A Study on the Traffic Flow Characteristic Analysis and Applicability of Work Zones (도로 공사중의 교통류 특성분석과 적용성에 관한 연구 -고속도로를 중심으로-)

  • Lim, Chae-Moon;Lee, Ju-Ho;Lee, Young-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.5 no.4
    • /
    • pp.329-337
    • /
    • 2002
  • It is the actual condition that the increasing traffic delay and accident caused by inefficient management on various construction by occupying the roadways. Since almost roadway improvements are for the public convenient, negative effects by them are ignored. But now due to the increase of traffics demand and limitation of road supply, the positive management scheme and treatment plan on the constructions must be considered. Thus, to the extent of this study divides uninterrupted flow into freeways and the Highway, yielding the time spread between under construction and not, that is delay time, we build capacity and delay model in the change of traffic volume and occupying length.

  • PDF

Modified Approaches to Delay Estimation for the Work Zones in the Proximity of the Signalized Intersections (공사구간이 있는 신호교차로의 지체산정을 위한 새로운 접근)

  • Shin, Chi-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.2
    • /
    • pp.269-281
    • /
    • 2018
  • Unlike its archetype predecessor such as the Highway Capacity Manual of the United States, the Korean Highway Capacity Manual of 2013 provides the analytical models for estimating the saturation flow rates for the lane-occupying work-zones in the proximity of the signalized intersections. Direct application of the revised saturation flow rates into the classic control delay models, however, appears to produce unreasonable delay amount as traffic demand approaches lane-group capacities and surpasses them, which is common phenomena in the work-zones. Complex interaction among vehicles, lane-dropping work-zone geometry and signal operations were never accounted in the traditional control delay models, and considerable differences between the delay model outcomes and field observations are repeatedly experienced. This paper proposes the modified approaches to the delay models in the manual, exerted on all three elements of control delay, and particularly focuses on the temporal and spatial boundary expansion in comparing the simulated results to the estimated ones. Extensive microscopic simulation work and calibration effort supports the modified approaches well enough to use them in the work-zone planning and evaluation.

A Study on QoS Measurement for Electronic Commerce Systems (전자상거래 시스템의 서비스 품질 측정에 관한 연구)

  • Kim Jeong-Su;Seo Sang-Koo
    • Journal of Information Technology Applications and Management
    • /
    • v.12 no.3
    • /
    • pp.129-150
    • /
    • 2005
  • Due to the advance of the Internet, the electronic commerce is getting more widely used, and customer's demand for the e-Commerce service quality is rapidly increasing. On the other hand, e-Commerce companies required the Internet services whose quality is provided more reliable service to their customers. Therefore, it is very important to provide both e-Commerce companies and customers with the measurement and service quality in real-life network environment. But the research on the service quality measurement method for electronic commerce systems has been limited because ISP and e-Commerce providers seldom disclose detailed service measures such as, where and how much service delay incurred. In this paper, we construct sample e-Commerce systems and try to measure the service quality of the systems in real network environment. We have analyzed the delay zones and causes using a measurement tool. We must reflect the improvement method against delay causes. Accordingly, the customers can be experiences the better service quality. We hope that this research will be the groundwork for future research on the service quality of various types of e-Commerce systems and online services.

  • PDF

Bubble-type Motion Detector Using a Pulsed-mode Oscillator and Delay Line (펄스 모드 발진기와 지연선로를 이용한 버블형 동작감지기)

  • Lee, Ik-Hwan;Kim, Dong-Wook
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.26 no.3
    • /
    • pp.342-348
    • /
    • 2015
  • This paper presents a new motion detector that has a bubble-layer detection zone using a pulsed-mode oscillator and delay line. The proposed motion detector controls the bubble-layer detection zone with pulse width of transmitted signals and creates IF signals only by reflected signals from the target within the detection zone whose position is determined by time delay of the delay line. The fabricated motion detector uses the pulsed-mode voltage controlled oscillator as a signal source which has a center frequency of 8 GHz, pulse width of 2 nsec and pulse period of 30 nsec. It successfully makes the bubble-layer detection zones at 1 m, 3 m and 5 m distant from itself using two delay lines with 7 nsec and 12 nsec delay, and is also demonstrated to detect the target within the detection zones.

A Mathematical Model for Determination of PCE's Based on Delay for Two-Lane Two-Way Highway (양방향 2차로 도로의 지체시간 산정을 이용한 승용차환산계수 결정이론)

  • 이승준;최재성
    • Journal of Korean Society of Transportation
    • /
    • v.17 no.2
    • /
    • pp.149-162
    • /
    • 1999
  • One of the most important steps of the design, capacity and operation analysis stapes in the two-lane two way highways is the effect of heavy vehicle to traffic flow quality. This heavy vehicle's effect on traffic flow can be represented as PCE, which is the number of passenger cars that are displaced by a single heavy vehicle of a particular type under prevailing roadway, traffic, and control conditions. In this paper, we focus on the heavy vehicles effect on volume, speed, delay, and the maneuver of freedom which are major MOE's in traffic operation analysis and PCE criterion which should be measurable, determinable and able to reflect the traffic flow characteristics. Therefore, the objective of the paper is to determine the PCE criterion and to develop a new PCE determination method. In this study, delay is adopted as PCE criterion and, for calculation of delay, the highway is divided into the passing zone and the no-passing zone. PCE is determined by comparing the delay due to total traffic flow interaction with the delay due to a single heavy vehicle, Also, this paper proposes a new method to determine the average PCE on the highway that has the passing zones and no-passing zones.

