• Title/Summary/Keyword: Deign Management

Search Result 8, Processing Time 0.019 seconds

Application of Partnering and Constructability in the Design Development Phase of Public Design-Build Projects (공공부문 일괄사업 실시설계단계의 파트너링과 시공성 분석 적용방안)

  • Nam, Yong-Ho;Yeon, Hee-Jung;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.531-534
    • /
    • 2007
  • In the current domestic design-build contract, design and construction are separated due to prohibition of outside work. but instead the design-build contract adopts a method of fulfilling each assignment as a joint venture, which makes it difficult for participants to communicate each other and often require changes of design. also, It is difficult to performance efficiency project that they don't want to share useful information related to design and construction. In this study suggests how to maxmize the effiency of the project by proposing a process model connected with an efficient partnering and constructability in a deign development phase of design-build constract.

  • PDF

A study on the Practical Adaptation of BIM Programs for Architectural Education (건축교육에서 BIM 프로그램 적용에 관한 연구)

  • Shin, Dong-Chul
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.11 no.4
    • /
    • pp.57-66
    • /
    • 2011
  • The advent of BIM(Building Information Modeling) design process based on the digital media has brought innovation to the production and management of AEC industry. Accordingly the need for educating BIM professionals has been radically increased both in the real world practice and in academia. Some developed countries have already been studying and establishing the optimized curriculum in the academic architecture courses for BIM based education with multi_efforts using the digital media as design processing tools focused on educating architectural professionals with creativity and productivity. However in the domestic education systems, it is hardly found that researches and curriculums deal with the BIM education in the academia. Thus the objective of this paper is to investigate the architectural design pedagogy in the advanced digital media setting in response to the urgent need for BIM education. This study focuses on developing the curriculum based on practical adaptation of BIM programs for architectural education. It aims to provide students with the basic understanding of BIM theory and the practice of BIM tools as an instrument enhancing the creativity for architectural design. Thus this study proposes an BIM curriculum for the students who first encounter the notion and knowledge of BIM during their academic years. And the education result after the application of this curriculum has been analysed through the students questionnaires before and after the lecture.

Operation and Analysis of Network for Multivendor PLC Group Management in the Wall Paper Process (발포 벽지 공정에서 이기종 PLC 그룹 관리를 위한 네트워크 운영과 해석)

  • Gang, Seong-Deok;Lee, Dong-Chun;Kim, Jeong-Ho;Lee, Sang-Beom
    • The Transactions of the Korea Information Processing Society
    • /
    • v.3 no.2
    • /
    • pp.283-294
    • /
    • 1996
  • To operate the automatic devices of manufacturing process more effectively and to solve the needs of the resource sharing, network technology is applied to the unit control devices located in common manufacturing zone and operated by connecting them. This paper introduces deign and test operation of cell system for the management of multivendor PLC by applying to wall paper process based on the manufacturing standardization of CIM. The analysis of designed multivendor PLC group is performed by selecting the parameters such as variation of data packet size and node number of PLC ladder logic program and variation by analyzing the corresponding variation values of token rotation time and waiting time for the system operation. For the method of the analysis,the equation is considering the overhead such as indicated packet service time and transmission safety margin for PLC network connection in M/G/1 queue model,and it is applied to the cell system and PLC group manage-ment for operation .Through the experiment,it is found that the realtime processing is possible with expanded and better result than the resuit obtained by Jayasumana.Browaka with PLC scan time considered,response lower limit of 10-20 msec. data packet size not more than 50 bytes.and the number of nodes less than 40.

  • PDF

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.