rainfall events, it showed that the retentive green roof has 24.8~100% of runoff reduction ratio, 21.2~100% of peak flow reduction ratio, 0.5~3.75 hours of peak delay, and $1.8{\sim}7.2m^3$ of retaining capacity in an area of $140m^2$. It shows different results depending on rainfall and antecedent dry days. The results show that runoff reduction effect is effective when the rainfall is less than 50 mm and antecedent dry day is longer than five days on average. By installing retentive green roofs on buildings, it can help mitigate urban floods and rehabilitate urban water cycle.

Educational Levels and Delays in Start of Treatment for Head and Neck Cancers in North-East India

  • Krishnatreya, Manigreeva;Kataki, Amal Chandra;Sharma, Jagannath Dev;Nandy, Pintu;Rahman, Tashnin;Kumar, Mahesh;Gogoi, Gayatri;Hoque, Nazmul
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.15 no.24
    • /
    • pp.10867-10869
    • /
    • 2015
  • Background: There are various patient and professional factors responsible for the delay in start of treatment (SOT) for head and neck cancers (HNC). Materials and Methods: This retrospective study was conducted on data for HNC patients registered at the hospital cancer registry in North-East India. All cases diagnosed during the period of January 2010 to December 2012 were considered for the present analysis. Educational levels of all patients were clustered into 3 groups; illiterates (unable to read or write), qualified (school or high school level education), and highly qualified (college and above). Results: In the present analysis 1066 (34.6%) patients were illiterates, 1,869 (60.6%) patients were literates and 145 (4.7%) of all patients with HNC were highly qualified. The stage at diagnosis were stage I, seen in 62 (34.6%), stage II in 393 (12.8%), stage III in 1,371 (44.5%) and stage IV in 1,254 (40.7%). The median time (MT) to the SOT from date of attending cancer hospital (DOACH) was, in illiterate group MT was 18 days, whereas in the qualified group of patients it was 15 days and in the highly qualified group was 10 days. Analysis of variance showed there was a significant difference on the mean time for the delay in SOT from DOACH for different educational levels (F=9.923, p=0.000). Conclusions: Educational level is a patient related factor in the delays for the SOT in HNCs in our population.

THE EFFCT OF TIME DELAY AFTER SILICOATING ON THE BOND STRENGTH BETWEEN THE METAL AND RESIN CEMENT (Silicoating후 시간지연이 금속과 레진 시멘트 간의 접착강도에 미치는 영향)

  • Yang, Jin-Kyoung;Bae, Jeong-Sik
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.33 no.1
    • /
    • pp.1-12
    • /
    • 1995
  • For the purpose of this study, the silicoating on Ni-Cr-Be alloy surface was carried out by using the Silicoater MD. The effect of time delay after silicoating on the bond strength between the metal and resin cement was examined. The groups were divided into 4 : group 1 : Sandblasted with $250{\mu}m$ aluminium oxide, immediatly cemented group 2 : Sandblasted with $250{\mu}m$ aluminium oxide, silicoated and immediatly cemented group 3 : Sandblasted with $250{\mu}m$ aluminium oxide, silicoated and cemented after 7 days group 4 : Sandblasted with $250{\mu}m$ aluminium oxide, silicoated and coated with unfilled resin and cemented after 7 days Specimens were luted with Comspan, Superbond C&B or Panavia EX. The tensile bond strength between the metal and resin cement was measured by using the universal testing machine. The results were as follows : 1. The bond strength in groups 2, 3 and 4 was higher than that of group 1 (p<0.05). There was no statistically significant difference among the bond strength in groups 2, 3 and 4 (p>0.05). 2. In Comspan-cemented groups, there was no significant difference among the bond strength in groups 2, 3 and 4 (p<0.05). 3. In Panavia EX-cemented groups, the bond strength of group 3 was higher than that of group 2 (p<0.05) and there was no significant difference between groups 3 and 4. 4. In Superbond C&B-cemented groups, there was significant difference between groups 2 and 3 (p<0.05) and the bond strength of group 4 was higher than that of group 3 (p<0.05). 5. The highest tensile bond strength was obtained by using the Superbond C&B and no difference in the Panavia EX and Comspan. 6. The modes of bond failure were mainly cohesive failure. The method of storage and transport indicated in this study seems recommendable for laboratory and clinical use at least up to 7 days.

  • PDF

Delay Reduction by Providing Location Based Services using Hybrid Cache in peer to peer Networks

  • Krishnan, C. Gopala;Rengarajan, A.;Manikandan, R.
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.6
    • /
    • pp.2078-2094
    • /
    • 2015
  • Now a days, Efficient processing of Broadcast Queries is of critical importance with the ever-increasing deployment and use of mobile technologies. BQs have certain unique characteristics that the traditional spatial query processing in centralized databases does not address. In novel query processing technique, by maintaining high scalability and accuracy, latency is reduced considerably in answering BQs. Novel approach is based on peer-to-peer sharing, which enables us to process queries without delay at a mobile host by using query results cached in its neighboring mobile peers. We design and evaluate cooperative caching techniques to efficiently support data access in ad hoc networks. We first propose two schemes: Cache Data, which caches the data, and Cache Path, which caches the data path. After analyzing the performance of those two schemes, we propose a hybrid approach (Hybrid Cache), which can further improve the performance by taking advantage of Cache Data and Cache Path while avoiding their weaknesses. Cache replacement policies are also studied to further improve the performance. Simulation results show that the proposed schemes can significantly reduce the query delay and message complexity when compared to other caching schemes.

The Delay in Confirming COVID-19 Cases Linked to a Religious Group in Korea

  • Kim, Hyung-Ju;Hwang, Hyun-Seong;Choi, Yong-Hyuk;Song, Hye-Yeon;Park, Ji-Seong;Yun, Chae-Young;Ryu, Sukhyun
    • Journal of Preventive Medicine and Public Health
    • /
    • v.53 no.3
    • /
    • pp.164-167
    • /
    • 2020
  • Objectives: As of March 3, 2020, the Shincheonji religious group accounted for the majority of Korean cases of coronavirus disease 2019 (COVID-19). Nonetheless, the most likely cause of the broad spread of COVID-19 among members of the Shincheonji religious group remains largely unknown. Methods: We obtained data of laboratory-confirmed cases related to the Shincheonji religious group from press releases by Korean public health authorities and news reports. We measured the period from the date of illness onset to the date of COVID-19 confirmation. Results: We analysed data from 59 cases (median age, 30 years). The estimated median period between the date of symptom onset and the date of COVID-19 confirmation was 4 days (95% confidence interval, 1-12). Conclusions: There was a delay in COVID-19 confirmation from the date of illness onset among the cases linked to the Shincheonji religious group. This delay likely contributed to the occurrence of many cases of COVID-19 in the group.