After World Trade Center's Terror in 2001 and promulgating Maritime Transportation Security Act (MTSA, 2002) and Security and Accountability For Every Port Act (SAFE Port Act, 2006) in the United States, most of the attention on security of international transportation including marine carrier and facility has focused increasingly. Inspection stations in foreign seaport terminal including Busan, South Korea, have been installed by Container Security Initiative (CSI) and Customs Trade Partnership against Terrorism (C-TPAT). The inspection station, however, may directly and indirectly affect delay of truck turnaround time in the seaport, especially high and severe level of security. This paper was analysed a risk for the additional average delay of truck turnaround time incurring by the inspection station under the all level of security, C-TPAT and CSI. As a result of this risk analysis, the higher weighted inspection time based on raising security level, the less number of trucks to be inspected, which will derive high delay in the inspection station.
Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
KSCE Journal of Civil and Environmental Engineering Research
/
v.43
no.1
/
pp.109-117
/
2023
Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.
Journal of Korean Tunnelling and Underground Space Association
/
v.20
no.5
/
pp.809-822
/
2018
A quantitative risk assessment has been introduced to quantitatively evaluate fire risk as a means of performance based fire protection design in the design of railway tunnel disaster prevention facilities. However, there are insufficient studies to examine the effect of various risk factors on the risk. Therefore, in this study, the risk assessment was conducted on the model tunnel in order to examine the effects of the evacuation start time delay and the fire growth curve on the quantitative risk assessment. As a result of the analysis of the scenario, the fatalities occurred mainly when escapes in the same direction as the direction of the fire smoke movement. In addition, after the FED exceeded 0.3, the maximum fatalities occurred within 10 minutes. In the range of relatively low risk, distance between cross passages, evacuation delay time and fire growth curve were found to affect the risk, but they were found to have little effect on the condition that the risk reached the limit. Especially, in this study, it was evaluated that the evacuation delay time reduction, fire intensity and duration reduction effect were not observed when the distance between cross passages was more than 1500 m.
Journal of the Korean Society of Clothing and Textiles
/
v.32
no.5
/
pp.766-776
/
2008
The purpose of this study was 1) to identify the reasons for delay of decision making and the shopping information in internet shopping, 2) to classify consumers based on the clothing benefits, 3) and to examine the differences among consumer groups in the reasons for delay of decision making and the shopping information. The data were collected from a sample of 500 internet shopper aged from 20 to 40. This study used factor analysis, multiple regression analysis, Pearson's correlation analysis, cluster analysis and ANOVA. The results showed that the reasons for delay of decision making consisted of eight factors: Performance risk, Comparison shopping, Economic shopping, Social risk, Uncertainty, Expecting of market change, Product unsatisfaction, Passive shopping. The shopping information consisted of three factors: Product variety, Product information, Additional information. Five factors of clothing benefits were Economy, Figure compensation, Social position, Individuality, and Comfort. The respondents were classified into four groups by five factors of clothing benefits; Individuality seeking group, Low-benefits seeking group, Economy seeking group, Figure compensation/comfort seeking group. There were significant differences among groups in the reasons for delay of decision making and the shopping information among groups. Therefore, marketers need to provide different shopping information for delay closure by target groups.
Motor delay, when present, is usually the first concern brought by the parents of children with developmental delay. Cerebral palsy that is the most common motor delay, is a nonspecific, descriptive term pertaining to disordered motor function that is evident in early infancy and is characterized by changes in muscle tone, muscle weakness, involuntary movements, ataxia, or a combination of these abnormalities. A wide range of causative disorders and risk factors have been identified for cerebral palsy, and broadly classified into 5 groups; perinatal brain injury, brain injury related to prematurity, developmental abnormalities, prenatal risk factors, and postnatal brain injury. Delay in attaining developmental milestones is the most distinctive presenting complaint in children with cerebral palsy. A detailed history and thorough physical and neurologic examinations are crucial in the diagnostic process. The clinician should be cautious about diagnostic pronouncement unless the findings are unequivocal. Several serial examinations and history review are necessary. All children with cerebral palsy should undergo a neuroimaging study, preferably MRI, because an abnormality is documented on head MRI(89%) and CT(77%). The high incidence rates for mental retardation, epilepsy, ophthalmologic defects, speech and language disorders and hearing impairment make it imperative that all children with cerebral palsy be screened for mental retardation, ophthalmologic and hearing impairments, and speech and language disorders; nutrition, growth, and swallowing also should be closely monitored.
