• Title/Summary/Keyword: Cost-of-construction Program

Search Result 259, Processing Time 0.028 seconds

A Prediction of N-value Using Artificial Neural Network (인공신경망을 이용한 N치 예측)

  • Kim, Kwang Myung;Park, Hyoung June;Goo, Tae Hun;Kim, Hyung Chan
    • The Journal of Engineering Geology
    • /
    • v.30 no.4
    • /
    • pp.457-468
    • /
    • 2020
  • Problems arising during pile design works for plant construction, civil and architecture work are mostly come from uncertainty of geotechnical characteristics. In particular, obtaining the N-value measured through the Standard Penetration Test (SPT) is the most important data. However, it is difficult to obtain N-value by drilling investigation throughout the all target area. There are many constraints such as licensing, time, cost, equipment access and residential complaints etc. it is impossible to obtain geotechnical characteristics through drilling investigation within a short bidding period in overseas. The geotechnical characteristics at non-drilling investigation points are usually determined by the engineer's empirical judgment, which can leads to errors in pile design and quantity calculation causing construction delay and cost increase. It would be possible to overcome this problem if N-value could be predicted at the non-drilling investigation points using limited minimum drilling investigation data. This study was conducted to predicted the N-value using an Artificial Neural Network (ANN) which one of the Artificial intelligence (AI) method. An Artificial Neural Network treats a limited amount of geotechnical characteristics as a biological logic process, providing more reliable results for input variables. The purpose of this study is to predict N-value at the non-drilling investigation points through patterns which is studied by multi-layer perceptron and error back-propagation algorithms using the minimum geotechnical data. It has been reviewed the reliability of the values that predicted by AI method compared to the measured values, and we were able to confirm the high reliability as a result. To solving geotechnical uncertainty, we will perform sensitivity analysis of input variables to increase learning effect in next steps and it may need some technical update of program. We hope that our study will be helpful to design works in the future.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

An Optimizing Simulation for Designing the Numbers of Electric Train Car (전동열차 편성량수 설계를 위한 최적화 시뮬레이션)

  • Kim, Ick-Hee;Yun, Dong-Hee;Kum, Ki-Jung;Lee, Sang-Myoung
    • Journal of Korean Society of Transportation
    • /
    • v.30 no.3
    • /
    • pp.95-106
    • /
    • 2012
  • The railway service in the Seoul metropolitan area is facing variety of l changes such as extension of service coverage, new construction, and introduction of express service which in turn causes changes on demands. The demand affects train operation characteristics (frequency of service, train formation) as well as on the congestion rate which is one of the major evaluation index in metropolitan area user service. For the efficient operation of the train, the relationship among the minimization of fleet number, operating cost, and service level has been analyzed. Using the Powersim, which is a system dynamics (System Dynamics) simulation program for realizing optimized simulation for train-formation, this paper identified that some stations of Gyeong-bu line exceeded limit congestion rate(150%) of a fleet already that means it is best to maintain current condition of the line; however, the Gyeong-in line and the Gwa-chon line showed no excess of the limit congestion rate so that it is possible to reduce 2-4 fleets of train for efficient operation. In addition, in case of Jang-hang line between Cheon-an and Sin-chang, a train consisting of 10 fleets provides services which is same formation of train for Gyeong-bu line. This study proved that the congestion rate will not rise greatly with only 4 fleets of a train for the service in Jang-hang line, and it is considered that a study for shuttle service between Cheon-an and Sin-chang is necessary.

