• Title/Summary/Keyword: Dam monitoring system

Search Result 80, Processing Time 0.024 seconds

Development of River Management System with Operation of an Experimental Watershed (시험유역의 운영을 통한 하천관리시스템의 개발)

  • Kim, Sang Ho;Choi, Hung Sik;Lee, Eul Rae
    • Journal of Wetlands Research
    • /
    • v.8 no.1
    • /
    • pp.59-71
    • /
    • 2006
  • River Management System was developed to achieve water quality analysis that reflects physical characteristics of river flow. The Gyecheon basin which is located at the upstream of Hoengseong dam was selected as an experimental watershed and hydrologic and water quality monitoring network was set up for acquisition of real time data. The observed data have been stored in the system until present. The hydraulic and water quality models were constructed for an experimental watershed, and the calibration and verification was performed using past flood events and observed water quality data. Graphic User Interface(GUI) was developed with ArcView in a study area. Developed system can be effectively used to water quality monitoring and management in Hoengseong Lake.

  • PDF

Implementation of the real-time trigger detection for loose parts monitoring (금속파편감시를 위한 트리거 판단 알고리즘의 실시간 구현)

  • Hwang, Hee-Jung;Sohn, Chang-Ho;Ryu, Jae-Kyu;Baek, Kwang-Ryul
    • Proceedings of the KIEE Conference
    • /
    • 2006.07d
    • /
    • pp.1785-1786
    • /
    • 2006
  • 본 논문에서 개발한 시스템은 원자력 발전소의 금속파편감시계통(Loose parts monitoring system, LPMS)에서 충격신호의 탐지를 위해 사용되는 하드웨어와 관련이 있는 트리거 판단을 위한 보드이다. LPMS는 원자로 내부에서 발생하는 금속 파편이나 이물질의 존재 여부와 위치를 정확히 찾아내 원자력 발전소의 불필요한 가동중단이나 예기치 않은 안전 사고를 예방 할 수 있는 시스템이다. 본 논문에서 개발한 DAM(Data acquisition module)보드는 LPMS의 하드웨어 중에서 입력된 신호를 디지털로 변환하여 충격신호의 트리거 여부를 판단하는 기능을 한다. DAM은 디지털 필터와 트리거 판단을 위한 알고리즘이 DSP에서 실시간으로 처리되어 DMS의 기능을 업그레이드 하였다. 개발된 시스템은 기존 외국 장비에 비하여 하드웨어 성능이 대폭 향상되었으며 하드웨어의 완전 국산화 개발이라는 특징이 있다.

  • PDF

Analysis of the Effects of Drainage Systems in Wetlands Based on Changes in Groundwater Level, Soil Moisture Content, and Water Quality (지하수위, 토양수분함량 및 수질변화를 활용한 습윤화 지역의 배수시설 효과 평가)

  • Kim, Chang-Hoon;Ryu, Jeong-Ah;Kim, Deog-Geun;Kim, Gyoo-Bum
    • The Journal of Engineering Geology
    • /
    • v.26 no.2
    • /
    • pp.251-260
    • /
    • 2016
  • Groundwater flow due to hydraulic gradients across a geologic barrier surrounding a dam reservoir can cause swamps or wetlands to form on the downstream side of the dam, thereby restricting land use. The difference in head between the reservoir level and the downstream groundwater level creates a hydraulic gradient, allowing water to flow through the geologic barrier. We constructed a drainage system at the Daecheong dam to study the effects on groundwater levels and soil moisture contents. The drainage system consisted of a buried screened pipe spanning a depth of 1-1.5 m below a land surface. Groundwater levels were monitored at several monitoring wells before and after the drainage system was installed. Most well sites recorded a decline in groundwater level on the order of 1 m. The high-elevated site (monitoring well W1) close to the reservoir showed a significant decline in groundwater level of more than 2 m, likely due to rapid discharge by the drainage system. Soil moisture contents were also analyzed and found to have decreased after the installation of the drainage system, even considering standard deviations in the soil moisture contents. We conclude that the drainage system effectively lowered groundwater levels on the downstream side of the dam. Furthermore, we emphasize that water seepage analyses are critical to embankment dam design and construction, especially in areas where downstream land use is of interest.

