• Title/Summary/Keyword: Crane automation

Search Result 80, Processing Time 0.022 seconds

Implementation of Efficient Container Number Recognition System at Automatic Transfer Crane in Container Terminal Yard (항만 야드 자동화크레인(ATC)에서 효율적인 컨테이너번호 인식시스템 개발)

  • Hong, Dong-Hee
    • Journal of the Korea Society of Computer and Information
    • /
    • v.15 no.9
    • /
    • pp.57-65
    • /
    • 2010
  • This paper describes the method of efficient container number recognition in colored container image with number plate at ATC(Automatic Transfer Crane) in container terminal yard. At the Sinseondae terminal gate in Busan, the container number recognition system is installed by "intelligent port-logistics system technology development", that is government research and development project. It is the method that it sets up the tunnel structure inside camera on the gate and it recognizes the container number in order to recognize the export container cargo automatically. However, as the automation equipment is introduced to the container terminal and the unmanned of a task is gradually accomplished, the container number recognition system for the confirmation of the object of work is required at ATC in container terminal yard. Therefore, the container number recognition system fitted for it is necessary for ATC in container terminal yard in which there are many intrusive of the character recognition through image including a sunlight, rain, snow, shadow, and etc. unlike the gate. In this paper, hardware components of the camera, illumination, and sensor lamp were altered and software elements of an algorithm were changed. that is, the difference of the brightness of the surrounding environment, and etc. were regulated for recognize a container number. Through this, a shadow problem, and etc. that it is thickly below hung with the sunlight or the cargo equipment were solved and the recognition time was shortened and the recognition rate was raised.

Development of a Real-time Lifting-path Tracking System of a Tower-crane for Steel Members based on an Integrated Wireless RF Modem and GPS System (무선 RF모뎀과 GPS를 통합한 타워크레인의 철골부재의 실시간 양중위치 추적시스템 개발)

  • Yun, Seok-Heon;Lee, Ghang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.65-70
    • /
    • 2010
  • Steel frame construction in high places entails many risk factors. In order to improve the safety and productivity of steel frame construction, a project to develop a robotic tower-crane has been undertaken. As the first step, a real-time lifting-path tracking system is being developed. In a previous study, a laser-based tracking system was proposed. While a laser-based tracking system requires at least three laser sensors to detect the x, y, z coordinates of a lifted steel member, a GPS-based system has an advantage over the laser-based system, in that the x, y, z coordinates of a lifted steel member can be detected by a single GPS sensor. To improve the accuracy, arelative positioning method using two GPS sensors was proposed in a previous study. This paper reports an improved GPS-based lifting-path tracking system of a tower crane based on an integrated RF modem and GPS system. The results showedthat the RF modem could successfully send the identifier information to a server a maximum distance of 1 km away from the lifted steel beam, and the lifting path information of each beam captured by the GPS-based tracking system was successfully saved together. Also, byusing an improved algorithm for the GPS relative positioning method, the deviation was reduced to 0.61 m on average.

Development of remote drum grappling device for Automation (물류자동화를 위한 드럼원격 취급장치 개발에 관한 연구)

  • 오승철;윤지섭
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.04a
    • /
    • pp.739-742
    • /
    • 1997
  • A remote drum grappling device coupled to the anti-swing crane has been developed by KAERI to cope with problems involved in manually treating low level waste drums. In order for this grappling device to be operated effectively, multi-sensors including CCD camera were employed. As an activity representation scheme of the device, Extended State Machine (ESM) was used to descibe its operation sequences. The performance testing of the device was conducted successfully, and consequently its application could be extendable to industrial operation environment.

  • PDF

Characteristics Evaluation of Spindle Thermal Displacement with kinds of Lubrication Oil (AMESim를 이용한 유압 굴삭기용 Main Control Valve의 해석에 관한 연구)

  • 임태형;최종환;양순용;이병룡;안경관
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2003.04a
    • /
    • pp.105-110
    • /
    • 2003
  • The hydraulic excavator has been a popular research object for automation because of its multi-workings and economic efficiency. When it works crane tasks, most of disasters happen. The objective of this paper is to design each components and to construct boom, arm, bucket circuit. These models modeled with AMESim show us change of variables and behavior of excavator. Simulation model will be used for simulator of excavator.

  • PDF

Simulation Program for Advanced RMQC (신형 RMQC 시뮬레이션 프로그램)

  • Hwang, Suk-Hwan;Choi, Jae-Seung
    • Proceedings of the KSME Conference
    • /
    • 2004.04a
    • /
    • pp.1109-1113
    • /
    • 2004
  • RMQC, rail mounted quay crane, lifts and moves large container by means of hoist and trolley motion on the dock. Our company is trying to develop advanced RMQC applying the concepts of elevator hoist and container conveyer for the automation and high efficiency in handling the boxes. Prior to the development of new products, it is necessary to check the capacity of the new systems using simulation program. The program simulates container-handling rates and gives some design factors for the new-type cranes.

