• Title/Summary/Keyword: Dam Mining

Search Result 36, Processing Time 0.023 seconds

Riparian Environment Change and Vegetation Immigration in Sandbar after Sand Mining (골채채취 후 수변환경 변화와 사주 내 식생이입)

  • Kong, Hak-Yang;Kim, Semi;Lee, Jaeyoon;Lee, Jae-An;Cho, Hyungjin
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.2
    • /
    • pp.135-141
    • /
    • 2016
  • This study investigated changes of hydrology, soil characteristics, riparian vegetation communities, and geomorphology in sandbars before and after sand-mining to determine the effect of sand-mining at upstream of Guemgang and Bochungcheon streams in Korea. Sand-mining events affected the mining area. They supplied organic matters and nutrients during flood. Sediment deposition caused soil texture change and expansion of vegetation area. However, riverbeds were stabilized after the disturbance. According to the analyses of aerial photographs, the vegetation area was significantly expanded in both dam-regulated streams and dam-unregulated streams after sand-mining. Willow shrubs advanced in disturbed area at an average of 10 years after sand-mining. It took willows trees 10.6 years to become dominant communities. Therefore, it took a total of 20.6 years for new riparian forest to form in sandbar after sand-mining. Our results confirmed that stream flow condition were dependent on vegetation recruitment in dam-regulated streams and dam-unregulated streams. For willow recruitment in unregulated streams, calculation of water level below dimensionless bed shear stress is important because low water level variation is a limiting factor of vegetation recruitment.

An alternative upstream method for the Zhelamuqing tailings impoundment construction of a Copper Mine in China

  • Wei, Zuoan;Chen, Yulong;Yin, Guangzhi;Yang, Yonghao;Shu, Weimin
    • Geomechanics and Engineering
    • /
    • v.19 no.5
    • /
    • pp.383-392
    • /
    • 2019
  • How to safely and economically dispose mining tailings is a challenge to mine operators. This paper presents an alternative upstream method for tailings dam construction, termed as the template construction method (TCM), which has been successfully implemented at Zhelamuqing tailings impoundment since 2004. By the beginning of 2015, the tailings dam wall had reached 95 m in height for the 46 upstream raises, with the total height of the dam including the starter dyke being 128 m. The proposed TCM is relatively simple and cost-effective and provides a good way for constructing rapidly raising tailings dam based on this case.

Evaluation of Water Quality Prediction Models at Intake Station by Data Mining Techniques (데이터마이닝 기법을 적용한 취수원 수질예측모형 평가)

  • Kim, Ju-Hwan;Chae, Soo-Kwon;Kim, Byung-Sik
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.5
    • /
    • pp.705-716
    • /
    • 2011
  • For the efficient discovery of knowledge and information from the observed systems, data mining techniques can be an useful tool for the prediction of water quality at intake station in rivers. Deterioration of water quality can be caused at intake station in dry season due to insufficient flow. This demands additional outflow from dam since some extent of deterioration can be attenuated by dam reservoir operation to control outflow considering predicted water quality. A seasonal occurrence of high ammonia nitrogen ($NH_3$-N) concentrations has hampered chemical treatment processes of a water plant in Geum river. Monthly flow allocation from upstream dam is important for downstream $NH_3$-N control. In this study, prediction models of water quality based on multiple regression (MR), artificial neural network and data mining methods were developed to understand water quality variation and to support dam operations through providing predicted $NH_3$-N concentrations at intake station. The models were calibrated with eight years of monthly data and verified with another two years of independent data. In those models, the $NH_3$-N concentration for next time step is dependent on dam outflow, river water quality such as alkalinity, temperature, and $NH_3$-N of previous time step. The model performances are compared and evaluated by error analysis and statistical characteristics like correlation and determination coefficients between the observed and the predicted water quality. It is expected that these data mining techniques can present more efficient data-driven tools in modelling stage and it is found that those models can be applied well to predict water quality in stream river systems.

Dam seepage investigation using two- and three-dimensional resistivity surveys (2차원 및 3차원 전기비저항 탐사를 이용한 제당 누수 조사)

  • Yi Myeong-Jong;Kim Jung-Ho;Song Yoonho;Chung Seung-Hwan
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2000.09a
    • /
    • pp.41-53
    • /
    • 2000
  • Electrical resistivity survey is widely applied to the dam seepage problems. Main purpose of the resistivity survey is to delineate the inhomogeneity in the dam. In this study, two- (2-D) and three-dimensional (3-D) resistivity survey methodology and corresponding interpretations of the data have been analyzed using 3-D resistivity modeling results. Since resistivity structures beneath the dam and its shape are 3-D in nature, we could get more accurate image of the dam structures using 3-D survey compared to 2-D survey even though we cannot employ the grid-shape survey layout.

