• Title/Summary/Keyword: Delay analysis

Search Result 2,874, Processing Time 0.033 seconds

Analysis of Load Transmission Characteristics for Automobile Helical Gear (자동차 헬리컬기어의 하중전달 특성해석)

  • Park, C.I.;Lee, J.M.
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.3 no.5
    • /
    • pp.1-9
    • /
    • 1995
  • The purpose of this study is to develop a computer simulation program for analyzing load transmission characteristics of a helical gear system in design stage. In this analysis, the rotational delay, load distribution, root stress, and contact area are investigated. That is, the influence function of deflection is obtained by finite element analysis and the influence function of approach and gear tooth error are considered. Load distribution, rotational delay, and contact area are calculated by solving load-deflection equation which includes these influence functions and tooth error, and the influence function of the bending moment is obtained by finite element analysis. The root stress is calculated by the load distribution and the influence function of the bending moment. The results of the simulation are cross-checked through a specially designed experimental set-up.

  • PDF

Delay Time Estimation of Recharge in the Hancheon Watershed, Jeju Island (제주도 한천유역의 함양 지체시간 산정)

  • Kim, Nam-Won;Na, Hanna;Chung, Il-Moon
    • Journal of Environmental Science International
    • /
    • v.23 no.4
    • /
    • pp.605-613
    • /
    • 2014
  • In this work, the delay time for groundwater recharge was estimated by comparing simulated recharges by means of SWAT(Soil and Water Assessment Tool) model and WTF(Water Table Fluctuation) method. The delay time for groundwater recharge means that the time when the water from rainfall travelled through vadose zone just after getting out of soil zone bottom. As measuring this delay time is almost impossible, we used to compare the estimated values from modeling(SWAT) and analytic method(WTF). The test site is Hancheon watershed which has 8 groundwater measurement stations. The results show that the altitude has a linear relationship with the estimated delay time values. To validate these results, we conducted corelation analysis between transformed groundwater levels and observed ones. The results showed that computed groundwater levels have good corelation($R^2$=0.97, 0.87, respectively). The estimated delay time would be used for the groundwater behaviour characteristics in vadose zone. As recharge rates vary according to the height, the delay time is thought to be an import variable for the proper groundwater recharge estimation.

The Comparison of the Ground Vibration Velocity by Dynamite and Finecker Blasting (다이너마이트와 미진동파쇄기 발파에 의한 지반진동속도 비교)

  • Kim, Il-Jung
    • Tunnel and Underground Space
    • /
    • v.6 no.1
    • /
    • pp.39-47
    • /
    • 1996
  • The results of the regression analysis and comparative study between 120 vibration events by dynamite blasting and 68 vibration events by finecker blasting which were monitored in the test blasting are as follows: The ground vibration velocity of dynamite blasting of 0.12 kg charge weight per delay at 7.4 m above the explosive is higher than that of finecker blasting of 0.96 kg charge weight per delay. In the case of 0.12 kg charge weight per delay, the ground vibration velocity of finecker blasting is equal to 5.5% of that of dynamite blasting at the 10 m distance from explosive. The decrement of ground vibration velocity of dynamite blasting of above 0.12 kg charge weight per delay is larger than that of finecker blasting of below 0.96 kg charge weight per delay. The rate of ground vibration velocity of the finecker blasting to that of dynamite blasting decreases with the distance from explosives, but increases with the decrease of charge weight per delay. The increment of ground vibration velocity of finecker blasting is less than that of dynamite blasting with the increase of charge weight per delay at the same distance from explosives. Under the condition of the constant critical ground vibration velocity or use the same charge weight per delay, the blasting working by finecker rather than by dynamite is able to be performed at the nearer place to structures.