Earthquake risk assessment of concrete gravity dam by cumulative absolute velocity and response surface methodology

  • Cao, Anh-Tuan;Nahar, Tahmina Tasnim;Kim, Dookie;Choi, Byounghan
    • Earthquakes and Structures
    • /
    • v.17 no.5
    • /
    • pp.511-519
    • /
    • 2019
  • The concrete gravity dam is one of the most important parts of the nation's infrastructure. Besides the benefits, the dam also has some potentially catastrophic disasters related to the life of citizens directly. During the lifetime of service, some degradations in a dam may occur as consequences of operating conditions, environmental aspects and deterioration in materials from natural causes, especially from dynamic loads. Cumulative Absolute Velocity (CAV) plays a key role to assess the operational condition of a structure under seismic hazard. In previous researches, CAV is normally used in Nuclear Power Plant (NPP) fields, but there are no particular criteria or studies that have been made on dam structure. This paper presents a method to calculate the limitation of CAV for the Bohyeonsan Dam in Korea, where the critical Peak Ground Acceleration (PGA) is estimated from twelve sets of selected earthquakes based on High Confidence of Low Probability of Failure (HCLPF). HCLPF point denotes 5% damage probability with 95% confidence level in the fragility curve, and the corresponding PGA expresses the crucial acceleration of this dam. For determining the status of the dam, a 2D finite element model is simulated by ABAQUS. At first, the dam's parameters are optimized by the Minitab tool using the method of Central Composite Design (CCD) for increasing model reliability. Then the Response Surface Methodology (RSM) is used for updating the model and the optimization is implemented from the selected model parameters. Finally, the recorded response of the concrete gravity dam is compared against the results obtained from solving the numerical model for identifying the physical condition of the structure.

Development of a Decision Support System for Turbid Water Management through Joint Dam Operation

  • Kim, Jeong-Kon;Ko, Ick-Hwan;Yoo, Yang-Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.31-39
    • /
    • 2007
  • In this study we developed a turbidity management system to support the operation for effective turbid water management. The decision-making system includes various models for prediction of turbid water inflow, effective reservoir operation using the selective withdrawal facility, analysis of turbid water discharge in the downstream. The system is supported by the intensive monitoring devices installed in the upstream rivers, reservoirs, and downstream rivers. SWAT and HSPF models were constructed to predict turbid water flows in the Imha and Andong catchments. CE-QUAL-W2 models were constructed for turbid water behavior prediction, and various analyses were conducted to examine the effects of the selective withdrawal operation for efficient high turbid water discharge, turbid water distribution under differing amount and locations of turbid water discharge. A 1-dimensional dynamic water quality model was built using Ko-Riv1 for simulation of turbidity propagation in the downstream of the reservoirs, and 2-dimensional models were developed to investigate the mixing phenomena of two waters discharged from the Andong and Imha reservoirs with different temperature and turbidity conditions during joint dam operation for reducing the impacts of turbid water.

  • PDF

A STUDY ON THE SAFETY ANALYSIS OF ROCK FILL DAM (1) (필댐의 안정성 해석 연구 (1))

  • HoWoongShon;DaeKeunLee
    • Journal of the Korean Geophysical Society
    • /
    • v.6 no.3
    • /
    • pp.165-177
    • /
    • 2003
  • The purpose of this paper is to analyze the behavior and to study the safety evaluation of the Unmun Dam located in Cheongdo-Gun of GyeongBuk Province, Korea. For this purpose, soil analyses including boring data, geophysical surveys were conducted. In this paper, especially many geophysical methods were adopted to configure out the subsurface situation of dam. Applied geophysical methods were: 1) electric resistivity survey, 2) high frequency magnetotelluric (HFMT) survey, 3) ground penetrating radar (GPR) survey, 4) seismic refraction survey, 5) seismic cross-hole tomography survey, and 6) high frequency impedance (ZHF) survey. Each of geophysical surveys were analyzed and joint analyses between geophysical surveys were also performed to deduce the more reliable subsurface information of Dam by using the features and characteristics of each geophysical survey. Since many defects, such as gravel and weathered rock blocks in the dam core, and lots of amounts of leakage, by boring analyses were found, reinforcement by compaction grouting system (CGS) has been conducted in some range of dam. Some geophysical data and data of geotechnical gauges were also used to confirm the effects of reinforcement. Electric resistivity, EM, GPR, ZHF, seismic refraction and seismic tomography surveys show that left side of dam is weak, which means the possibility of existence of gravel, rock block, water and cavities in the core of dam. This result coincides with the boring data. Especially, electric survey after reinforcement shows that even the right side of the dam has been deformed by the strong pressure during the reinforcement itself. As a conclusion, some problems in the dam found. Especially, the dam near spillway shows the high possibility of leakage. It should be pointed out that only the left side of he dam has not a leakage problem. As a whole, the dam has problems of weakness, because of unsatisfactory construction. It is strongly recommended that highly intensive monitoring is required.

