• Title/Summary/Keyword: Delay Constrained Unicast Routing (DCUR) Algorithm

Search Result 4, Processing Time 0.023 seconds

An Improved Distributed Algorithm for Delay-Constrained Unicast Routing (개선된 분산 Delay-Constrained Unicast Routing 알고리듬)

  • Zhou, Xiao-Zheng;Suh, Hee-Jong
    • Proceedings of the IEEK Conference
    • /
    • 2005.11a
    • /
    • pp.109-112
    • /
    • 2005
  • In this paper, we propose an improved delay-constrained unicast routing (I-DCUR) algorithm for real-time networks which is based on the delay-constrained unicast routing (DCUR) algorithm. Our I-DCUR algorithm is quite different from DCUR algorithm, because the node will choose the link between the active node and the previous node, and it will replace the original loop path when it detects a loop. Thus, firstly consider to choose the link between the active node and the previous node to replace the original loop path when a node detects a loop. So our algorithm can make the construction of path more efficiently, as compared to DCUR algorithm. We could see that the performance of I-DCUR algorithm is much better than DCUR algorithm in the experimental results. There were over 40% improvement in 100 nodes, 60% in 200 nodes, and 9% reduction of costs.

  • PDF

An Improved Algorithm of Distributed QoS in Real-time Networks (실시간 네트워크에서 개선된 분산 QoS 알고리듬)

  • Suh, Hee-Jong
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.7 no.1
    • /
    • pp.53-60
    • /
    • 2012
  • In this paper, an improved algorithm of distributed QoS is proposed for real-time networks. This algorithm like a delay-constrained unicast routing(DCUR) algorithm uses either least-cost(LC) path or least-delay(LD) path of an active node, but when there is a loop, this algorithm is quite different from DCUR in choosing the link between the active node and the previous node to replace the original loop path. And this algorithm makes the construction of the paths more efficiently.

On Unicast Routing Algorithm Based on Estimated Path for Delay Constrained Least Cost (경로 추정 기반의 지연시간을 고려한 저비용 유니캐스트 라우팅 알고리즘)

  • Kim, Moon-Seong;Bang, Young-Cheol;Choo, Hyun-Seung
    • Journal of Internet Computing and Services
    • /
    • v.8 no.1
    • /
    • pp.25-31
    • /
    • 2007
  • The development of efficient Quality of Service (QoS) routing algorithms in high speed networks is very difficult since divergent services require various quality conditions, If the QoS parameter we concern is to measure the delay on that link, then the routing algorithm obtains the Least Delay (LD) path, Meanwhile, if the parameter is to measure of the link cast, then it calculates the Least Cost (LC) path. The Delay Constrained Least Cast (DCLC) path problem of the mixed issues on LD and LC has been shown to be NP-hard. The path cost of LD path is relatively mere expensive than that of LC path, and the path delay of LC path is relatively higher than that of LD path in DCLC problem. In this paper. we propose the algorithm based on estimated path for the DCLC problem and investigate its performance, It employs a new parameter which is probabilistic combination of cost and delay, We have performed empirical evaluation that compares our proposed algorithm with the DCUR in various network situations.

  • PDF

Low Cost and Acceptable Delay Unicast Routing Algorithm Based on Interval Estimation (구간 추정 기반의 지연시간을 고려한 저비용 유니캐스트 라우팅 방식)

  • Kim, Moon-Seong;Bang, Young-Cheol;Choo, Hyun-Seung
    • The KIPS Transactions:PartC
    • /
    • v.11C no.2
    • /
    • pp.263-268
    • /
    • 2004
  • The end-to-end characteristic Is an important factor for QoS support. Since network users and required bandwidths for applications increase, the efficient usage of networks has been intensively investigated for the better utilization of network resources. The distributed adaptive routing is the typical routing algorithm that is used in the current Internet. The DCLC(Delay Constrained 1.east Cost) path problem has been shown to be NP-hard problem. The path cost of LD path is relatively more expensive than that of LC path, and the path delay of LC path is relatively higher than that of LD path in DCLC problem. In this paper, we investigate the performance of heuristic algorithm for the DCLC problem with new factor which is probabilistic combination of cost and delay. Recently Dr. Salama proposed a polynomial time algorithm called DCUR. The algorithm always computes a path, where the cost of the path is always within 10% from the optimal CBF. Our evaluation showed that heuristic we propose is more than 38% better than DCUR with cost when number of nodes is more than 200. The new factor takes in account both cost and delay at the same time.