• Title/Summary/Keyword: Dam operation rule

Search Result 37, Processing Time 0.021 seconds

Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( I ) - Development of Single Dam Operation Models - (퍼지제어모형을 이용한 다목적 댐의 홍수조절모형( I ) - 단일댐의 운영모형 개발 -)

  • Shim, Jae-Hyun;Kim, Ji-Tae;Heo, Jun-Haeng;Kim, Jin-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.1 s.12
    • /
    • pp.33-40
    • /
    • 2004
  • The objective of this study is to develop single dam operation models for flood control using Fuzzy control technique, which can improve flood controllability. We set control rules by water level and inflow, and developed three models Fuzzy I, II, III according to rule to decide outflow. Fuzzy I model consists of six rules considering only flood control and Fuzzy II model considers the effect of water use by increasing water level at the end of flood control period as well as flood control during the same period. Finally, Fuzzy m is an adaptive model designed to perform multipurpose dam operation for both flood control and water use simultaneously based on a control rules.

A decision-centric impact assessment of operational performance of the Yongdam Dam, South Korea (용담댐 기존운영에 대한 의사결정중심 기후변화 영향 평가)

  • Kim, Daeha;Kim, Eunhee;Lee, Seung Cheol;Kim, Eunji;Shin, June
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.3
    • /
    • pp.205-215
    • /
    • 2022
  • Amidst the global climate crisis, dam operation policies formulated under the stationary climate assumption could lead to unsatisfactory water management. In this work, we assessed status-quo performance of the Yongdam Dam in Korea under various climatic stresses in flood risk reduction and water supply reliability for 2021-2040. To this end, we employed a decision-centric framework equipped with a stochastic weather generator, a conceptual streamflow model, and a machine-learning reservoir operation rule. By imposing 294 climate perturbations to dam release simulations, we found that the current operation rule of the Yongdam dam could redundantly secure water storage, while inefficiently enhancing the supply reliability. On the other hand, flood risks were likely to increase substantially due to rising mean and variability of daily precipitation. Here, we argue that the current operation rules of the Yongdam Dam seem to be overly focused on securing water storage, and thus need to be adjusted to efficiently improve supply reliability and reduce flood risks in downstream areas.

Improvement and Evaluation of Multi-purpose Dam Operation Rule Considering Climate Change (기후변화를 고려한 다목적댐 운영기준 개선 및 평가)

  • Kim, Hyung-San;Park, Jin-Hyeog;Kang, Shin-Uk;Jang, Su-Hyung
    • Journal of Wetlands Research
    • /
    • v.21 no.spc
    • /
    • pp.9-15
    • /
    • 2019
  • Rainfall patterns are changing due to climate change, the frequency of drought occurrence is shortening, and the operation of the multi-purpose dams is also changing. The importance of preventing water shortage of multi-purpose dams in advance and operation for stable water supply is increasing. In this study, we developed and evaluated the operational criteria reflecting climate change scenarios based on the operational criteria currently applied to multi-purpose dams. Standard water volume lines reflecting climate change were found to increase 34% on average, as a result of evaluation with the existing standard, it was analyzed that water supply would not be difficult if the multi-purpose dam operation standard reflecting climate change was applied. The results of this study are expected to be helpful for the establishment of multi-purpose dams reflecting climate change.

Optimized Boreoung Dam Emergency Diversion Tunnel Operation Rule Study, considering Water Quantity-BOD-Electric Power in Boreong Dam Water Supply Network (보령댐계통 물 공급망 운영에 있어서의 수량-수질(BOD)-전력을 고려한 보령댐 비상도수로 최적운영 Rule 연구)

