• 제목/요약/키워드: Cost-distance Method

검색결과 395건 처리시간 0.03초

LCC 분석에 의한 상온 에너지수송용 흡수식 냉동기(STA)의 경제성 평가 (Life-Cycle Cost Analysis of Solution Transportation Absorption System)

  • 오민규;이봉진;홍희기;강용태
    • 설비공학논문집
    • /
    • 제16권6호
    • /
    • pp.506-513
    • /
    • 2004
  • The objective of this paper is to evaluate the economic performance of latent and sensible energy transportation systems. LCC (Life-Cycle Cost) analysis is a practical method and a guideline for evaluating the economic performance of considered systems during the Life-Cycle Period. By comparing the LCC of alternatives, The most ideal alternative is determined which has the lowest LCC. It is concluded that the cost of STA (Solution Transportation Absorption system) can be reduced by 67% to that of sensible energy transportation for study period with 10 km transportation distance.

유전자 알고리즘을 이용한 신뢰 통신망 최적화 (Optimizing Reliable Network using Genetic Algorithm)

  • 이학종;강주락;권기호
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 1999년도 추계종합학술대회 논문집
    • /
    • pp.452-455
    • /
    • 1999
  • Genetic algorithm is well known as the efficient algorithm which can solve a difficult problem. Network design considering reliability is NP-hard problem with cost, distance, and volume. Therefore genetic algorithm is considered as a good method for this problem. This paper suggests the reliable network which can be constructed with minimum cost using genetic algorithm and the rank method based on reliability for improving the performance. This method shows more excellent than existing method and confirms the result through simulation.

  • PDF

매개변수기법을 이용한 고속철도 노반공사의 개략공사비 예측모델 (Conceptual Cost Estimation Model Using by a Parametric Method for High-speed Railroad)

  • 이영주;장성용
    • 대한토목학회논문집
    • /
    • 제31권4D호
    • /
    • pp.595-601
    • /
    • 2011
  • 고속철도 기본계획단계에서 노반공사의 토공사 공사비 추정은 단위길이당 공사비(원/km)를 활용하고 있다. 이 단가는 과거자료를 기준으로 한 산술평균으로 오차가 클 수 있으며, 기본설계 단계 등 다음단계의 견적과 연계성이 부족한 단점이 있다. 본 연구는 철도연장에 토공사의 기술적 특성인 지질조건을 추가하는 매개변수 기반 개략공사비 산정모델을 제시한다. 데이터분석은 회귀분석법을 적용하였으며, 독립변수는 길이, 지질(토사, 풍화암, 연암, 경암) 구성 비율이고, 36개 공구 실적공사비를 참조하였다. 개발된 모델은 실적공사비와 비교한 결과 -0.4% ~ +31% 범위로 나타나, 전형적 범위인 -30% ~ +50% 이내이므로 유효한 것으로 판정한다. 본 모델은 공사비 영향의 주요요인인 길이에 기술적 특성인 지질요건을 추가함으로써 공사비 산정결과의 신뢰도 향상을 꾀함으로써 단계별 효과적 총사업비관리, 재정지출 감소 및 사업의 경제성 확보에 기여할 수 있을 것으로 기대된다.

기피비용과 수송비용을 고려한 기피시설 입지문제 (An unwanted facility location problem with negative influence cost and transportation cost)

  • 양병학
    • 대한안전경영과학회지
    • /
    • 제15권1호
    • /
    • pp.77-85
    • /
    • 2013
  • In the location science, environmental effect becomes a new main consideration for site selection. For the unwanted facility location selection, decision makers should consider the cost of resolving the environmental conflict. We introduced the negative influence cost for the facility which was inversely proportional to distance between the facility and residents. An unwanted facility location problem was suggested to minimize the sum of the negative influence cost and the transportation cost. The objective cost function was analyzed as nonlinear type and was neither convex nor concave. Three GRASP (Greedy Randomized adaptive Search Procedure) methods as like Random_GRASP, Epsilon_GRASP and GRID_GRASP were developed to solve the unwanted facility location problem. The Newton's method for nonlinear optimization problem was used for local search in GRASP. Experimental results showed that quality of solution of the GRID_GRASP was better than those of Random_GRASP and Epsilon_GRASP. The calculation time of Random_GRASP and Epsilon_GRASP were faster than that of Grid_GRASP.

컨테이너 항만경쟁력 결정요인 분석 (The Analysis on the Determinations Factors of Container Port Competitiveness)

  • 이기태;백인흠
    • 수산해양교육연구
    • /
    • 제27권1호
    • /
    • pp.262-272
    • /
    • 2015
  • The aim of this study is to analysis factors that determine the competitiveness of container ports using the KJ and AHP methods. For this, 54 detailed attributing factors were identified both by previous studies and port users. 24 attributing factors were identified by a group of port experts. also, These were grouped 18 detailed attributing factors into 6 attributing factors by a group of port experts using the KJ method. These were made into a model of hierarchical structure with 3 levels, taking 1 goal factor, 6 evaluation factors and 18 detailed evaluation factors. The collected date of questionnaires were analyzed by a group of port experts using the AHP method. The analysis result of the evaluation factors in container port shows that port cargo volume is the most important factor, followed by port location, port cost, port service, port facility and port management. The analysis results of detailed evaluation factors in container port shows that import and export cargo volume is the most important factor, followed by transshipment cargo volume, distance from main trunk, cargo handling cost, distance from the point of importing and exporting, speediness of cargo handling, stability of cargo handling, vessel/cargo cost in port entry and leaving, punctuality in port entry and leaving, number and length of berth, collateral service cost, terminal area, hinterland accessibility, ability of terminal operation company, front depth of berth, etc.