  • PDF

Proposal of Vertical Direction Deck Delay Time for Efficient Formation of Free Surface of Bottom Deck (효율적 하부데크의 자유면 형성을 위한 수직방향 데크 단차 제안)

  • Seung-Won Jung;Seung-Joong Lee;Jin-Hyuk Song;Young-Ho Kim;Young-Suk Song;Nam-Sun Hwang
    • Explosives and Blasting
    • /
    • v.41 no.4
    • /
    • pp.41-50
    • /
    • 2023
  • This study, a vertical double-deck method using an electronic detonator was applied to increase excavation volume and reduce blast pollution. In the double deck method, there is a possibility that blasting efficiency may be reduced if bottom deck blasting is carried out without the free surface being completely formed after upper deck blasting. And for this reason, the blasting efficiency of the double deck method varies depending on the deck delay time. Therefore, in this study, we proposed four deck delay times applying 1 to 5 times the hole delay time. And blasting efficiency was evaluated according to fragmentation analysis. As a result of the fragmentation evaluation, the fragmentation of pattern 4 (deck delay time = hole delay time×5) was the best, but it was confirmed that fragmentation efficiency increased significantly from pattern 3 (deck delay time = hole delay time×3). Accordingly, it is analyzed that when blasting a vertical double deck, the deck delay time must be at least three times the hole delay time to obtain an efficient blasting effect.

Hierarchical Timing Analysis considering Global False Path

  • Sunik Heo;Kim, Juho
    • Proceedings of the IEEK Conference
    • /
    • 2002.07a
    • /
    • pp.235-237
    • /
    • 2002
  • As the integrated circuit technology gets developed, a circuit size of more than thousands of transistors becomes normal. A hierarchical design is unavoidable due to a huge circuit size. It is important how we can consider hierarchical structure in circuit delay analysis. In this paper we present an accurate method to analyze the delay of circuit with hierarchical structure. Adding the notion of global false path to the hierarchical timing analysis performs more accurate timing analysis.

  • PDF

Throughput and Delay of Single-Hop and Two-Hop Aeronautical Communication Networks

  • Wang, Yufeng;Erturk, Mustafa Cenk;Liu, Jinxing;Ra, In-ho;Sankar, Ravi;Morgera, Salvatore
    • Journal of Communications and Networks
    • /
    • v.17 no.1
    • /
    • pp.58-66
    • /
    • 2015
  • Aeronautical communication networks (ACN) is an emerging concept in which aeronautical stations (AS) are considered as a part of multi-tier network for the future wireless communication system. An AS could be a commercial plane, helicopter, or any other low orbit station, i.e., Unmanned air vehicle, high altitude platform. The goal of ACN is to provide high throughput and cost effective communication network for aeronautical applications (i.e., Air traffic control (ATC), air traffic management (ATM) communications, and commercial in-flight Internet activities), and terrestrial networks by using aeronautical platforms as a backbone. In this paper, we investigate the issues about connectivity, throughput, and delay in ACN. First, topology of ACN is presented as a simple mobile ad hoc network and connectivity analysis is provided. Then, by using information obtained from connectivity analysis, we investigate two communication models, i.e., single-hop and two-hop, in which each source AS is communicating with its destination AS with or without the help of intermediate relay AS, respectively. In our throughput analysis, we use the method of finding the maximum number of concurrent successful transmissions to derive ACN throughput upper bounds for the two communication models. We conclude that the two-hop model achieves greater throughput scaling than the single-hop model for ACN and multi-hop models cannot achieve better throughput scaling than two-hop model. Furthermore, since delay issue is more salient in two-hop communication, we characterize the delay performance and derive the closed-form average end-to-end delay for the two-hop model. Finally, computer simulations are performed and it is shown that ACN is robust in terms of throughput and delay performances.