  • PDF

Evaluation about Contaminant Migration Near Abandoned Mine in Central Region (중부지역에 위치한 폐광산 주변의 오염물질 이동성 평가)

  • Lee, Jong-Deuk;Kim, Tae-Dong;Jeon, Gee-Seok;Kim, Hee-Joung
    • Journal of Soil and Groundwater Environment
    • /
    • v.15 no.6
    • /
    • pp.29-36
    • /
    • 2010
  • Several mines including Namil, Solim and Jungbong which are located in the Gyeonggi and Kangwon province have been abandoned and closed since 1980 due to "The promotion policy of mining industry". An enormous amount of mining wastes was disposed without proper treatment, which caused soil pollution in tailing dam and ore-dressing plant areas. However, any quantitative assessment was not performed about soil and water pollution by transporting mining wastes such as acid mine drainage, mine tailing, and rocky waste. In this research, heavy metals in mining wastes were analyzed according to leaching method which used 0.1 N HCl and total solution method which used Aqua-regia to recognize the ecological effect of distance from hot spot. We sampled tailings, rocky wastes and soils around the abandoned mine. Chemical and physical parameters such as pH, electrical conductivity (EC), total organic carbon (TOC), soil texture and heavy metal concentration were analyzed. The range of soil's pH is between 4.3 and 6.4 in the tailing dam and oredressing plant area due to mining activity. Total concentrations of As, Cu, and Pb in soil near ore dressing plant area are 250.9, 249.3 and 117.2 mg/kg respectively, which are higher than any other ones near tailing dam area. Arsenic concentration in tailing dams is 31.0 mg/kg, which is also considered as heavily polluted condition comparing with the remediation required level(RRL) in "Soil environment conservation Act".

Pseudo seismic and static stability analysis of the Torul Dam

  • Karabulut, Muhammet;Genis, Melih
    • Geomechanics and Engineering
    • /
    • v.17 no.2
    • /
    • pp.207-214
    • /
    • 2019
  • Dams have a great importance on energy and irrigation. Dams must be evaluated statically and dynamically even after construction. For this purpose, Torul dam built between years 2000 and 2007 Harsit River in Gümüşhane province, Turkey, is selected as an application. The Torul dam has 137 m height and 322 GWh annual energy production capacity. Torul dam is a kind of concrete face rock fill dam (CFRD). In this study, static and pseudo seismic stability of Torul dam was investigated using finite element method. Torul dam model is constituted by numerical stress analysis named Phase2 which is based on finite element method. The dam was examined under 11 different water filling levels. Thirteenth stage of the numerical model is corresponding full reservoir condition which water filled up under crest line. Besides, pseudo static coefficients for dynamic condition applied to the dam in fourteenth stage of the model. Stability assessment of the Torul dam has been discussed according to the displacement throughout the dam body. For static and pseudo seismic cases, the displacements in the dam body have been compared. The total displacements of the dam according to its the empty state increase dramatically at the height of the water level of about 70 m and above. Compared to the pseudo-seismic analysis, the displacement of dam at the full reservoir condition is approximately two times as high as static analysis.

Pressure analysis in grouting and water pressure test to achieving optimal pressure

  • Amnieh, Hassan Bakhshandeh;Masoudi, Majid;Kolahchi, Reza
    • Geomechanics and Engineering
    • /
    • v.13 no.4
    • /
    • pp.685-699
    • /
    • 2017
  • In order to determine the rate of penetrability, water pressure test is used before the grouting. One of the parameters which have the highest effect is pressure. Mathematical modeling is used for the first time in this study to determine the optimum pressure. Thus, the joints that exist in the rock mass are simulated using cylindrical shell model. The joint surroundings are also modeled through Pasternak environment. In order to validate the modeling, pressure values obtained by the model were used in the sites of Seymareh and Aghbolagh dams and the relative error rates were measured considering the differences between calculated and actual pressures recorded in these operations. In water pressure test, in Seymareh dam, the error values were equal to 4.75, 3.93, 4.8 percent and in the Aghbolagh dam, were 22.43, 5.22, 2.6 percent and in grouting operation in Seymareh dam were equal to 9.09, 32.50, 21.98, 5.57, 29.61 percent and in the Aghbolagh dam were 2.96, 5.40, 4.32 percent. Due to differences in rheological properties of water and grout and based on the overall results, modeling in water pressure test is more accurate than grouting and this error in water pressure test is 7.28 percent and in grouting is 13.92 percent.

