• 제목/요약/키워드: Cost-Effective Implementation

검색결과 359건 처리시간 0.025초

물류비의 효율적 관리를 위한 글로벌 기업의 물류정보시스템 구축 전략 : 'A'전자 구축사례를 중심으로 (Logistics Information System's Implementation Strategy of Global Company for Effective Logistics Cost Management : Focus on Case Study of 'A' Electronic Company)

  • 이종화;고현우
    • 산업경영시스템학회지
    • /
    • 제31권1호
    • /
    • pp.132-141
    • /
    • 2008
  • This research was conducted in order to present the strategies of implementing the logistics information system for effective logistics cost management with the case study of a leading global company. The strategy for effective logistics information system can be derived from the 3 different viewpoints, Firstly the effective global logistics management can be insured by means of the efforts of the reinforced total organization. Secondly from the process-oriented perspective, we should recognize the logistics process as the core factor of the competitive strategy and innovate the logistics process itself for the logistics cost reduction. Finally, the logistics cost will be effectively managed through establishing its logistics information strategy which maximizes the utilization of the information technologies. The case study of 'A' electronics company shows that its logistics management system provides the company with various visibilities about its logistics cost and the direct and indirect benefits over billions of wons per year as well. Therefore we can conclude that the research model provided in this research is validated. This study presents the concrete implementation strategies of the logistics information system and verifies the validity of the strategies by means of the case study of a leading company.

부분 태그와 작은 데이터 크기에 기반한 저비용 연산결과 예측기 구조 (Cost Effective Value Prediction Microarchitecture using Partial-Tag and Narrow-Width Operands)

  • 최병수;이동익
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2001년도 하계종합학술대회 논문집(2)
    • /
    • pp.265-268
    • /
    • 2001
  • In this paper we investigate the implementation cost of value prediction methods for high performance micro-processors, and propose a new value prediction microarchitecture with low cost. After simulation, we found that the proposed microarchitecture can decrease the implementation cost by 36% to 50% and with slight performance degradation (less than 5%) .

  • PDF

Implementation of cost-effective wireless photovoltaic monitoring module at panel level

  • Jeong, Jin-Doo;Han, Jinsoo;Lee, Il-Woo;Chong, Jong-Wha
    • ETRI Journal
    • /
    • 제40권5호
    • /
    • pp.664-676
    • /
    • 2018
  • Given the rapidly increasing market penetration of photovoltaic (PV) systems in many fields, including construction and housing, the effective maintenance of PV systems through remote monitoring at the panel level has attracted attention to quickly detect faults that cause reductions in yearly PV energy production, and which can reduce the whole-life cost. A key point of PV monitoring at the panel level is cost-effectiveness, as the installation of the massive PV panels that comprise PV systems is showing rapid growth in the market. This paper proposes an implementation method that involves the use of a panel-level wireless PV monitoring module (WPMM), and which assesses the cost-effectiveness of this approach. To maximize the cost-effectiveness, the designed WPMM uses a voltage-divider scheme for voltage metering and a shunt-resistor scheme for current metering. In addition, the proposed method offsets the effect of element errors by extracting calibration parameters. Furthermore, a design method is presented for portable and user-friendly PV monitoring, and demonstration results using a commercial 30-kW PV system are described.

건설공사 실시설계 VE시 기능분석 이전 단계에서 CostModeling을 통한 핵심 쟁점 사항 도출에 의한 효용성에 관한 고찰 (Review of effectiveness at the Construction implementation design VE study by the selected target through CostModeling in the Pre-functional analysis Phase)

  • 정연구;전상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.244-245
    • /
    • 2021
  • Design VE (Value Engineering) has been basic design and implementation design separately, but due to the recent change in guidelines, it is changing to implement only once in the implementation design stage. However, in the implementation design stage, construction costs, plans, and specifications based on the volume details are almost completed. Therefore, it is effective to perform the function analysis step after identifying information analysis and key issues through CostModeling based on functional center for the selected target in the process of implementing the VE performance procedure.

  • PDF

Practical Application of Life-Cycle Cost Effective Design and Rehabilitation of Bridges

  • Cho, HyoNam;Park, KyungHoon;Hwang, YoonGoog;Lee, KwangMin
    • Corrosion Science and Technology
    • /
    • 제3권2호
    • /
    • pp.72-80
    • /
    • 2004
  • Recently, the demand on the practical application of life-cycle cost effective design and rehabilitation of bridges is rapidly growing in civil engineering practice. However, in spite of impressive progress in the researches on the Life-Cycle Cost (LCC), the most researches have only focused on the theoretical point but did not fully incorporate the critical issues for the practical implementation. Thus, this paper is intended to suggest a systemic integrated approach to the practical application of various LCC methodologies for the design and rehabilitation of bridges, For that purpose, hierarchical definitions of LCC models are presented to categorize the approach of LCC assessment applicable for the practical implementation. And then, an integrated LCC system model is introduced with an emphasis on data uncertainty assessment and user-friendly knowledge-based database for its successful implementation. Finally, in order to demonstrate the LCC effectiveness for design and rehabilitation of real bridge structures, illustrative examples are discussed.

