Optimal Deployment for Evacuation Safety Zone at Intermodal Transfer Station (복합환승센터 피난대피구역 적정 배치 방법론 개발)

  • You, So-Young;Jeong, Eunbi
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.18 no.1
    • /
    • pp.27-42
    • /
    • 2019
  • It is not easy to evacuate when people face with emergency situation in deep underground space because space perception and synthetic judgement are readily lowered. In stead of evacuating safely outside within the given time, evacuation safety zone is required to be designed and installed. In this study, PATS (Pedestrian movement based Assessment Toolkit for Simulation) is applied to build a comprehensive and analytic framework for seeking the optimal (or proper) numbers and locations of evacuation safety zone. With two scenarios of emergency situation at intermodal transfer center with the 6 floor in underground, the problematic location on the evacuation path has been identified and the proper locations has been presented.

Study on the measurement of blasting vibration response in construction a subway station at East gate of cultural treasure (지하철건설에 따른 문화재 보호와 동대문역사시공 보고서(1))

  • Choi, Sang-Yol;Ree, Soo-Book;Huh, Ginn;Chai, Soo-Yun
    • Journal of the Korean Professional Engineers Association
    • /
    • v.17 no.3
    • /
    • pp.32-49
    • /
    • 1984
  • The East gate station area is 205M long and 24m deep which is located 13 meter in front of cultural treasure east gate. The area to be excavated by blasting is composed of granite rocks from 10M depth to 25M. Surface earth extends to up 10M depth. This job site has in involves heavy traffic congestion such as over 10,000 cars passing in rush hour where clossing No 1 lint of subway running 3 minitues head way. This east gate station construction is to be executed for the provent of the setting down of underground level and blasting vibration effects to cultural treasure east gate. Therefore, the caltural treasure committee approved this execution subject to the following condition. 1. Subway gelogical foundation and measured natural frequency 2. Execution of water tight wall 3. Sellection and test of damping material for wall and under rail 4. Measurement of monitoring system during the execution 5. Measurement of histogram system The above two projects was carried out by Dr. Kwang team in KAIST and prof, Han in Hanyang University under accadamic study contract. In the blasting work, for the pourpose of reduced vibration and low explosion velocity such as CCR, Kovex slurry. The 2nd, used electrical caps shall be delay cap and M/S caps in multi delay. The 3rd, drilling pattern is bench cut in open cut and applied control blasting in tunnelling and also shall drill anti-vibration holes as line drilling.