Extensometers results correction in concrete dams: A case study in RCC Zhaveh Dam

  • Ziaei, Ahad;Ahangari, Kaveh;Moarefvand, Parviz;Mirzabozorg, Hasan
    • Structural Monitoring and Maintenance
    • /
    • v.4 no.1
    • /
    • pp.17-31
    • /
    • 2017
  • Since extensometers are used to determine the absolute deformation of foundation and abutments and all results are obtained in reference to the base rod, the accuracy of these results has been constantly a subject of debate. In this regard, locating and installing extensometers outside the range of effect zone is also another challenge. The main purpose of this paper is to investigate and modify extensometers results based on the mentioned issues. For this aim, the concrete RCC Zhaveh dam in Iran was selected as the case study. To study the results of extensometers installed in this dam, first, the 3DEC_DP 5.00 software was applied for numerical modeling. Parameters such as discontinuities, dead load and piezometric pressure in the interface of concrete and rock were considered. Next, using the results obtained from 6 extensometers in foundation and abutments and 4 clinometers in dam body, the numerical model was calibrated through back analysis method. The results indicate that the base rod is moved and is not recommended being used as the base point. In other words, because installation of base anchor outside the range of effect zone is not possible due to the operational and economic considerations, the obtained results are not accurate enough. The results indicate a considerable 2-3 mm displacement of the base rod (location of the base anchor) in reference to the real zero point location, which must be added to the base rod results.

An Analysis of Streambed Changes Downstream of Daecheong Dam

  • Seo, Hyeong-Deok;Jeong, Sang-Man;Kim, Lee-Hyung;Choi, Kyu-Ho
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.1
    • /
    • pp.103-108
    • /
    • 2008
  • Riverbed change is greatly influenced by artificial factors such as dam construction, gravel collection, and river improvement. This study simulated a long-term bed change based on the GSTARS3 model using actual data from the area downstream of the Geum River Daecheong Dam and compared the estimation with a section of the actual measurement. As a result, it was found that the section of the actual measurement was far lower than the result of the simulation in terms of long-term bed change. While the area downstream of Daecheong Dam displayed approximately an average of 2.29 m of streambed degradation on average while the upper stream area showed approximately 0.63 m of bed degradation over 24 years. In the simulation of the area downstream of Daecheong Dam based on the GSTARS3 model, similar bed degradation was observed. However, a great difference was detected between the result and the actual measurement. According to the cause analysis, the riverbed in the area downstream of Daecheong Dam has continuously degraded due to the dam construction and mass collection of gravel. The mass collection of gravel was the main cause of riverbed change. It was found that about 76% of all riverbed degradation was caused by the mass collection of gravel.

Reliable monitoring of embankment dams with optimal selection of geotechnical instruments

  • Masoumi, Isa;Ahangari, Kaveh;Noorzad, Ali
    • Structural Monitoring and Maintenance
    • /
    • v.4 no.1
    • /
    • pp.85-105
    • /
    • 2017
  • Monitoring is the most important part of the construction and operation of the embankment dams. Applied instruments in these dams should be determined based on dam requirements and specifications. Instruments selection considered as one of the most important steps of monitoring plan. Competent instruments selection for dams is very important, as inappropriate selection causes irreparable loss in critical condition. Lack of a systematic method for determining instruments has been considered as a problem for creating an efficient selection. Nowadays, decision making methods have been used widely in different sciences for optimal determination and selection. In this study, the Multi-Attribute Decision Making is applied by considering 9 criteria and categorisation of 8 groups of geotechnical instruments. Therefore, the Analytic Hierarchy Process and Multi-Criteria Optimisation and Compromise Solution methods are employed in order to determine the attributes' importance weights and to prioritise of instruments for embankment dams, respectively. This framework was applied for a rock fill with clay core dam. The results indicated that group decision making optimizes the selection and prioritisation of monitoring instruments for embankment dams, and selected instruments are reliable based on the dam specifications.