  • Lim, Gun Muk;Kim, Sung Hoon;Ryoo, Kyung Sik;Jeong, Kwan Su
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.42-42
    • /
    • 2020
  • 충남서부권은 기상이변으로 강수량이 적고 가뭄이 심화되고 있는 반면, 신규수원 개발 적지 부족 등 용수공급에 어려움을 겪고 있다. 2015년부터 2016년까지 가뭄시 비상용수공급을 위해 비상도수로를 건설하였다. 이 비상도수로는 보령댐의 가뭄단계 상황기준으로 운영중에 있다. 가뭄단계 상황이 경계단계에 진입하면 도수로를 가동시작하여 관심단계 회복시에 중단하게 된다. 동 연구는 현재 운영중인 보령댐도수로의 가동Rule을 수량(이수안전도), 수질(BOD), 전력비용을 고려하여 시나리오별로(상시도수, 총 도수량대비 25%, 50%, 75%, 100%) 도수할 때 어느 도수 Rule이 수량-수질-에너지 넥서스 측면에서 가장 유리한지를 밝혀 내고자 하였다. 연구에 사용된 기초자료는 보령댐도수로 준공이후 2016년~2019년 도수실적 자료를 이용하였다. 수량(이수안전도) 검토는 MODSIM을 활용하였고, 수질개선효과는 실측 BOD를 기준으로 도수조건별로 오염부하량으로 검토하였다. 전력비용은 금강원수 도수년도별로 산정하여 분석하였다. 추가 연구결과를 통해 가뭄단계 상황기준, 월별 물관리 여건을 고려하여 기준향후 비상도수로 운영에 있어서 수량절량, 수질개선, 전력비용 절감을 기대할 수 있을 것이다.

  • PDF

Optimal Operation of Single Multi-Purpose Reservoir (단일다목적 저수지의 최적운영)

  • 이순택;이수식
    • Water for future
    • /
    • v.18 no.4
    • /
    • pp.347-359
    • /
    • 1985
  • This study aims at the development of DP-Model for the establishment of monthly optimal operation policy of single multi-puppose reservoir by which the water demand of downstream can be satisfied under the various physical constraints. Series, A. B. C. of inflow are selected out of future monthly inflow data which are simulated form the past monthly average inflow of Andong dam site. the neight possible alternatives in each inflow series are established in order that Andong dam can supply the water demand of Nagdong main stream of 30% to 100%. Nextly, the reservoir rule curves is derived for each alternative by the detailed seguential analysis of stroage, future inflow and water demand based on the reservoir continuite equation. Then, and alternative which can satisfy the objective function of system based on the rule curves in the exteream is determined as an optimal operation policy from the application of developed DP=Model.

  • PDF

Optimization of Multi-reservoir Operation with a Hedging Rule: Case Study of the Han River Basin (Hedging Rule을 이용한 댐 연계 운영 최적화: 한강수계 사례연구)

  • Ryu, Gwan-Hyeong;Chung, Gun-Hui;Lee, Jung-Ho;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.8
    • /
    • pp.643-657
    • /
    • 2009
  • The major reason to construct large dams is to store surplus water during rainy seasons and utilize it for water supply in dry seasons. Reservoir storage has to meet a pre-defined target to satisfy water demands and cope with a dry season when the availability of water resources are limited temporally as well as spatially. In this study, a Hedging rule that reduces total reservoir outflow as drought starts is applied to alleviate severe water shortages. Five stages for reducing outflow based on the current reservoir storage are proposed as the Hedging rule. The objective function is to minimize the total discrepancies between the target and actual reservoir storage, water supply and demand, and required minimum river discharge and actual river flow. Mixed Integer Linear Programming (MILP) is used to develop a multi-reservoir operation system with the Hedging rule. The developed system is applied for the Han River basin that includes four multi-purpose dams and one water supplying reservoir. One of the fours dams is primarily for power generation. Ten-day-based runoff from subbasins and water demand in 2003 and water supply plan to water users from the reservoirs are used from "Long Term Comprehensive Plan for Water Resources in Korea" and "Practical Handbook of Dam Operation in Korea", respectively. The model was optimized by GAMS/CPLEX which is LP/MIP solver using a branch-and-cut algorithm. As results, 99.99% of municipal demand, 99.91% of agricultural demand and 100.00% of minimum river discharge were satisfied and, at the same time, dam storage compared to the storage efficiency increased 10.04% which is a real operation data in 2003.