Factors Affecting Discharge Delay in Lumbar Spinal Surgery Patients Who were Treated according to a Critical Pathway (표준진료지침을 적용한 요추 수술 환자의 퇴원 지연에 영향을 미치는 요인)

  • Kim, Jeoung Hee;Lee, Eun Ha;Kim, Su Ran;Kim, Sung Reul
    • Korean Journal of Adult Nursing
    • /
    • v.28 no.1
    • /
    • pp.43-52
    • /
    • 2016
  • Purpose: The aim of this study was to identify demographic, clinical, physical, and psychosocial factors affecting discharge delay in lumbar spinal surgery patients who were treated according to a critical pathway. Methods: A sample of 170 patients with lumbar spinal surgery agreed to participate in the study, between April 1, 2014 and August 30, 2015. Data were analyzed by mean, standard deviation, t-test, ${\chi}^2$-test, ANCOVA, and logistic regression analysis using SPSS 22.0 program. Results: Approximately fifty-nine percent of the participants was delayed discharge. On logistic regression analysis, female gender (OR=2.63, 95% CI=1.40~4.94), age (OR=1.03, 95% CI=1.01~1.05), spondylolisthesis (OR=4.49, 95% CI=1.90~10.61), and spinal fusion operation (OR=4.14, 95% CI=1.89~9.05) were significant factors predicting discharge delay of the participants. However, discharge delay was not related with pain, physical function, depression, or family support. Conclusion: An analysis of discharge delay may assist in evaluating and revising critical pathway for optimal care. In addition, nurses need to understand the factors affecting discharge delay of the given population who were treated according to a critical pathway.

Propensity score methods for estimating treatment delay effects (생존자료분석에서 성향 점수를 이용한 treatment delay effect 추정법에 대한 연구)

  • Jooyi Jung;Hyunjin Song;Seungbong Han
    • The Korean Journal of Applied Statistics
    • /
    • v.36 no.5
    • /
    • pp.415-445
    • /
    • 2023
  • Oftentimes, the time dependent treatment covariate and the time dependent confounders exist in observation studies. It is an important problem to correctly adjust for the time dependent confounders in the propensity score analysis. Recently, In the survival data, Hade et al. (2020) used a propensity score matching method to correctly estimate the treatment delay effect when the time dependent confounder affects time to the treatment time, where the treatment delay effects is defined to the delay in treatment reception. In this paper, we proposed the Cox model based marginal structural model (Cox-MSM) framework to estimate the treatment delay effect and conducted extensive simulation studies to compare our proposed Cox-MSM with the propensity score matching method proposed by Hade et al. (2020). Our simulation results showed that the Cox-MSM leads to more exact estimate for the treatment delay effect compared with two sequential matching schemes based on propensity scores. Example from study in treatment discontinuation in conjunction with simulated data illustrates the practical advantages of the proposed Cox-MSM.

Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

  • Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.9-24
    • /
    • 2015
  • Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.

Burn Delay Analysis of the Lunar Orbit Insertion for Korea Pathfinder Lunar Orbiter

  • Bae, Jonghee;Song, Young-Joo;Kim, Young-Rok;Kim, Bangyeop
    • Journal of Astronomy and Space Sciences
    • /
    • v.34 no.4
    • /
    • pp.281-288
    • /
    • 2017
  • The first Korea lunar orbiter, Korea Pathfinder Lunar Orbiter (KPLO), has been in development since 2016. After launch, the KPLO will execute several maneuvers to enter into the lunar mission orbit, and will then perform lunar science missions for one year. Among these maneuvers, the lunar orbit insertion (LOI) is the most critical maneuver because the KPLO will experience an extreme velocity change in the presence of the Moon's gravitational pull. However, the lunar orbiter may have a delayed LOI burn during operation due to hardware limitations and telemetry delays. This delayed burn could occur in different captured lunar orbits; in the worst case, the KPLO could fly away from the Moon. Therefore, in this study, the burn delay for the first LOI maneuver is analyzed to successfully enter the desired lunar orbit. Numerical simulations are performed to evaluate the difference between the desired and delayed lunar orbits due to a burn delay in the LOI maneuver. Based on this analysis, critical factors in the LOI maneuver, the periselene altitude and orbit period, are significantly changed and an additional delta-V in the second LOI maneuver is required as the delay burn interval increases to 10 min from the planned maneuver epoch.