• Title/Summary/Keyword: Danger Index

Search Result 75, Processing Time 0.02 seconds

Prediction of Bone Aging by Adapting Image J (Image J를 활용한 뼈의 노화도 예측법)

  • Jung, Hong Moon;Won, Do Yeon;Jung, Jae Eun
    • Korean Journal of Digital Imaging in Medicine
    • /
    • v.14 no.2
    • /
    • pp.63-67
    • /
    • 2012
  • Calcium density in human bones decreases as people are getting older due to the interior or exterior environmental factors. Bone aging forms osteoporosis. And this can bring out various spine fractures which develops a complications. Thus the prediction of seniliy is one of the important factors in spine diseases. Once spine aged, diverse fractures occur such as compression fracture and micro fracture. Side images of the spine by the digital radiography (DR) were prepared, and pixel arbitrary unit with Image J was measured from one spot in the lumbar bone part. By calculating pixel arbitrary unit of the simple contrast, it was obtained that the value of pixel arbitrary unit decreased as seniliy of bones increased. By simply applying Image J to the seniliy of patient's spine, the seniliy of bones predicts the level of danger with only digital radiography(2D) image. consequently we show that Image J value of pixel arbitrary unit index for predicts the level of precaution of osteoporosis patient.

  • PDF

Building of Collision Avoidance Algorithm based on CBR

  • Park Gyei-Kark;Benedictos John Leslie RM
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2006.11a
    • /
    • pp.39-44
    • /
    • 2006
  • Ship's collision avoidance is a skill that masters of merchant marine vessels have acquired through years of experience and that makes them feel at ease to guide their ship out from danger quickly compared to inexperienced officers. Case based reasoning(CBR) uses the same technique in solving tasks that needs reference from variety of situations. CBR can render decision-making easier by retrieving past solutions from situations that are similar to the one at hand and make necessary adjustments in order to adapt them. In this paper, we propose to utilize the advantages of CBR in a support system for ship's collision avoidance while using fuzzy algorithm for its retrieval of similar navigational situations, stored in the casebase, thus avoiding the cumbersome tasks of creating a new solution each time a new situation is encountered. There will be two levels within the Fuzzy-CBR. The first level will identify the dangerous ships and index the new case. The second level will retrieve cases from casebase and adapt the solution to solve for the output. While CBR's accuracy depends on the efficient retrieval of possible solutions to be adapted from stored cases, fuzzy algorithm will improve the effectiveness of solving the similarity to a new case at hand.

  • PDF

Evaluation of Heavy Metal Contamination in Streams within Samsanjeil and Sambong Cu Mining Area (삼산제일.삼봉 동광산 주변 수계의 중금속 오염도 평가)

  • Kim, Soon-Oh;Jung, Young-Il;Cho, Hyen-Goo
    • Journal of the Mineralogical Society of Korea
    • /
    • v.19 no.3 s.49
    • /
    • pp.171-187
    • /
    • 2006
  • The status of heavy metal contamination was investigated using chemical analyses of stream waters and sediments obtained from Samsanjeil and Sambong Cu mining area in Goseong-gun, Gyeongsangnam-do. In addition, the degree and the environmental risk of heavy metal contamination in stream sediments was assessed through pollution index (Pl) and danger index (DI) based on total digestion by aqua regia and fractionation of heavy metal contaminants by sequential extraction, respectively. Not only the degree of heavy metal contamination was significantly higher in Samsanjeil area than in Sambong area, but its environmental risk was also revealed much more serious in Samsanjeil area than in Sambong area. The differences in status and level of contamination and environmental risk between both two mining areas may be attributed to existence of contamination source and geology. Acid mine drainage is continuously discharged and flows into the stream in Samsanjeil mining area, and it makes the heavy metal contamination in the stream more deteriorated than in Sambong mining area in which acid mine drainage is not produced. In addition, the geology of Samsanjeil mining area is mainly comprised of andesitic rocks including a small amount of calcite and having lower pH buffering capacity fer acid mine drainage, and it is likely that the heavy metal contamination cannot be naturally attenuated in streams. On the contrary, the main geology of Sambong mining area consists of pyroclastic sedimentary Goseong formation containing a high content of carbonates, particularly calcite, and it seems that these carbonates of high pH buffering capacity prevent the heavy metal contamination from proceeding downstream in stream within that area.

