• 제목/요약/키워드: Delay Change

검색결과 682건 처리시간 0.021초

이중 Moving Window 버퍼 기반 전달정렬 측정치 시간지연 보상기법 (Compensation Technique of Measurement Time Delay in Transfer Alignment Using the Double Moving Window Buffer)

  • 김천중;유준
    • 한국군사과학기술학회지
    • /
    • 제14권4호
    • /
    • pp.684-693
    • /
    • 2011
  • Measurement time delay in the transfer alignment is very important. It has been well known that the time delay degrades the alignment performance and makes some navigation errors on the transfer alignment of slave INS(SINS). Therefore there are many schemes to eliminate that time delay but the compensation technique through the estimation by Kalman filter through modeling the time delay as a random constant is generally used. In the case of change over measurement time delay or the large measurement time delay, estimation performance in the existing compensation technique is degraded because model of time delay is not correct any more. In this paper, we propose the method to keep the time delay almost constant even though in the abnormal communication state and very small through feedback compensation using double buffer. Double buffer consists of two moving window to temporarily store measurements from master INS and slave INS in real time.

분사율을 이용한 직접 분사식 다공 가솔린 인젝터의 분사특성 연구 (Study on the Injection Characteristics using Injection Rate in a Direct-injection Gasoline Injector with Multi-hole)

  • 박정현;신달호;박수한
    • 한국분무공학회지
    • /
    • 제21권1호
    • /
    • pp.20-28
    • /
    • 2016
  • This paper presents an experimental study on the GDI injector with Bosch method. The injection characteristics, such as the injection quantity, the injection rate, the maximum velocity of the nozzle exit and the injection delay were studied through the change of the injection pressure, the tube pressure and energizing duration in injection rate measurement device using nheptane. The injection quantity is increased by increasing injection pressure, decreasing tube pressure or increasing energizing duration. As the difference of the injection quantity changed, the shape of injection rate was moved with a constant form. The maximum velocity of the nozzle exit showed a tendency to increase as the injection pressure is increased. However, tube pressure did not affect. Overall, it was confirmed that the closing delay is longer than the opening delay in all conditions. As the injection pressure increased, the result has a tendency to decrease the closing delay, it did not affect the opening delay. Reduction of the closing delay showed the reduction of the injection duration. the tube pressure and energizing duration did not affect the injection delay (opening delay, closing delay).

Quality Adaptation of Intra-only Coded Video Transmission over Wireless Networks

  • Shu Tang;Yuanhong Deng;Peng Yang
    • Journal of Information Processing Systems
    • /
    • 제19권6호
    • /
    • pp.817-829
    • /
    • 2023
  • Variable wireless channel is a big challenge for real-time video applications, and the rate adaptation of realtime video streaming becomes a hot topic. Intra-video coding is important for high-quality video communication and industrial video applications. In this paper, we proposed a novel adaptive scheme for real-time video transmission with intra-only coding over a wireless network. The key idea of this scheme is to estimate the instantaneous remaining capacity of the network to adjust the quality of the next several video frames, which not only can keep low queuing delay and ensure video quality, but also can respond to bandwidth changes quickly. We compare our scheme with three different schemes in the video transmission system. The experimental results show that our scheme has higher bandwidth utilization and faster bandwidth change response, while maintaining low queuing delay.

Detection algorithm of ionospheric delay anomaly based on multi-reference stations for ionospheric scintillation

  • Yoo, Yun-Ja;Cho, Deuk-Jae;Park, Sang-Hyun;Shin, Mi-Young
    • 한국항해항만학회지
    • /
    • 제35권9호
    • /
    • pp.701-706
    • /
    • 2011
  • Radio waves including GPS signals, various TV communications, and radio broadcasting can be disturbed by a strong solar storm, which may occur due to solar flares and produce an ionospheric delay anomaly in the ionosphere according to the change of total electron content. Electron density irregularities can cause deep signal fading, frequently known as ionospheric scintillation, which can result in the positioning error using GPS signal. This paper proposes a detection algorithm for the ionosphere delay anomaly during a solar storm by using multi-reference stations. Different TEC grid which has irregular electron density was applied above one reference station. Then the ionospheric delay in zenith direction applied different TEC will show comparatively large ionospheric zenith delay due to the electron irregularity. The ionospheric slant delay applied an elevation angle at reference station was analyzed to detect the ionospheric delay anomaly that can result in positioning error. A simulation test was implemented and a proposed detection algorithm using data logged by four reference stations was applied to detect the ionospheric delay anomaly compared to a criterion.

Foundation Fieldbus에서 토큰-패싱 전송 방식의 실험적 성능 평가 (Experimental Performance Evaluation of Token-Passing Mechanism in Foundation Fieldbus)

  • 배진운;홍승호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년 학술대회 논문집 정보 및 제어부문
    • /
    • pp.111-113
    • /
    • 2006
  • FOUNDATION fieldbus provides scheduling and token-passing services for cyclic and sporadic data respectively. In this paper, we evaluate the delay performance of token-passing mechanism in FOUNDATION fieldbus network system using an experimental model. This paper introduces a method of developing an experimental model which consists of 10 nodes of FOUNDATION fieldbus communication device. Using the experimental model, we evaluate the delay performance of time-critical and time-available data with respect to change of TTRT parameter.