ANALYSIS OF THE TRANSPORTATION LOGISTICS FOR SPENT NUCLEAR FUEL IN KOREA

  • Lee, Hyo-Jik;Ko, Won-Il;Seo, Ki-Seok
    • Nuclear Engineering and Technology
    • /
    • v.42 no.5
    • /
    • pp.582-589
    • /
    • 2010
  • As a part of the back-end fuel cycle, transportation of spent nuclear fuel (SNF) from nuclear power plants (NPPs) to a fuel storage facility is very important in establishing a nuclear fuel cycle. In Korea, the accumulated amount of SNF in the NPP pools is troublesome since the temporary storage facilities at these NPP pools are expected to be full of SNF within ten years. Therefore, Korea cannot help but plan for the construction of an interim storage facility to solve this problem in the near future. Especially, a decision on several factors, such as where the interim storage facility should be located, how many casks a transport ship can carry at a time and how many casks are initially required, affect the configuration of the transportation system. In order to analyze the various possible candidate scenarios, we assumed four cases for the interim storage facility location, three cases for the load capacity that a transport ship can carry and two cases for the total amount of casks used for transportation. First, this study considered the currently accumulated amount of SNF in Korea, and the amount of SNF generated from NPPs until all NPPs are shut down. Then, how much SNF per year must be transported from the NPPs to an interim storage facility was calculated during an assumed transportation period. Second, 24 candidate transportation scenarios were constructed by a combination of the decision factors. To construct viable yearly transportation schedules for the selected 24 scenarios, we created a spreadsheet program named TranScenario, which was developed by using MS EXCEL. TranScenario can help schedulers input shipping routes and allocate transportation casks. Also, TranScenario provides information on the cask distribution in the NPPs and in the interim storage facility automatically, by displaying it in real time according to the shipping routes, cask types and cask numbers that the user generates. Once a yearly transportation schedule is established, TranScenario provides some statistical information, such as the voyage time, the availability of the interim storage facility, the number of transported casks sent from the NPPs, and the number of transported casks received at the interim storage facility. By using this information, users can verify and validate a yearly transportation schedule. In this way, the 24 candidate scenarios could be constructed easily. Finally, these 24 scenarios were compared in terms of their operation cost.

Design and Implementation of Asynchronous Memory for Pipelined Bus (파이프라인 방식의 버스를 위한 비 동기식 주 기억장치의 설계 및 구현)

  • Hahn, Woo-Jong;Kim, Soo-Won
    • Journal of the Korean Institute of Telematics and Electronics B
    • /
    • v.31B no.11
    • /
    • pp.45-52
    • /
    • 1994
  • In recent days low cost, high performance microprocessors have led to construction of medium scale shared memory multiprocessor systems with shared bus. Such multiprocessor systems are heavily influenced by the structures of memory systems and memory systems become more important factor in design space as microprocessors are getting faster. Even though local cache memories are very common for such systems, the latency on access to the shared memory limits throughput and scalability. There have been many researches on the memory structure for multiprocessor systems. In this paper, an asynchronous memory architecture is proposed to utilize the bandwith of system bus effectively as well as to provide flexibility of implementation. The effect of the proposed architecture if shown by simulation. We choose, as our model of the shared bus is HiPi+Bus which is designed by ETRI to meet the requirements of the High-Speed Midrange Computer System. The simulation is done by using Verilog hardware decription language. With this simulation, it is explored that the proposed asynchronous memory architecture keeps the utilization of system bus low enough to provide better throughput and scalibility. The implementation trade-offs are also described in this paper. The asynchronous memory is implemented and tested under the prototype testing environment by using test program. This intensive test has validated the operation of the proposed architecture.

  • PDF

A development of integrated water-quality measurement system (통합 수질계측 시스템 개발)

  • Yang, Keun-Ho
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.8 no.3
    • /
    • pp.211-216
    • /
    • 2007
  • The quality of tap water on the whole water-supply system, from a large filtration plant to a private faucet, has to be guaranteed the standards of drinking water. At this point in time, however, the supply process of the tap water has not been monitored and managed scientifically. The piped water, especially the most small-scale reservoirs(underground or overhead type) are always exposed to various contaminations and impurities. Recently monitoring systems of water-quality were spread on some large filtration plants or distributing reservoirs. In particular, the water quality monitoring method using the internet is adopted into some local government whose inhabitants can check up the water quality anytime and anywhere. The construction of this system that has to apply a large scale needs, and has a limitation on the small water-supply system, such as apartments, public facilities and small-scale underground or overhead reservoirs. In this work, we suggest the integration system of individual water-quality sensor modules that have a low price. By using the developed integration system and monitoring program operated on the internet, the system managers of reservoirs can monitor and manage water-quality characteristic values of drinking water in online. Since the proposed system was modularized, the system can be applied easily into various reservoirs with a low cost and regardless of its scale, small or large.

