• Title/Summary/Keyword: Critical path method

Search Result 222, Processing Time 0.024 seconds

Determination of Optimum Threshold Value for Weak Signal Detection by LOD Method (LOD방법을 이용한 미소신호 검출의 최적 임계치 결정)

  • 이재환;신승호;진용옥
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.10 no.3
    • /
    • pp.123-129
    • /
    • 1985
  • This paper describes the determination of threshold value in order to determine the presence of absence of weak signal with SNR of 0 dB in 100kHz bandwidth. As a detection method, it has been used a recent LOC structure fitting for detecting weak signal in stead of a conventional method like Neyman-Peason crtical criterion. The signal for detection is the OOK modulation signal used in data and morse code transmission. The non-Gaussian noise similar to Laplacian type has been chosen in transmission path. As a result of experiment, comparing probability of detection by one critical point with that by two critical points with fixing as arbitrary false alarm probability, we have found that method has been shown to be better than the conventional method.

  • PDF

An Optimal Scheduling Method Using Probability on the Estimation of Construction Duration (확률적 공기산정에 의한 공정계획 합리화 방안)

  • Kim Sang-Joong;Lee Jae-Soeb
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.72-79
    • /
    • 2004
  • Critical Path-based project management has been applied to the construction projects with a goal of delivering projects within original costs and time estimates. These current project management methods, rarely make early finishes of construction Projects. In addition, current practices on time management seems not to take advantages of early finishes concepts due to student syndrome and Parkinson's Law, This research study applied the Theory of Constraints(n) in the estimation of construction project duration. While the TOC includes variety of management techniques, in this study, it refers to critical chain that has been used to develop the specific management technique in scheduling. The concept of critical chain is applied to this study to solve the problems associated with the current scheduling method. The efforts focus to solve the p개blems associated with current construction project scheduling methods by adopting both stochastic estimation technique and the concept of schedule buffer,

Stochastic Time-Cost Tradeoff Using Genetic Algorithm

  • Lee, Hyung-Guk;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.114-116
    • /
    • 2015
  • This paper presents a Stochastic Time-Cost Tradeoff analysis system (STCT) that identifies optimal construction methods for activities, hence reducing the project completion time and cost simultaneously. It makes use of schedule information obtained from critical path method (CPM), applies alternative construction methods data obtained from estimators to respective activities, computes an optimal set of genetic algorithm (GA) parameters, executes simulation based GA experiments, and identifies near optimal solution(s). A test case verifies the usability of STCT.

  • PDF

Path Analysis of Performance of Multidrug-Resistant Organisms Management Guidelines among Intensive Care Unit Nurses : With Focus on the Theory of Planned Behavior and Patient Safety Culture (중환자실간호사의 다제내성균 감염관리지침 수행에 영향을 미치는 요인에 관한 경로 분석 ; 계획된 행위이론과 환자안전문화를 중심으로)

  • Gu, Ji Eun;Ha, Yi Kyung;Hwang, Su Ho;Gong, Kyung Hee
    • Journal of Korean Critical Care Nursing
    • /
    • v.11 no.1
    • /
    • pp.89-100
    • /
    • 2018
  • Purpose : The purpose of this study was to analyze factors influencing the adherence to guidelines for intensive care unit (ICU) nurses to control infections due to multidrug-resistant organisms (MDRO). Method : Participants were 194 ICU nurses at 3 university hospitals. Questions for the survey inquired about attitude, subjective norms, perception of patient safety culture to carry out MDRO management guidelines, perceived behavior control (PBC), and intention, based on the theory of planned behavior. Path analysis were utilized. Results : The path analysis presented that PBC, perception of patient safety culture, and intent had a direct effect on MDRO management guidelines. Attitude towards following the manual did not have any correlation. The hypothetical model based on the theory of planned behavior was revealed as applicable; the degree of the variance in explaining adherence to the manual was 23 %, and the variance in explaining intention to fulfill the manual was 33 %. Conclusion : The results of this study suggest that we should develop a program to improve PBC to increase adherence to MDRO management guidelines. ICU nurses' perceptions of patient safety culture should also be surveyed.

해외건설공사 수행절차(6) - 시공단계(施工段階)

  • 해외건설협회
    • 월간 기계설비
    • /
    • no.11 s.220
    • /
    • pp.44-47
    • /
    • 2008
  • 많은 난관을 극복하고 조기착공에 성공한 후에, 우선적으로 고려할 사항은 주공정(Crtical Path) 을 관리하는 것이다. 주공정(critical Path)의 초기 작업에 필요한 자재, 장비, 인원의 준비를 재점검하고 하도급추진을 하는 한편, 계약서상의 요구조건, 승인사항에 미흡한 점이 없는지를 검토하고 보완한다. 계약서상의 요구사항을 미비하거나 무시했을 경우, 반드시 그에 상응하는 경제적 대가를 치루어야 한다는 것을 명심해야 한다. 시공을 하기 위해서는 자재승인 후 작업도면(Working Drawing/ Construction Drawing/ Shop Drawing)의 승인을 받고, 작업방법(Method Statement)을 제출하고, 설명화 Presentation) 및 시험시공(Demonstration 또는 Mockup)을 거쳐 감리자의 시공허락을 받아야 하며 각종 Test를 통해 품질관리를 실행해야 한다. 시공지는 시방서에서 요구하는 품질이 보장되는 범위 내에서, 최대한 공기를 단축할 수 있도록 공사초기부터 노력을 해야 하며, 공사의 모든 과정에서 항상 claim 여부, 공기내 준공, 하자 Zero, 최단 시일 내에 최대의 기성취하에 역점을 두고, 이에 장애요인을 해결하는 것으로 공사를 진행해야 한다.

