• Title/Summary/Keyword: Curtain Wall Process

Search Result 38, Processing Time 0.025 seconds

The Improvement of Curtain Wall Design Process using Value Stream Mapping Tools (VSM기법을 활용한 커튼월 공사의 설계 프로세스 개선)

  • Kim, Chang-Duk;Lee, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.128-137
    • /
    • 2006
  • This paper is to develop curtain wall process life-cycle system in high-rise buildings in order to establish effective cooperation communication channels among the diverse constituents. This paper is to provide a base toward a curtain wall life-cycle management system to support decision making and the effective flow in light of information and materials. The four objectives of the research are 1) the analysis of the current curtain wall life-cycle process, 2) the analysis and development of the curtain wall design process As-Is model, and 3) the Muda analysis of the design process As-Is model and the suggestion of the improvements, 4) the development of curtain wall design To-Be model and comparative analysis of the improvement in terms of value streams. This research indicates the wastes decrease (or the values increase) from 6.7% up to 100% in different decision criteria through the improvement by the comparative analysis between the As-ls and To-Be curtain wall design process. This research suggests the potential improvement by VSM and a curtain wall life-cycle management system in curtain wall construction for diverse constituents be significant.

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

Efficiency Analysis for RFID-based Curtain Wall of unit Type Construction (RFID 기술 적용에 따른 유닛타입 커튼월 공사의 효율성 분석)

  • Kang, Hyun-Koo;Ha, Young-Seo;Lim, Chul-Woo;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.206-213
    • /
    • 2008
  • Due to the following reasons, the management of curtain wall parts and material is very Important. Firstly, curtain wall work is one of the main works in High-rise building construction for it takes about $10{\sim}15%$ of the total construction cost. Secondly, the whole process of curtain wall work including manu acture, delivery, storage, installation and maintenance is very complicated and sometimes more than 30 companies involve in the process. Thus there are many control points for curtain wall units. Thirdly, there are not enough space on site for material storage and this situation is more serious for sites in urban area. The purpose of this research is to validate an information systems using RFID technology that is developed to manage the curtain wall units following the process of curtain wall work. For the validation, the cycle times of curtain wall work before and a ter the system was used. The results show that using the systems shorten the cycle time of the curtain wall work. Thus it is concluded that the system can increase the efficiency of managing curtain wall work.

A study of Engineering analysis for improvement in practical use of RFID+4D system (RFID+4D 시스템 활용도 향상을 위한 엔지니어링 분석)

  • Hwang, Kyoung-Hoon;Ahn, Chi-Sun;Yoon, Su-Won;Schin, Sang-Yoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.173-175
    • /
    • 2011
  • A study is for improvement in practical use of RFID+4D. In the yard of construction industry, using information has become more important part to control total process. One of the way to improve the information using that comes from each step, RFID is getting attention. But it's not really adapted on construction industry. Especially, a study on the curtain wall part has a problem of engineering process. Each steps of curtain wall process are separated. If it' could be connect totally, controling information of curtain wall from producing to fitting become more efficient with adapted RFID+4D.

  • PDF

Application of Supply Chain Management Concept to the Various Types of Curtain Wall Construction (커튼월의 공법 및 조달 유형에 따른 SCM 적용방안)

  • Moon Woo-Kyoung;Yun Soo-Won;Kim Yea-Sang;Chin Sangyoon;Park Ji-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.612-615
    • /
    • 2004
  • Today, the curtain wall is used in many construction projects because of excellent economical efficiency and constructability. The life-cycle process of curtain wall construction consists of the architectural design, curtain wall design, manufacturing, const겨ction, and maintenance phase which has become one of the most important objects that have to be managed. Since the general management method focused on each separated phase, it has accompanied many problems such as increases of the cost and duration, and loss of productivity. To solve these problems, it is necessa교 to have a new management method based on supply chain management. Thus this research analysed the processes of stick system, semi-unit system, unit system, and panel system classified by the type of the curtain wall, and suggested proper methods of application of SCM concept to each type of curtain wall construction.

  • PDF

THE DEVELOPMENT OF A CURTAIN WALL INSTALLATION ROBOT THROUGH THE ANALYSIS OF EXISTING CONSTRUCTION PROCESSES

  • Seung-Nam Yu ;Chong-Ho Choi ;Seung-Yel Lee;Chang-Soo Han
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.520-526
    • /
    • 2005
  • Automation in construction has been restricted to special classes of tasks. Curtain walls can be handled like standard construction materials; they are heavy but breakable, and are large but require precise installation. These characteristics make the installation of curtain walls ideal for robotic automation. There are two methods for developing construction robots: The first is approving the robot performance and applying it to the current construction methods. The second is admitting the limitation of the current robot technology and trying to optimize the current method of construction to apply the robot system. In this study, we derived the performance requirements of a curtain wall-installation robot. We also tested this robot at a real construction site and evaluated its performance. Finally, the results were analyzed, and we proposed additional research.