Development of a New Flood Index for Local Flood Severity Predictions (국지홍수 심도예측을 위한 새로운 홍수지수의 개발)

  • Jo, Deok Jun;Son, In Ook;Choi, Hyun Il
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.1
    • /
    • pp.47-58
    • /
    • 2013
  • Recently, an increase in the occurrence of sudden local flooding of great volume and short duration due to global climate changes has occasioned the significant danger and loss of life and property in Korea as well as most parts of the world. Such a local flood that usually occurs as the result of intense rainfall over small regions rises quite quickly with little or no advance warning time to prevent flood damage. To prevent the local flood damage, it is important to quickly predict the flood severity for flood events exceeding a threshold discharge that may cause the flood damage for inland areas. The aim of this study is to develop the NFI (New Flood Index) measuring the severity of floods in small ungauged catchments for use in local flood predictions by the regression analysis between the NFI and rainfall patterns. Flood runoff hydrographs are generated from a rainfall-runoff model using the annual maximum rainfall series of long-term observations for the two study catchments. The flood events above a threshold assumed as the 2-year return period discharge are targeted to estimate the NFI obtained by the geometric mean of the three relative severity factors, such as the flood magnitude ratio, the rising curve gradient, and the flooding duration time. The regression results show that the 3-hour maximum rainfall depths have the highest relationships with the NFI. It is expected that the best-fit regression equation between the NFI and rainfall characteristics can provide the basic database of the preliminary information for predicting the local flood severity in small ungauged catchments.

A Study on Road Safety Evaluation Method for Improvement Project of Two-Lane Road (2차로 시설개량 사업의 도로 안전성 평가방법 연구)

  • Shin, Chul-Ho;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.1
    • /
    • pp.105-114
    • /
    • 2019
  • Recently, the paradigm of road policy has been focused on user safety. Recently, the number of road facility improvement project has been continuously increased but the economic feasibility (B/C ratio) is insufficient. Therefore, it is necessary to select a reasonable road improvement project through accurate and objective analysis of the road safety evaluation. In this study, to develop a new road safety evaluation method, data were collected based on the current road safety evaluation method for 75 routes including national roads and provincial ones. Based on the collected data, problems were analyzed and utilized as the basic factors of the new road safety evaluation method. Therefore, in this study, traffic accidents were reflected as a general evaluation item by weighing to solve these problems, and the evaluation items were added from experiences and ideas of the local public officials. For each evaluation item, a reasonable weight was determined through AHP (Analytic Hierarchy Process) questionnaire evaluation with highway experts. In addition, the safety index was determined based on the evaluation criteria for each evaluation item. The criteria for evaluating the danger zone are determined by the overall safety index. Finally, the criteria for selection of road improvement projects based on the overall risk level were derived.

Risk of Smoke Occurring in the Combustion of Plastics (플라스틱의 연소 시 발생하는 연기 위험성에 관한 연구)

  • You, Jisun;Chung, Yeong-jin
    • Fire Science and Engineering
    • /
    • v.33 no.1
    • /
    • pp.69-75
    • /
    • 2019
  • In this study, the combustibility of five types of plastic plates, fiber reinforced plastic (FRP), polystyrene (PS), polycarbonate (PC), polypropylene (PP), and polyvinyl chloride (PVC), were tested using a cone calorimeter (ISO 5660). The PVC plate showed a $44.65kW/m^2$ lower peak heat release rate (HRR) and a $30.97kW/m^2$ lower maximum average rate of heat emission than the other four types of plastics, whereas the PS plate showed a $773.44kW/m^2$ higher peak HRR and $399.14kW/m^2$ higher maximum average rate of heat emission. The PC plate and PS plate showed the highest HRR by a maximum of 3.88 times in $CO_{mean}$ yields, while the PS pate and PP plate showed the highest HRR by a maximum 4.88 times in $CO_{2mean}$ yields. In addition, the smoke performance index (SPI) of the PS plate decreased by 74.81%~95.99%; the smoke growth index (SGI) increased to 76%~300%; the smoke intensity (SI) also increased to 917.73% ~ 9607.57%, and the danger of smoke increased. The PS plate was found to have the highest risk of life damage due to smoke on the thermal and smoke sides.

The Relative Importance and Priority of the Health Evaluation Indicators of Old-growth and Giant Trees (노거수의 건강 위험도 평가 요소간 상대적 중요도 및 우선순위)

  • Xia, Tian-Tian;Zhang, Zhong-Feng;Kang, Tai-Ho
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.45 no.6
    • /
    • pp.149-159
    • /
    • 2017
  • There are many studies on the health and protection of Old-growth and Giant Trees, concentrating on empirical judgment and basic protection measures. The problem this study addresses is the relative importance and priority of the health evaluation indicators of Old-growth and Giant Trees. Firstly, this study exports the evaluation indicators of Old-growth and Giant Trees. The evaluation system for the degree of danger of Old-growth and Giant Trees are composed of two layers: 5 fields and 46 indicators. Secondly, using the AHP and PCA method can determine the weight of each field and each index factor. The process of AHP establishes the relative importance judgment matrix of each field and fully proves that the main cause of danger is individual aging. The PCA method suggested that trunk rot status, light conditions, tree surgeries, bacterial diseases, and soil moisture level are the most important factors in each field. These aspects should be given priority in the management and protection of Old-growth and Giant Trees. Weight values obtained in this study seemed to be useful in the evaluation of Old-growth and Giant Trees.