  • PDF

INVESTIGATION ON PREDICTION OF FORMING LIMIT FOR COLD UPSETTING BY UTILIZING ENERGY FRACTURE CRITERION

  • Lee Rong-Shean;Wang Shui-To;Chen Jih-Hsing
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2003.10b
    • /
    • pp.22-25
    • /
    • 2003
  • The forming limits are studied for cold upsetting of high strength aluminium alloy in the present paper. Different geometry ratio and frictional conditions are investigated in the forgeability test to evaluate the forming limits and also to obtain the various strain paths. The critical fracture value can be obtained by integrating along the strain path till free surface crack initiation. To predict the damage evolution of cold upsetting, the computer-aided evaluation of forming limits is obtained by using the finite-element software DEFORM-3D and the modified Cockcroft-Latham criterion. The predicted theoretical limit strains agree quite well with the experimental results.

  • PDF

Capacities and Failure Modes of Transfer Girders in the Upper-Wall and Lower-Frame Structures having different Detailing (주상복합구조의 전이보 상세에 따른 성능과 파괴모드)

  • 이한선;김상연;고동우;권기혁;김민수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10b
    • /
    • pp.845-850
    • /
    • 2000
  • This paper presents the results of tests performed on the transfer girders which have been generally used between upper walls and lower frames in the hybrid structures. The 8 specimens were designed using (1) ACI method, (2) strut-tie model, and (3) X-type shear reinforcement cage. The capacities of the specimens are in general larger than the design values except the one designed according to strut-tie model. The reason for this difference seems to be due to the arbitrary allocation of transferred shear force to the path of direct compression strut and the path of indirect strut and tie. The failure modes turn out toe be (1) shear failure at critical shear zone, (2) compressive concrete crushing in the diagonal strut in the shear zone of transfer girder, and (3) compressive concrete crushing in the corner of upper wall.

The Optimization of Vehicle Engine Mounting System Using DFSS(design for six sigma) Technique (DFSS기법을 이용한 차량 엔진마운팅 시스템 최적화)

  • Park, Un-Hwan;Song, Yoon-Chul
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.20 no.3
    • /
    • pp.235-241
    • /
    • 2010
  • Engine Mount plays an important role which supports engine, isolates vibration from engine and blocks the vibration from road. Development of engine mount for NVH costs great a deal. So, the cost of development being reduced, the way developed effectively engine mount using DFSS technique is proposed in this paper. CTQ(critical to quality) is vibration and parameter is dynamic stiffness of mounts. The core parameters are selected with TPA(transfer path analysis) technique. It uses design of experiments(DOE) or Taguchi Methods to optimize parameter values and reduce variation. And then, this paper shows the result of improvement for vibration in the developing vehicle.

A reinforcement learning-based network path planning scheme for SDN in multi-access edge computing

  • MinJung Kim;Ducsun Lim
    • International journal of advanced smart convergence
    • /
    • v.13 no.2
    • /
    • pp.16-24
    • /
    • 2024
  • With an increase in the relevance of next-generation integrated networking environments, the need to effectively utilize advanced networking techniques also increases. Specifically, integrating Software-Defined Networking (SDN) with Multi-access Edge Computing (MEC) is critical for enhancing network flexibility and addressing challenges such as security vulnerabilities and complex network management. SDN enhances operational flexibility by separating the control and data planes, introducing management complexities. This paper proposes a reinforcement learning-based network path optimization strategy within SDN environments to maximize performance, minimize latency, and optimize resource usage in MEC settings. The proposed Enhanced Proximal Policy Optimization (PPO)-based scheme effectively selects optimal routing paths in dynamic conditions, reducing average delay times to about 60 ms and lowering energy consumption. As the proposed method outperforms conventional schemes, it poses significant practical applications.

A Localization Scheme Using Mobile Robot in Wireless Sensor Networks (무선 센서 네트워크에서 이동성 로봇을 이용한 센서 위치 인식 기법에 관한 연구)

  • Kim, Woo-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.10 no.2
    • /
    • pp.105-113
    • /
    • 2007
  • Accurate and low-cost sensor localization is a critical requirement for the deployment of wireless sensor networks in a wide variety of application. Sensor position is used for its data to be meaningful and for energy efficient data routing algorithm especially geographic routing. The previous works for sensor localization utilize global positioning system(GPS) or estimate unknown-location nodes position with help of some small reference nodes which know their position previously. However, the traditional localization techniques are not well suited in the senor network for the cost of sensors is too high. In this paper, we propose the sensor localization method with a mobile robot, which knows its position, moves through the sensing field along pre-scheduled path and gives position information to the unknown-location nodes through wireless channel to estimate their position. We suggest using the sensor position estimation method and an efficient mobility path model. To validate our method, we carried out a computer simulation, and observed that our technique achieved sensor localization more accurately and efficiently than the conventional one.

  • PDF