  • PDF

Economic Evaluation of Absorption Curtain Wall Sleeve with Relative Storey Displacement (층간변위 흡수형 커튼월 슬리브의 경제성 평가)

  • Hong, Sang-Hun;You, Nam-Gyu;Seo, Eun-Seok;Kim, Hae-Na;Kim, Bong-Joo;Jung, Ui-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.163-164
    • /
    • 2019
  • Curtain wall is constructed in various forms and designs by forming the exterior walls of a building, and refers to non-bearing walls that divide the exterior and interior spaces of a building. Curtain walls require not only wind pressure, but also waterproof, insulation, insulation, and durability, as well as the effects of recent frequent earthquakes. Studies on the sleeve used to connect the vertical member mullions in the process of high-rise curtain walls are insufficient. In this study, sleeves connecting curtain wall mullions were developed to absorb external displacement, and the purpose of this study was to evaluate economic feasibility through comparison with existing construction methods.

  • PDF

A Study on the Condensation Performance of The Curtain-walls (커튼월 결로 성능평가에 관한 연구)

  • Lee, Sang-Jin;Ock, Jong-Ho;Kim, Sung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.808-812
    • /
    • 2008
  • Recently, the buildings have been likely to shape Super Tall trend. Therefore, the exterior parts of the buildings come to be changed. Instead of early heavy wall structure, it is changed to light wall concept of curtain wall system. However, the curtain wall system causes lots of loads due to the external surrounding factors of building. In particular, due to the densely built-up condition in Korea, the generation of dew condensation is getting severer Since there has been no standardized process that reviews this generation of dew condensation, it is very urgent for us to prepare the reviewing process for the dew condensation for construction business managers. The purpose of this study is to assess dew condensation function of the curtain wall and provide the basic data for the provision of the future dew condensation review process by comparing and analyzing the range of generation of dew condensation as well as temperature distribution according to the change of relative humidity at the identical temperature by selecting the Unitized system and Stick system which are the representative types of curtain wall system.

  • PDF

A Study on the Development of the Structural Performance Evaluation Manual of the Skyscrapers Curtain Wall Systems for Construction Managers (초고층건축 알루미늄커튼월 구조설계검토 프로세스와 매뉴얼 개발에 관한 연구: 멀리언과 트랜섬을 중심으로)

  • Cho, Ye-Won;Lee, Min-Cheol;Ock, Jong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.92-101
    • /
    • 2009
  • The purpose of this study was to develop the curtain-wall structure design evaluation manual that can easily examine the curtain-wall structural members (Mullion and Transom) stability from the position of the construction managers. Through analyzing the structural design reports in the previous studies and interview with industry experts, the curtain-wall structural member design process was elicited. The manual, which consists of Microsoft Excel-based work sheet and its manual, was applied to a real curtain-wall design project to make sure its usability. A workshop with three curtain-wall experts and three construction managers was conducted to identify pros and cons of the manual, thereby enhancing its applicability in the future.

A Study on BIM Implementation Process Model through Importing Vertex Coordinate Data for Customized Curtain Wall Panel - Focusing on importing Vertex Coordinate data to Revit from Rhino - (맞춤형 커튼월 패널의 꼭짓점 좌표데이터 전이를 통한 BIM 형태 구축 프로세스 모델 연구 - 라이노에서 레빗으로의 좌표데이터 전이를 중심으로 -)

  • Ko, Sung Hak
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.11
    • /
    • pp.69-78
    • /
    • 2019
  • The purpose of this study is to propose a modeling methodology through the exchange of coordinate data of a three-dimensional custom curtain wall panel between Rhino and Revit, and to examine the validity of the model implemented in the drawing. Although the modeling means and method are different, a fundamental principle is that all three-dimensional modeling begins by defining the position of the points, the most primitive element of geometry, in the XYZ coordinate space. For the BIM modeling methodology proposal based on this geometry basic concept, the functions and characteristics associated with the points of Rhino and Revit programs are identified, and then BIM implementation process model is organized and systemized through the setting of the interoperability process algorithm. The BIM implementation process model proposed in this study is (1) Modeling and panelizing surface into individual panels using Rhino and Grasshopper; (2) Extraction of vertex coordinate data from individual panels and create CSV file; (3) Curtain wall modeling through Adaptive Component Family in Revit and (4) Automatic creation of Revit curtain wall panels through API. The proposed process model is expected to help reduce design errors and improve component and construction quality by automatically converting general elements into architectural meaningful information, automating a set of processes that build them into BIM data, and enabling consistent and integrated design management.