  • PDF

A development of submerged type multiprobe water-quality measuring instrument and remote monitoring system (침지형 다항목 수질계측기 및 원격 모니터링 시스템 개발)

  • Yang, Keun-Ho
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.10 no.3
    • /
    • pp.207-213
    • /
    • 2009
  • The quality of tap water on the whole water-supply system, from a large filtration plant to a private faucet, has to be guaranteed the standards of drinking water. At this point in time, however, the supply process of the tap water has not been monitored and managed scientifically. The piped water, especially the most small-scale reservoirs(underground or overhead type) are always exposed to various contaminations and impurities. Recently monitoring systems of water-quality were spread on some large filtration plants or distributing reservoirs. In particular, the water quality monitoring method using the internet is adopted into some local government whose inhabitants can check up the water quality anytime and anywhere. The construction of this system that has to apply a large scale needs, and has a limitation on the small water-supply system, such as apartments, public facilities and small-scale underground or overhead reservoirs. In this work, we suggest the integration system of individual water-quality sensor modules that have a low price. By using the developed integration system and online monitoring program operated on the internet, the system managers of reservoirs can monitor and manage water-quality characteristic values of drinking water in online. Since the proposed system was modularized, the system can be applied easily into various reservoirs with a low cost and regardless of its scale, small or large.

  • PDF

Requirement Analysis for Agricultural Meteorology Information Service Systems based on the Fourth Industrial Revolution Technologies (4차 산업혁명 기술에 기반한 농업 기상 정보 시스템의 요구도 분석)

  • Kim, Kwang Soo;Yoo, Byoung Hyun;Hyun, Shinwoo;Kang, DaeGyoon
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.21 no.3
    • /
    • pp.175-186
    • /
    • 2019
  • Efforts have been made to introduce the climate smart agriculture (CSA) for adaptation to future climate conditions, which would require collection and management of site specific meteorological data. The objectives of this study were to identify requirements for construction of agricultural meteorology information service system (AMISS) using technologies that lead to the fourth industrial revolution, e.g., internet of things (IoT), artificial intelligence, and cloud computing. The IoT sensors that require low cost and low operating current would be useful to organize wireless sensor network (WSN) for collection and analysis of weather measurement data, which would help assessment of productivity for an agricultural ecosystem. It would be recommended to extend the spatial extent of the WSN to a rural community, which would benefit a greater number of farms. It is preferred to create the big data for agricultural meteorology in order to produce and evaluate the site specific data in rural areas. The digital climate map can be improved using artificial intelligence such as deep neural networks. Furthermore, cloud computing and fog computing would help reduce costs and enhance the user experience of the AMISS. In addition, it would be advantageous to combine environmental data and farm management data, e.g., price data for the produce of interest. It would also be needed to develop a mobile application whose user interface could meet the needs of stakeholders. These fourth industrial revolution technologies would facilitate the development of the AMISS and wide application of the CSA.

Optimum Management Plan for Soil Contamination Facilities (특정토양오염관리대상시설의 최적 관리방안에 관한 연구)

  • Park, Jae-Soo;Kim, Ki-Ho;Kim, Hae-Keum;Choi, Sang-Il
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.45 no.2
    • /
    • pp.293-300
    • /
    • 2012
  • This study was to investigate the unsuitable rate of the storage facilities, the changes in corrosion process over time after installation according to the status, the time to install the facilities, years elapsed after facilities installation, inspection of methods and motivation, and so on, based on the results of the inspection at the petroleum storage facilities conducted by domestic soil-relate specialized agency to derive optimal management plans which meet the status of soil contamination facilities. The results showed that the facilities more than 5 years after the initial leak test at the time of the installation need to be inspected periodically by considering costs of leak test and remediation of polluted soil. The inspection period can be decided by cost and leak test methods showing discrepancies for the results obtained from individual test whether it was direct or indirect. To compensate these matters, we suggested that the direct inspection method on regular schedule is recommended. On the other hand, the inspection can be voluntarily completed to ease burden of the results by inspection or equivalent level to this inspection method. Also, it may need improved construction supervision and performance test system to minimize the occurrence of the nature defects in installing the facilities as well as the upgrade program for the facilities during intervals of inspection period.