다양한 예측기법을 이용한 현장타설말뚝의 최적길이 산정 (Estimation of Optimum Pile length Using Various Prediction)

  • 최영석;임형준;송명준;장학성
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.700-707
    • /
    • 2008
  • As plan connecting island to island or island to land is needed, a lot of long-span bridge is being designed lately in Southern part of Korea. With development of pile equipment, overhanging large-scaled concrete pile are adopted to foundation type of main tower or pylon. About the number of 15~30 group piles per tower foundation is designed to resist long-spaning super-structure load, but by restricted condition of site investigation cost, a few boring-hole tests are performed to identify sub-ground layers. Up to now, direct-curved method connecting two or three known boring logs and representative interval method are usually used to evaluate unknown depth and rock properties at locations where piles are constructed. Because this approach is not logical and so rough, much difference occurs between designed length of piles and real length of it. In this paper, using a lot of various prediction method(reciprocal distance method, inverse square distance method and kriging method etc.), we suggest optimum length of group piles.

  • PDF

멀티미디어 데이터베이스 시스템에서 최대거리를 이용한 K-최대근접질의 처리 방법 (The Method to Process Nearest Neighbor Queries using Maximun Distance in Multimedia Database Systems)

  • 선휘준;신성철
    • 한국컴퓨터산업학회논문지
    • /
    • 제5권9호
    • /
    • pp.1025-1030
    • /
    • 2004
  • 멀티미디어 데이타베이스 시스템에서 k-최대근접질의는 매우 빈번히 발생하며, 다른유형의 공간질의에 비하여 처리비용이 많이 요구된다. K-최대근접질의의 처리비용을 최적화하기 위해서는 색인에서 검색되는 노드의 수와 연산시간을 최소화할 수 있어야한다. 본 논문에서는 최적검색거리[1]의 연산시간을 줄일 수 있는 새로운 검색거리를 제안하고 그 특성을 보인다.

  • PDF

보로노이 다이어그램에 기반한 개선된 유클리디언 거리 변환 방법 (Improved Euclidean transform method using Voronoi diagram)

  • 장석환;박용섭;김회율
    • 한국통신학회논문지
    • /
    • 제29권12C호
    • /
    • pp.1686-1691
    • /
    • 2004
  • 본 논문에서는 기존의 고속 유클리디언 거리 변환법을 개선한 새로운 계산 방법을 제안한다. 기존의 고속 유클리디언 거리 변환법이 가지고 있는 단점인 특징점의 수에 비례하여 계산량이 늘어나는 단점을 극복하기 위해서, 본 논문에서는 특징점들 중에서 비특징점과 4방향으로 연결되어 있는 특징점만을 이용하여 보로노이 다이어그램을 계산함으로써 유클리디언 거리 변화도(Euclidean distance map)의 계산 시간을 기존의 방법보다 평균 40%로 감소시켰다. 본 논문에서 제안한 방법의 효율성을 검증하기 위해서 크기의 바이너리 영상 16장에서 대해서 기존의 방법과 제안한 방법으로 똑같이 유클리디언 거리 변화도를 계산하여 계산 시간을 비교함으로써 그 효능을 입증하였다.

기대 총 건설비 및 허용 활동량을 고려한 방파제 케이슨의 최적설계 (Optimal Design of Breakwater Caisson Considering Expected Total Construction Cost and Allowable Sliding Distance)

  • 김경숙;서경덕
    • 한국해안해양공학회지
    • /
    • 제17권4호
    • /
    • pp.280-293
    • /
    • 2005
  • 본 연구에서는 직립 방파제 케이슨의 활동량 산정 모델과 케이슨 복구비용 계산 모델을 결합하여 기대 총 건설비 산정 모델을 수립하였다. 직립 방파제 케이슨의 최적 단면은 활동량의 허용 범위 내에서 기대 총 건설비가 최소가 되는 단면으로 정의된다 활동량의 허용 범위는 방파제 수명 동안의 기대 활동량을 0.1m로 하는 경우와 방파제 수명 동안의 누적 활동량이 0.3 m를 초과하는 확률을 0.1 이내로 하는 경우를 고려하였다. 또한 할인율 개념을 도입하여 미래 가치로 산정된 복구비용을 현재가치로 환산하였다. 작은 재현주기에 대해서 설계된 케이슨의 경우 잦은 복구 활동으로 인해 할인율을 적용했을 때의 기대 총 건설비용이 할인율을 적용하지 않았을 때보다 작아진다. 수심이 얕을 때 본 설계법이 기존의 결정론적 설계법보다 더 작은 단면을 요구하여 경제적인 설계가 가능하다. 한편, 수심이 얕을 때는 전술한 활동량 허용 기준들이 비슷한 결과를 나타내지만, 깊은 수심에서는 전자가 후자보다 더 큰 단면을 요구한다.

거리체감제 도입에 따른 체감율 산정에 관한 연구 - 철도부문을 중심으로 - (A study on deciding diminishing rate by introducing diminishing fare rate to distance - focusing on railroad -)

  • 김경태;유재균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 추계학술대회 논문집
    • /
    • pp.91-96
    • /
    • 2001
  • Diminishing fare rate to distance is widely applied in transportation field including bus, but the decision method of diminishing rate is not established. The basic concept of diminishing fare rate to distance is that passengers have a benefit according to their travel distance. Furthermore, this can be justified in the standpoint of operator because the cost of long-distance traveller is lower than that of short-distance traveller to make same income. It is essential to introduce diminishing fare rate to distance to decide diminishing rate. We suggested methodologies regarding how to decide diminishing rate on the basis of operator costs.

  • PDF