품질비용(品質費用)시스템의 구축절차(構築節次)와 한계(限界)에 관한 소고(小考) (A Study on The Implementation Procedures and Limitations of Quality Cost System)

  • 류한주;김달곤
    • 품질경영학회지
    • /
    • 제22권4호
    • /
    • pp.132-151
    • /
    • 1994
  • Quality is a critical competitive factor in today's environment because of the impact of quality on market share, productivity and costs. Especially in Korean companies, the importance of quality is heightened as they are losing price competitiveness compared to the new industrialized countries. The traditional approach to quality improvement has been focused on workers. The primary means to achieving acceptable outgoing quality has been to inspect quality by adding more inspectors and inspection stations. This is an example of quality cost that can be reduced through the preventive actions against bad quality. Quality cost is best viewed as a measure of costs specifically associated with the achievement or nonachievement of product/service quality required by customers. This paper examines the concept of quality cost, provides guidance to implementing a quality cost system, and identifies the limitations of quality cost information. These limitations are the target for future research for an efficient and effective implementation of quality cost system.

  • PDF

Design, Control, and Implementation of Small Quad-Rotor System Under Practical Limitation of Cost Effectiveness

  • Jeong, Seungho;Jung, Seul
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • 제13권4호
    • /
    • pp.324-335
    • /
    • 2013
  • This article presents the design, control, and implementation of a small quad-rotor system under the practical limitation of being cost effective for private use, such as in the cases of control education or hobbies involving radio-controlled systems. Several practical problems associated with implementing a small quad-rotor system had to be taken into account to satisfy this cost constraint. First, the size was reduced to attain better maneuverability. Second, the main control hardware was limited to an 8-bit processor such as an AVR to reduce cost. Third, the algorithms related to the control and sensing tasks were optimized to be within the computational capabilities of the available processor within one sampling time. A small quad-rotor system was ultimately implemented after satisfying all of the above practical limitations. Experimental studies were conducted to confirm the control performance and the operational abilities of the system.

신재생에너지 사업의 청정개발체제 사전 타당성 평가 프로그램 개발 (Development of Pre-Validation Program of Clean Development Mechanism for Renewable Energy)

  • 박종배;정윤원;이우남;이상형;원성희;허보연;오대균;하경애
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.420-421
    • /
    • 2006
  • The cost-effective reduction of greenhouse gas(GHG) emission to avert the most severe impacts of climate change remains one of the widely accepted priorities for global action. In order to facilitate cost-effective abatement strategies, the Kyoto Protocol introduced three mechanisms, or flexible instruments, the Emissions Trading(ET), the Joint Implementation(JI) and the Clean Development Mechanism(CDM). The CDM enables Annex I countries to the Kyoto Protocol to partially meet cost-effectively their emission reduction commitments by undertaking GHG mitigation Projects in developing countries, which do not have any GHG abatement obligations and where the emission reductions are cheaper. One of the major barriers hampering the wide spread implementation of CDM is the high transaction costs associated with the initial identification of promising CDM projects. This paper presents development of a pre-validation program of CDM. The developed program may provide a useful aid to potential investors and project developers as a supportive pre-evaluation tool, and may become an effective tool for the promotion of renewable energy and fuel switching projects.

  • PDF

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • 제10권1호
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

Elimination of Lancet-Related Needlestick Injuries Using a Safety-Engineered Lancet: Experience in a Hospital

  • An, Hye-sun;Ko, Suhui;Bang, Ji Hwan;Park, Sang-Won
    • Infection and chemotherapy
    • /
    • 제50권4호
    • /
    • pp.319-327
    • /
    • 2018
  • Background: Lancet-related needlestick injuries (NSIs) occur steadily in clinical practices. Safety-engineered devices (SEDs) can systematically reduce NSIs. However, the use of SEDs is not active and no study to guide the implementation of SEDs was known in South Korea. The lancet-related NSIs may be eliminated to zero incidence using a SED lancet with effective sharp injury protection and reuse prevention features. Materials and Methods: We implemented a SED lancet by replacing a conventional prick lancet in a tertiary hospital in a sequential approach. A spot test of the new SED was conducted for 1 month to check the acceptability in practice and a questionnaire survey was obtained from the healthcare workers (HCWs). A pilot implementation of the SED lancet in 2 wards was made for 1 year. Based on these preliminary interventions, a hospital-wide full implementation of the SED lancet was launched. The incidence of NSIs and cost expenditure before and after the intervention were compared. Results: There were 29 cases of conventional prick lancet-related NSIs for 3 years before the full implementation of SED lancet. The proportion of prick lancet-related NSIs among yearly all kinds of NSIs during two years before the pilot study was average 11.7% (22/188). Pre-interventional baseline incidence of all kinds of NSIs was 7.01 per 100 HCW-years. After the full implementation of SED lancet, the lancet-related NSIs became zero in the 2nd year (P = 0.001). The average direct cost of 18,393 US dollars (USD) per year from device and post-exposure medical care before the intervention rose to 20,701 USD in the 2nd year of the intervention. The incremental cost-effectiveness ratio was 210 USD per injury avoided. Conclusion: The implementation of a SED lancet could eliminate the lancet-related NSIs to zero incidence. The cost increase incurred by the use of SED lancet was tolerable.