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.19
no.4
/
pp.30-44
/
2020
The application of PPLT is difficult to analyze and judge only from the effects of the delay time. In this study, the application of PPLT was proposed using not only the delay time of PLT and PPLT due to the change in traffic volume and the number of opposite straight lanes but also the traffic volume of passing a left turn and the number of conflict risks as indicators. According to the analysis, the more left-turn traffic than capacity and the less opposite-straight volume, the greater the PPLT effect. On the other hand, if the left-turn traffic is below capacity, the delay time will be reduced partially, but the overall passing left turn volume will not increase, and the conflict risk will increase. In addition, the conflict risk increases in the third lane or higher. Moreover, the difference of passing left-turn volume between PLT and PPLT showed a pattern similar to the delay time difference, and the PPLT coverage was wider than the difference in delay time and was associated more with the conflict risk numbers. Therefore, it would be reasonable to use passing left-turn traffic primarily, consider the delay time below the left-turn capacity, and consider the conflicting risk numbers simultaneously at or above the opposite straight three lanes.
Journal of the Korea Institute of Building Construction
/
v.18
no.4
/
pp.385-394
/
2018
There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.268-270
/
2006
The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.
Hong, Minha;Lee, Kyung-Sook;Park, Jin-Ah;Kang, Ji-Yeon;Shin, Yong Woo;Cho, Young Il;Moon, Duk-Soo;Cho, Seongwoo;Hwangbo, Ram;Lee, Seung Yup;Bahn, Geon Ho
Journal of the Korean Academy of Child and Adolescent Psychiatry
/
v.33
no.1
/
pp.16-23
/
2022
Objectives: Early detection of developmental issues in infants and necessary intervention are important. To identify the comorbid conditions, a comprehensive evaluation is required. The study's objectives were to 1) generate scale items by identifying and eliciting concepts relevant to young children (12-71 months) with developmental delays, 2) develop a comprehensive screening tool for developmental delay and comorbid conditions, and 3) assess the tool's validity and cut-off. Methods: Multidisciplinary experts devised the "Infant Comprehensive Evaluation for Neurodevelopmental Delay (ICEND)," an assessment method that comes in two versions depending on the age of the child: 12-36 months and 37-71 months, through monthly seminars and focused group interviews. The ICEND is composed of three parts: risk factors, resilience factors, and clinical scales. In parts 1 and 2, there were 41 caretakers responded to the questionnaires. Part 3 involved clinicians evaluating ten subscales using 98 and 114 questionnaires for younger and older versions, respectively. The Child Behavior Checklist, Strengths and Difficulties Questionnaire, Infant-Toddler Social Emotional Assessment, and Korean Developmental Screening Test for Infants and Children were employed to analyze concurrent validity with the ICEND. The analyses were performed on both typical and high-risk infants to identify concurrent validity, reliability, and cut-off scores. Results: A total of 296 people participated in the study, with 57 of them being high-risk (19.2%). The Cronbach's alpha was positive (0.533-0.928). In the majority of domains, the ICEND demonstrated a fair discriminatory ability, with a sensitivity of 0.5-0.7 and specificity 0.7-0.9. Conclusion: The ICEND is reliable and valid, indicating its potential as an auxiliary tool for assessing neurodevelopmental delay and comorbid conditions in children aged 12-36 months and 37-71 months.
Korean Journal of Construction Engineering and Management
/
v.18
no.6
/
pp.65-77
/
2017
Recently, many Korean major construction companies are suffering from profit loss mainly due to a direct impact from delays in their overseas projects. In general, changes are inevitable in a large-scale project, and most of changes are directly linked to construction delay. Therefore, in the event that an extension of time is necessary due to a change, the contractor must manage the delay based on the condition of the contract to effectively manage risks from delay to the completion date. Thus it is important to understand delay protocol defined in the condition of the contract early in the project, but there have been few or no study to propose methodology or tool to support this effort. This paper presents a review on the project planning and controling practices of major Korean construction companies along with the issues on delay claims and disputes in mega-international projects and suggests a tool to assess delay risk in the condition of the contract. To propose a delay risk assessment model for international construction projects, major standard conditions of contract have been reviewed including FIDIC Red Book(1999), PSSCOC(2014) and SIA 9th Edition(2010). To reflect recent trend of major international owners, standard conditions which they are utilizing for their projects also have been reviewed including those of ARAMCO and QP. The model provides a categories of risks to be reviewed on the condition of the contract along with standard level of the risk which is common in the international standard form of the contracts. This study also performed a case study on an actual international project to confirm the effectiveness of proposed model to identify and respond to a delay risk of a project.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.