The method of securing water supply resources of existing dam by using Blue dam (Blue dam을 활용한 기존 댐 시설물 상수도 원수 추가 확보 방안)

  • Choo, Tai-Ho;Yoon, Hyeon-Cheol;Yun, Gwan-Seon;Kwon, Yong-Been;Shim, Su-Yong;Chae, Soo-Kwon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.2
    • /
    • pp.243-249
    • /
    • 2015
  • To improve stability of the water resources that were seriously affected by climate change and various environmental effects and to supply the clean water always, continuous efforts are essential. Provision of measures with respect of hardware is basically essential to improve the water resources stability due to the topographic characteristic in Korea. However, building a new dam becomes gradually very difficult because of a hardship in selecting right places, opposition forces such as environment and local residents, negative publicity for large civil engineering projects, and so on. The present study, therefore, proposes the Blue dam as an alternative for securing the water resources of a new concept considering domestic conditions. To evaluate the effect of the Blue dam, the Hec-ResSim model is used and the probabilistic discharge flow rate is applied. As a result, when Dam Yeongcheon is applied as a study area, securing water resources of 14 million tons are predicted be secured and the flood control of 15.4 million tons is expected, in comparison with operation of the existing dam only. Consequently, Blue dams are supposed to carry out the function of securing water resources, controling flood, maintaining eco-environmental instream flow, generating hydroelectric power, and providing spaces for recreational activities.

Study of Operation Rules for Flood Control to Seomjin River Dam Using HEC-ResSim (HEC-ResSim을 이용한 섬진강댐의 홍수조절 운영룰에 관한 연구)

  • Ahn, Jung Min;Lyu, Siwan;Kim, Joo Cheol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.2B
    • /
    • pp.93-101
    • /
    • 2012
  • HEC-ResSim, reservoir operation model, is applied to Seomjin river dam in order to establish a rational method for water supply and flood control by dam operation. In order to minimize downstream flood damage for Seomjin river basin and adjacent regions, reservoir routing is applied to several frequency flood events within the framework of rainy seasonal operation rule and then the characteristics change of hydrological behavior for the downstream of study area is investigated in depth. Its quantitative efficiency and estimation method is evaluated on the basis of the adjustment scheme of conservation water surface elevation for flood control and water secure; reservoir routing considering preliminary release and variable restricted water level; and its effect to water supply; and downstream flood-duration analysis.

Reservoir Operation by Drought Forecasting and Warning (가뭄 예ㆍ경보에 의한 저수지 운영에 관한 연구)

  • Yi, Jae-Eung;Kim, Young-A
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.10
    • /
    • pp.837-844
    • /
    • 2004
  • In this study, the efficient reservoir operation is studied by comparing results from reservoir operation using a basin drought forecasting and warning system with an existing reservoir operation rule. As a result, it is found that the reliability and average annual storage of reservoir operation using a basin drought forecasting and warning system and release coefficients is better than those of reservoir operation using the existing operation rule. The release coefficients for Yongdam dam located in the Geum river basin selected as a case study are found to be the most effective for the value of 0.95 for the drought watch, 0.9 for the drought warning and 0.85 for the drought emergency. The reservoir operation using a drought forecasting and warning enables the use of the limited water resources effectively during drought and will contribute the national water resources management.

Evaluation of hydropower dam water supply capacity (III): development and application of drought operation rule for hydropower dams in Han river (발전용댐 이수능력 평가 연구 (III): 한강수계 발전용댐 가뭄단계별 운영기준 개발 및 효과 분석)

  • Jeong, Gimoon;Kang, Doosun;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.531-543
    • /
    • 2022
  • Integrated water resources management (IWRM) has focused on efficient response to various water related disasters by climate change. In particular, more flexible usage of conventional water resources infrastructures is expected to provide an eco-friendly water management. Multi-purpose dams and water supply dams are well known as water management facilities for securing and supplying water in drought season. Recently, based on the report '2021 multi-purpose use of hydropower dams in Han river', contribution of hydropower dams on water resources management is becoming more significant beyond the traditional role of hydropower generation. In drought conditions, the dams control water supply depending on the pre-defined drought stages. In the case of multi-purpose dams, an operation standard during drought has been already prepared and applied; however, for the hydropower dams, specific standards are not fully prepared yet in South Korea. In this study, a method for calculation of standard water storage and discharge reduction of hydropower dams according to drought stage is newly proposed reflecting the characteristics of hydropower dams. The proposed method was applied to the hydropower dams in Han river, where six hydropower dams are located. A case study of the historical droughts occurred in 2014-2017 demonstrated that the proposed hydropower dam operation rule could improve the water supply stability under severe drought conditions compared to the conventional operations. In the future, the role of hydropower dams for water resources management is expected to become more important, and this study can be widely used for water supply planning such as drought response using hydropower dams.