Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

SUSTAINABLE AND ENVIRONMENTALLY RESPONSIBLE DESIGN USING BIM: A CASE STUDY OF A RESIDENTIAL PROJECT

  • Hyunjoo Kim;Kwok K. Tam
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.84-87
    • /
    • 2011
  • This paper describes the application of the three sustainable design elements for a residential project in the county of Los Angeles, USA. The first design element is the green building design in which a base model will be created using the Autodesk REVIT MEP program for the analysis by Building Information Modeling (BIM) for the energy analysis modeling process to determine the energy savings for each of the recommended design features. The second element is the Low Impact Development design for the site design using specialty material and structural devices for infiltration and recycling of storm water for reuse. The third element is the application of drought tolerant plant species in the site's landscaping design as a means to conserve water. The construction cost associated with the application of these three elements will be reviewed to determine the practicality and effectiveness of this sustainable design approach.

  • PDF

A Study on the Power Demand using Program Control Method in Office Building (프로그램제어방식을 이용한 건물 전력수요 관리기법)

  • Choi, Do-Hyuk;Kim, Se-Dong;Ryu, Seung-Ki;Song, Eon-Bin
    • Proceedings of the KIEE Conference
    • /
    • 1994.07a
    • /
    • pp.106-109
    • /
    • 1994
  • The object of this study is to propose the simplified power demand control system which is appliable to existing buildings or new buildings. Through the technical survey and power demand analysis in office buildings, the electric facilities which can be controlled are selected. Power demand control program can be controlled the electric facilities in order, and displayed the facility operation state. The proposed power demand control system is cost-effective and flexibly adoptable in system upgrade or retrofit.

  • PDF

Comparative Study on Similarity Measurement Methods in CBR Cost Estimation

  • Ahn, Joseph;Park, Moonseo;Lee, Hyun-Soo;Ahn, Sung Jin;Ji, Sae-Hyun;Kim, Sooyoung;Song, Kwonsik;Lee, Jeong Hoon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.597-598
    • /
    • 2015
  • In order to improve the reliability of cost estimation results using CBR, there has been a continuous issue on similarity measurement to accurately compute the distance among attributes and cases to retrieve the most similar singular or plural cases. However, these existing similarity measures have limitations in taking the covariance among attributes into consideration and reflecting the effects of covariance in computation of distances among attributes. To deal with this challenging issue, this research examines the weighted Mahalanobis distance based similarity measure applied to CBR cost estimation and carries out the comparative study on the existing distance measurement methods of CBR. To validate the suggest CBR cost model, leave-one-out cross validation (LOOCV) using two different sets of simulation data are carried out. Consequently, this research is expected to provide an analysis of covariance effects in similarity measurement and a basis for further research on the fundamentals of case retrieval.

  • PDF

A Study on tile Cross Section Optimization of P.C Box-Girder Bridge (P.C 박스거더교의 횡단면 최적설계에 관한 연구)

  • 방명석;김일곤;조현준
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1990.10a
    • /
    • pp.101-104
    • /
    • 1990
  • The program which could determine cross-sectional dimensions of the box girder bridge at tile stage of preliminary design was developed using the optimal technique in this study. It could minimize the cost and time required in the design of box girder bridges and the construction with the prestressed precast segmental method. Objective cost function consisted of four independent variables such as widths and depth of the cross-section. The Nelder-Mead method was used to solve the nonconstrained nonlinear problem like this.

  • PDF

A Study on the Economical Design of Apartment House (경제적인 아파트 설계에 대한 연구)

  • 강문영
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.04a
    • /
    • pp.378-384
    • /
    • 1995
  • This paper descrides on the economical design of apartment house. * The optimal problems are made by considering the objective function which minimize the construction cost of frame. * The object functions are taken as the codfficient equations of the cost function for a unit area. * Constraints are the design limits defined by the ultimate flexural strength, the ultimate shear strength. the minimum thickness, and the ratio of steel in accordance with ACI 318-89 Code. * Optimization is achieved by optimum nonlinear GINO(General interactive Optimizer)program. In design examples, it is compared with the optimum design results of apartment house and underground parking lot for structural systems.

  • PDF

Investigating delay factors in construction industry: A Korean perspective

  • Acharya, Nirmal Kumar;Im, Hae-Man;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.177-190
    • /
    • 2006
  • Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.

Performance assessment of advanced hollow RC bridge column sections

  • Kim, T.H.;Kim, H.Y.;Lee, S.H.;Lee, J.H.;Shin, H.M.
    • Computers and Concrete
    • /
    • v.16 no.5
    • /
    • pp.703-722
    • /
    • 2015
  • This study investigates the performance of advanced hollow reinforced concrete (RC) bridge column sections with triangular reinforcement details. Hollow column sections are based on economic considerations of cost savings associated with reduced material and design moments, as against increased construction complexity, and hence increased labor costs. The proposed innovative reinforcement details are economically feasible and rational, and facilitate shorter construction periods. We tested a model of advanced hollow column sections under quasi-static monotonic loading. The results showed that the proposed triangular reinforcement details were equal to the existing reinforcement details, in terms of the required performance. We used a computer program, Reinforced Concrete Analysis in Higher Evaluation System Technology (RCAHEST), for analysis of the RC structures; and adopted a modified lateral confining effect model for the advanced hollow bridge column sections. Our study documents the testing of hollow RC bridge column sections with innovative reinforcement details, and presents conclusions based on the experimental and analytical findings. Additional full-scale experimental research is needed to refine and confirm the design details, especially for the actual detailing employed in the field.

Development of Planning Method for Double-Tracking of Single Track Railroad based on the Intelligent Rail Alignment Planning Program (ei-Rail) (지능형철도선형계획 프로그램(ei-Rail) 기반의 단선철도 복선화 계획 기술개발)

  • Kim, Jeong Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.837-842
    • /
    • 2022
  • The "Intelligent Railroad Alignment Design Program (ei-Rail) developed in 2013 has been adopted in the planning and the evaluation/validation of design results of oversea railroad construction projects. Target countries of Korean railroad industries requires the operating speed increase with alignment improvement and the double tracking of prevailing single track railroads as well as new railroad construction. This study is to develop an additional module for double tracking project of prevailing single track railroads in the ei-Rail. The developed method is based on the geometrics of prevailing railroad, and the definition of planned project determines the project cost based on the unit cost by work type, and provides the draft design of double track. The module was validated with a oversea case. It is then expected for oversea railroad double tracking project more efficiently in planning and the evaluation of design results.

RISK ANALYSIS FOR INDUSTRIAL PROJECT IN CONSTRUCTION PHASE: A MONTE-CARLO SIMULATION APPROACH

  • Soo-Yong Kim;Luu Truong Van;Han-Ki Ha;Nguyen Quoc Tuan
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.130-139
    • /
    • 2007
  • This paper presents a study on risk analysis in terms of contractor's costs in construction phase in which Crystal ball (software of Decisioneering, UK) has been utilized as a main tool. To realize it, a questionnaire survey has been carried out to identify the dominant factors that strongly influence contractor costs in Vietnam. Based on results of questionnaire investigation, the survey identified three factors which were duration of each construction task, costs of reinforcing steel, and cement. Then a spreadsheet model was created in order to analyze risks. The study also indicates that the cost of reinforcing steel and cement are the cause of risks for contractors. According to the suggested model, contractors may foresee the probability of completion within the approved budget, and the possibility of earning in accordance with owner's payment conditions.

  • PDF