  • PDF

On the Study of the Production Improvement of Container Cranes (컨테이너 크레인의 생산성 향상에 관한 연구)

  • Son, J.G.
    • Journal of Korean Port Research
    • /
    • v.12 no.1
    • /
    • pp.113-118
    • /
    • 1998
  • The Container crane is mainly used in the harbor. But in spite of this wide use, it is a fact that there are still areas for automation, concerning the operator and the control system. If the encoding function is enhanced, then control effect can be increased to some extent. Since the distance from the hoist to the trolley cam be measured, the moving distance from the loading and unloading can be minimized. If this is applied to the real system, hazard elements can be eliminated and in given time since more unloading can be done, congestion can be reduced.

  • PDF

Constructibility Analysis of Self-supported Steel Joint for Automated Construction System (건축물 시공 자동화 시스템을 위한 자립형 철골 접합부의 시공성 분석)

  • Kim, Dong-Keon;Yang, Sung-Woo;Kim, Tae-Hoon;Shin, Yoon-Seok;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.1-4
    • /
    • 2009
  • Construction automation and robotics are being introduced as an efficient alternative to overcome troubles caused by lack of skilled labors. To accomplish effective automated construction system, design for automation(DFA) should be performed in parallel with the development of core technologies such as control and sensing of robots. In Korea, the development of robotic crane-based construction automation(RCA) system is progressing, and the research group has recently developed newly designed steel joint to improve the efficiency of the system. However, performance of the new system should be examined prior to its application on construction sites. Therefore, This study analyzed performance of the new steel frame focused on its constructibility by carrying out mock-up test. As a result, the steel frame satisfied the standards of allowable stress and deflection. It also enables to reduce the time for installation.

  • PDF

Analysis of Conceptual Models and State-of-the-Art Technologies for the Automation of Telescoping Work in Horizontal Tower Cranes (수평형 타워크레인 텔레스코핑 작업의 자동화를 위한 개념 모델 및 요소기술 분석)

  • Lee, Sang-Ho;Kim, Young-Suk;Lee, Jeong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.705-717
    • /
    • 2011
  • The number of horizontal tower cranes, major hoisting machineries for lifting approximately 50% of entire materials in construction projects, is rapidly increasing, but a number of accidents related to the tower cranes are being continuously occurred in construction sites as well. In particular, telescoping works in the horizontal tower cranes have showed the greatest safety concerns such as falls and collapses. It is due to the fact that tasks inserting a new mast in the space made after raising telescoping cage by fluid pressure and ascending it to the required height in the telescoping works include a series of dangerous factors in safety aspects, and might cause very serious and unexpected accidents in construction sites. The primary objective of this research is to propose two conceptual models for automating the telescoping work in horizontal tower crane and conduct their technical feasibility analyses. In this study, a design concept, a position control system using hydraulic cylinders is suggested as a better alternative for automating the telescoping work. Its potential safety improvement rate compared to the conventional method is also analyzed and presented in this study.

Optimal Design of Quadrilateral Typed-Overboarding Mechanism for Drop/Lift Automation of Towed Object (예인체의 투하 및 인양 자동화를 위한 사변형 Overboarding Mechanism의 최적설계)

  • Kang, Seok Jeong;Chung, Won Jee;Park, Seong Hak;Choi, Jong Kap;Kim, Hyo Gon;Lee, Jun Ku
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.26 no.1
    • /
    • pp.74-81
    • /
    • 2017
  • A crane is typically used as a means to lift and load equipment or materials. A surface vessel uses a towed object for underwater activity. Such a mechanism for dropping and lifting of equipment is necessary, and is called an overboarding unit. The present study is focused on the overboarding unit used for a crane structure. This paper deals with new overboarding mechanism design and GA-based $MATLAB^{(R)}$ optimization. By using a quadrilateral link mechanism, it is possible to set the constraint function for optimizing the GA method. The optimization with $MATLAB^{(R)}$ is followed by the $SolidWorks^{(R)}$ simulation and verification. When applying the proposed mechanism, the operator is expected to have a big advantage in safety and efficiency of operations. Furthermore, the technology developed in this study will be helpful in similar circumstances and in the proposed mechanism.

Design and Application of Self-Lifting & Slewing Multi-Cranes Platform

  • Kun Zhang;Kaiqiang Wang;Bo Chen;Qing Sun;Hui Yang;Xin Ba;Jinming Zhao
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.103-114
    • /
    • 2022
  • Tower crane is of great importance in the construction of high rise buildings. A self-lifting & slewing multi-cranes platform (referred to as crane slewing platform) was developed to optimize the configuration of tower cranes, as well as solve the problems of cooperative operation conflict between multiple cranes and other construction equipment and their respective climbing and occupying of construction period. The design and test of the slewing platform was introduced. By applying the slewing platform in the construction of Chengdu Greenland Center super high rise building project, some key technologies such as the configuration of cranes, the installation, construction and lifting of the slewing platform are implemented and validated. Up to now, the slewing platform has been safely lifted up 98 times in Chengdu Greenland Center project construction, and achieved good social and economic benefits.