  • PDF

Pecipitable Water Vapor Change Obtained From GPS Data

  • Kingpaiboon, Sununtha;Satomura, Mikio;Horikawa, Mayumi;Nakaegawa, Tosiyuki;Shimada, Seiichi
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2003년도 Proceedings of ACRS 2003 ISRS
    • /
    • pp.384-386
    • /
    • 2003
  • GPS observation has been performed at Khon Kaen in northeast Thailand to investigate the Precipitable Water Vapor (PWV) change since August 2001 by using a Trimble 4000SSi receiver. The data obtained in the period from March to June in 2002 were processed by using CAMIT software to obtain the Zenith Tropospheric Delay (ZTD) at every one hour referring to some IGS stations around Thailand. We estimated the Zenith Hydrostatic Delay (ZHD) at every three hours with barometer data at Khon Kaen of Thai Meteorological Department, The Zenith Wet Delay (ZWD) was obtained by subtracting ZHD from ZTD and PWV can be calculated from ZTD. The results obtained shows that PWV changes with a large amplitude in March and April before the monsoon onset, and also we can see steep PWV increases before rain and decreases after rain. In May and June after the onset, the PWV is almost constant to be 60 to 70 mm, but there is a semi-diurnal change which has high PWV values at about 8 and 20 o'clock in local time.

  • PDF

Effect of land use and urbanization on groundwater recharge in metropolitan area: time series analysis of groundwater level data

  • Chae, Gi-Tak;Yun, Seong-Taek;Kim, Dong-Seung;Choi, Hyeon-Su
    • 한국지하수토양환경학회:학술대회논문집
    • /
    • 한국지하수토양환경학회 2004년도 임시총회 및 추계학술발표회
    • /
    • pp.113-114
    • /
    • 2004
  • In order to classify the groundwater recharge characteristics in an urban area, a time series analysis of groundwater level data was performed. For this study, the daily groundwater level data from 35 monitoring wells were collected for 3 years (Fig. 1). The use of the cross-correlation function (CCF), one of the time series analysis, showed both the close relationship between rainfall and groundwater level change and the lag time (delay time) of groundwater level fluctuation after a rainfall event. Based on the result of CCF, monitored wells were classified into two major groups. Group I wells (n=10) showed a fast response of groundwater level change to rainfall event, with a delay time of maximum correlation between rainfall and groundwater level near 1 to 7 days. On the other hand, the delay time of 17-68 days was observed from Group II wells (n=25) (Fig. 1). The fast response in Group I wells is possibly caused by the change of hydraulic pressure of bedrock aquifer due to the rainfall recharge, rather than the direct response to rainfall recharge.

  • PDF

한·중 항로 복선화 전후 혼잡도 변화 연구 (A Study on Congestion Change of Dual Airways between Korea-China)

  • 조진호;백호종;장조원
    • 한국항공운항학회지
    • /
    • 제28권1호
    • /
    • pp.7-13
    • /
    • 2020
  • A significant growth in local air traffic volume is leading to airway congestion and flight delays especially for Incheon-China and Incheon-Europe sectors. A key method to increase the airway capacity is to place a supplemental airway parallel to the existing one and in cooperation between the aviation authorities between China and Korea, a dual airway track was implemented on December 6, 2018. Here, we use airline A's flight data to analyze the congestion change effect of the new airway. Results show total delay time to Europe is reduced 51% (13.4 to 6.6 minutes) as the delay distribution for 16-30 minutes, 31 minutes and greater decreased from 23.2% to 8.2% and 8.7% to 1.0% respectively. The delay to China also decreased but the drop is not as significant as flights to Europe. This is caused by the difference in flight distance, traffic volume, and characteristics of flights landing and transiting China. Flights to Europe show a broad distribution in altitude allocation and reduction in aircraft separation demonstrating the effectiveness of a dual airway track.

Construction Delays in Developing Countries: A Review

  • Islam, Muhammad Saiful;Trigunarsyah, Bambang
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권1호
    • /
    • pp.1-12
    • /
    • 2017
  • Construction delay is one of the basic constrains to achieve the project objectives in developing countries. This study aims to find the causes and effects of construction delays in developing countries. A thorough literature review has been done following the content analysis method. The relevant literature of 28 developing countries was collected from the scholarly journals published in the period of 2006 to 2016. The different developing countries are grouped into three geographic regions, i.e. South and Southeast Asia, Middle East, and Africa. In these regions, total 53 potential causes of delay under 8 major groups are identified. Frequency and ranking of these factors have been done. The factors, delay in progress payment by owner, contractors' cash flow problem, improper planning and scheduling, poor site management, and change order by owner during construction, are acknowledged as critical causes of delay in developing countries. This study will assist both academic and professional experts providing more insight about the construction delays and project management in developing countries.