  • PDF

Performance on the Beam-Switched Demand Assigned Multiple Access for the Packet Satellite Communication (패킷 위성통신의 빔스위칭 요구할당 다중 접속 방식에 대한 성능 연구)

  • 김덕년;김재명
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.26 no.10
    • /
    • pp.1462-1470
    • /
    • 1989
  • This paper aims at investigating the Demand Assigned Multiple Access(DAMA) system for the packet-switched Satellite Communication. An onboard processor of the multisport beam satellite incorporates the ground controller to macimize the packet transmissions for each slot. 'Request Following' trnasmission mode is introduced as a transmission strategy of ground station under the control of its zone controller. The combined scheme of reservation channel access and contention channel access was proposed by Lee & Mark[3] for improving the Delay-Throughput performance. Our scheme provides less communication delay of approximately max. 200msec for achieving the corresponding throughput than the Lee & Mark's work does. Delay versus Throughput curves as well as Delay versus Traffic parameter curves are obtained. Numerical results obtained through the analysis and by the computer simulation show that the proposed scheme provides the low average packer delay even under the condition that the number of transponders (M)is below the half of the number of zones(N).

  • PDF

A Study on the Traffic Effect Zone and Application of Road Occupying Construction (도로 공사중의 교통영향권역 설정 및 적용성에 관한 연구)

  • Lee, Ju-Ho;Lee, Young-Woo;Lim, Chae-Moon
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.6 no.2
    • /
    • pp.131-139
    • /
    • 2003
  • The links operating interrupted flow are intend to yield the traffic between the out flow and inflow part effect zone of street section, we build the delay model using the time gap between under construction and not. We review the applicability of interrupted flow, and thus we can put this data to practical use as the basis data to compute the inducement charge for traffic delay. Also building about traffic effect zone of interrupted flow wouldn't produce at the section beside occupying roads and construction cross section, thus we must review the plan to minimize traffic delay by the construction occupying road. In future there must be advanced the incomplete in this study, and groping for the various alternatives to minimize the traffic delay by the road occupying construction, with developing the various sets of detailed analyzing models, that is analysis on the street strength, crossroads geometrical forms of crossroads, public traffics, pedestrians, occupying types.

  • PDF

Delay Spread Measurement and Analysis in 3 GHz and 6 GHz Indoor Environments (3 GHz, 6 GHz 실내 환경의 지연 확산 측정 및 분석)

  • Lee, Seong-Hun;Lee, Hwa-Choon;Cho, Byung-Lok
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.15 no.1
    • /
    • pp.15-20
    • /
    • 2020
  • In this paper, delay diffusion for exhibition hall and conference room was measured and analyzed in the indoor environment of the building. Scenarios for the indoor environment of the two buildings were written. also, the system configuration and measurement methods were conducted under the same conditions. The measurement conditions were set to 3 GHz and 6 GHz of center frequencies and analysis band selected 2 GHz. The measurement system consisted of vector network analyzer, power amplifier, omni-directional transmit and receive antenna, and transmission line. According to the indoor environment scenario of the two buildings, the location of the receiving antenna was divided into three zones based on the location of the transmitting antenna and this was measured at 1 m intervals according to 18 locations. The power delay profiles, RMS delay spread, and K-factor results of two buildings were compared and analyzed.

Fatigue Crack Growth Retardation after Single Overload Cycle in High Strengh Aluminium Weldments (고강도 알루미늄 합금 용접부에 있어서의 피로균열전파에 미치는 과하중 효과)

  • 이택순;김상태;김인식
    • Journal of Welding and Joining
    • /
    • v.6 no.1
    • /
    • pp.46-52
    • /
    • 1988
  • Retardation or delay in fatigue crack growth due to overloads are important for the accurate prediction of fatigue lives of structural materials. In this study, retardation of fatigue crack growth in Al 6061-T6 weldments and heat affected zones (HAZ) after single overload cycle had been investigated. Retardation in both weldments and HAZ was observed. It was concluded that retardation in both weldment and HAZ was greater than in base metal due to microstructural change and crack branching and crack closure were major governing factor in retardation.

  • PDF

An analysis according to the caange in power SCADA systems from the viewpoint of the operator (운영자입장에서 본 전력 SCADA시스템 변화에 따른 분석)

  • Oh, Sung-Hyo;Choi, Sang-Chun;Choi, Si-Haeng
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.407-416
    • /
    • 2008
  • The OCC of Seoul Metro whose operation began in 1974 is in charge of conveying 4,000,000 passengers across 117 subway stations in travel zones of 134.9Km in length. It continues to strive to ensure passenger safety by applying state-of-the-art-technology to each control system without delay. The power control center especially designed to provide power system operations for all stations of Seoul Metro(Line 1 to 4) and the rolling stocks implements preventive safety systems with the real time power system operational information on changes in conditions from the field through the power SCADA system(41 substations, 117 stations, 137 terminal units). This paper reports the differences of each line's power SCADA system(power SCADA systems of Seoul Metro(Line 1 to 4)), the roles and functions of the system, and the system operating characteristics and limits from the standpoint of the operator.

  • PDF