  • PDF

Implementation of an Export System for GIS Arrester Facilities (GIS 피뢰설비 전문가 시스템 구현)

  • Kim, Il-Kwon;Song, Jae-Yong;Moon, Seung-Bo;Cha, Myung-Soo;Rhyu, Keel-Soo;Kil, Gyung-Suk
    • Proceedings of the KIEE Conference
    • /
    • 2006.07c
    • /
    • pp.1465-1466
    • /
    • 2006
  • The monitoring and diagnosing technique for lightning arresters is important to assure the reliability of power supply in GIS-substation. In this paper, we described the implementation of an expert system for GIS arrester facilities. The proposed system consists of a data acquisition module (DAM), a wireless communication module, and a personal computer. The DAM detects system voltages, total leakage currents and its harmonic components, and includes an algorithm to calculate the resistive leakage current by the principle that the magnitudes of resistive leakage current are equal at the same level of the system voltage applied to the arrestor. Also, we designed a surge event detection circuit which can acquire the date, the polarity, and the amplitude of surge events. All the acquired data are transmitted after correction by many algorithms to the remote station through the ZigBee protocol. The expert system is based on the Jave Expert System Shell (JESS) and make more reliable decision by using an exclusive inference process.

  • PDF

Hydrological observation system deployment for water Water quantity, quality management (수자원 수량, 수질관리를 위한 수문관측시스템 구축방안)

  • Yu, Se-hwan;Jang, Dong-bae
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2014.10a
    • /
    • pp.882-885
    • /
    • 2014
  • The duration and frequency of flooding and not last long, by the time climate change drought. The increased accordingly by reducing stream flow and year variation. This trend is expected to continue, and change towards a comprehensive analysis of such quantity, quality and management of water resources are managed. Flood warning system is called to perform them electronically to the management of water resources such as these to be in the organic water-related basic data acquisition, storage, processing and utilization. Can be divided into hydrological observations and flood warning systems alert system broadcast system. Hydrological observation system is the measurement from the hydrological stations (water level, rainfall, water) that can be observed hydrological status of the dam basin hydrological observation data transmitted to the central office, located at the dam monitoring and control system through a variety of networks including satellite, and the collected defined as the system that sent the K-water head office in 1 minute increments hydrological observation data. Headquartered in support of this decision. Dimensions of the dam are provided in addition to inward. Channeled through various hydrologic analysis and leveraging the data transfer. This paper looks at ways to build out hydrological observation system.

  • PDF

Design and Implementation of amount of contained water, earth and sand Monitoring System based on IoT (IoT기반 저수지/사방댐 담수량 및 토사량 모니터링 시스템 설계 및 구현)

  • Hong, Seong-Pyo
    • Journal of Digital Contents Society
    • /
    • v.18 no.4
    • /
    • pp.787-793
    • /
    • 2017
  • This paper proposes the IoT based monitoring system to reservoir and erosion control dam that measure amount of contained water and amount of sediment by real time through unit volume block object modeling and support the related image. The proposed system is more effective in establishing a more accurate dredging plan and effectively managing efficient water management plans, and effectively preventing accidents such as landslides, etc.

Study on the Stability Analysis and Supporting Methods for the Spillway Slopes in Boryeong Dam (보령댐 여수로 사면의 안정성 분석 및 유지방안 연구)

  • 정소걸;한공창;최성웅;박연준
    • Tunnel and Underground Space
    • /
    • v.8 no.1
    • /
    • pp.37-45
    • /
    • 1998
  • In this study, two dimensional and three dimensional numerical analysis were performed with a finite difference code for the safe maintenance of the spillway slope of the Boryeong dam. Results of the geological survey and the stereographic projection analysis on the discontinuities were used as input data for the numerical analysis. As a result, several suggestions were given such as the reinforcement of the local tension zone, the decrease in the angle of the slope, the drawdown of the pore pressure in the slope and the removal of the upper benches. A systematic and long-term monitoring system was also suggested.

  • PDF