Comparison treatment planning with the measured change the dose of each Junction section according to the error of setup CSI Treatment with Conventional, IMRT, VMAT (Conventional, IMRT, VMAT을 이용한 CSI 치료시, Setup 오차에 따른 각 Junction부의 선량변화측정을 통한 치료계획 비교)

  • Lee, Ho Jin;Jeon, Chang Woo;Ahn, Bum Suk;Yu, Sook Hyeon;Park, So Yeon
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.26 no.2
    • /
    • pp.217-224
    • /
    • 2014
  • Purpose : Conventional, IMRT, at CSI treatment with VMAT, this study compare the treatment plan with dose changes measured at Junction field according to the error of Setup. Materials and Methods : This study established Conventional, the IMRT, VMAT treatment planning for CSI therapy using the Eclipse 10.0 (Eclipse10.0, Varian, USA) and chose person in Seoul National University Hospital. Verification plan was also created to apply IMRT QA phantom for each treatment plan to the film measurements. At this time, the error of Setup was applied to the 2, 4, 6mm respectively with the head and foot direction. ("+" direction of the head, "-" means that the foot direction.) Using IMRT QA Phantom and EBT2 film, was investigated by placing the error of Setup for each Junction. We check the consistency of the measured Film and plan dose distribution by gamma index (Gamma index, ${\gamma}$). In addition, we compared the error of Setup by the dose distribution, and analyzing the uniformity of the dose distribution within the target by calculating the Homogeneity Index (HI). Results : It was figured out that 90.49%-gamma index we obtained with film is agreement with film scan score and dose distribution of treatment plan. Also, depend on the dose distribution on distance, if we make the error of Setup 2, 4, 6mm in the head direction, it showed that 3.1, 4.5, 8.1 at $^*Diff$(%) of Conventional, 1.1, 3.5, 6.3 at IMRT, and 1.6, 2.5, 5.7 at VMAT. In the same way, if we make the error of Setup 2, 4, 6mm in the foot direction, it showed that -1.6, -2.8, -4.4 at $^*Diff$(%) of Conventional, -0.9, -1.6, -2.9 at IMRT, and -0.5, -2.2, -2.5 at VMAT. Homogeneity Index(HI)s are 1.216 at Conventional, 1.095 at IMRT and 1.069 at VMAT. Discussion and Conclusion : The dose-change depend on the error of Setup at the CSI RT(radiation therapy) using IMRT and VMAT which have advantages, Dose homogeneity and the gradual dose gradients on the Junction part is lower than that of Conventional CSI RT. This a little change of dose means that there is less danger on patients despite of the error of Setup generated at the CSI RT.

The Accuracy of Echocardiography and ECG in the Left Ventricular Hypertrophy (좌심실비대 진단에서 심장초음파와 심전도검사의 정확성)

  • Yang, SungHee;Lee, Jin-Soo;Kim, Changsoo
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.2
    • /
    • pp.666-672
    • /
    • 2016
  • We extracted 50 LVH patients out of 30'~80's who performing ECG and echocardiography examination. We used Devereux's theory to examinate LVH with echocardiography and used Sokolow-Lyon's theory to examinate LVH with ECG. We used regression and correlation analysis by SPSS, used ROC curve analysis to decide predominance of two ways of .Age, BMI, SBP and DBP whice are the danger factors of LVH and standard value of LVH diagnosis examination seems correlated. Out of 50 LVH patients, 50 patients were diagnosed LVH by echcardiography examination and only 21 patients were diagnosed LVH by ECG examination. Also echocardiography was AUC 99%, sensitivity 96%, singularity 95%, accuracy 95.5%. And ECG was AUC 76%, sensitivity 62%, singularity 76%, accuracy 68%.By comparing accuracy between echocardiography and ECG in diagnosing LVH, we could tell echocardiography was examination with higher accuracy. Therefore, if one was diagnosed with summit on 1st examination with ECG, considering age, body mass index, systolic blood pressure and dilator blood pressure, should offer echocardiography examination.

Automated assessment of cracks on concrete surfaces using adaptive digital image processing

  • Liu, Yufei;Cho, Soojin;Spencer, Billie F. Jr;Fan, Jiansheng
    • Smart Structures and Systems
    • /
    • v.14 no.4
    • /
    • pp.719-741
    • /
    • 2014
  • Monitoring surface cracks is important to ensure the health of concrete structures. However, traditional visual inspection to monitor the concrete cracks has disadvantages such as subjective inspection nature, associated time and cost, and possible danger to inspectors. To alter the visual inspection, a complete procedure for automated crack assessment based on adaptive digital image processing has been proposed in this study. Crack objects are extracted from the images using the subtraction with median filter and the local binarization using the Niblack's method. To adaptively. determine the optimal window sizes for the median filter and the Niblack's method without distortion of crack object an optimal filter size index (OFSI) is proposed. From the extracted crack objects using the optimal size of window, the crack objects are decomposed to the crack skeletons and edges, and the crack width is calculated using 4-connected normal line according to the orientation of the local skeleton line. For an image, a crack width nephogram is obtained to have an intuitive view of the crack distribution. The proposed procedure is verified from a test on a concrete reaction wall with various types of cracks. From the crack images with different crack widths and patterns, the widths of cracks in the order of submillimeters are calculated with high accuracy.