• 제목/요약/키워드: Cost-BIM

검색결과 240건 처리시간 0.023초

BIM을 이용한 공동주택 장기수선비용 예측모델 제시 (A Study on the Forecasting of Using BIM Long-Term Maintenance Cost Model for Apartment)

  • 송아름;김지윤;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.215-217
    • /
    • 2013
  • The maintenance management in buildings has got more important by the increasing complexity of building sizes and use. Nowadays an expectation and a possibility of BIM technology become accepted as a new construction management method, therefore many studies and legal systems of it are being suggested actively. Although orders for BIM projects are supposed to be increasing, at present the BIM information accumulated from planning and design still doesn't have its continuity at the maintenance step after completion of construction in terms of LCC. It can't use the possibility that BIM originally has, and also causes some confusion in communication. This study analyzes and classifies required information in terms of BIM in the range of estimating repair costs of apartment buildings, as an example of a way to use BIM information at the maintenance step.

  • PDF

오픈 소스 BIM서버를 활용한 비용 효과적인 GIS기반 BIM 객체 가시화 시스템 아키텍처 설계 (GIS-based BIM Object Visualization System Architecture Design using Open source BIM Server Cost-Effectively)

  • 강태욱;홍창희
    • Spatial Information Research
    • /
    • 제22권1호
    • /
    • pp.45-53
    • /
    • 2014
  • 본 연구의 목적은 오픈소스 BIM서버를 활용해 GIS(Geographic Information System)기반으로 BIM(Building Information Modeling)객체를 가시화하는 비용 효과적인 시스템 아키텍처를 디자인하는 것이다. 최근 세계적으로 GIS와 BIM을 기반으로 시설물 관리 등을 효과적으로 구현하기 위한 연구가 진행되고 있다. 관련 연구에서 GIS와 같은 이기종 시스템과 연계가 가능한 BIM서버가 개발될 필요성이 부각되고 있다. 이런 관점에서 오픈소스 BIM서버는 비용 및 유지보수성 측면에서 효과적인 대안이 될 수 있다. 본 연구는 오픈소스 BIM서버를 활용한 GIS기반 BIM객체 가시화 시스템의 아키텍처를 디자인한다. 이를 구현하기 위해 BIM서버 관련 연구 동향을 분석하고, 최근 해외에서 활용되기 시작한 오픈소스 기반 BIM서버인 bimServer의 구조를 분석한다. BIM서버에 저장된 BIM객체의 데이터인 형상 및 속성을 GIS 상에 가시화할 수 있는 방안을 도출하고 아키텍처를 제안한다. 마지막으로 제안된 아키텍처의 적용성을 보이기 위해 시스템을 구현하고 결과를 도출한다.

Risk Identification and Management Strategies for BIM Projects

  • Ng, Ron C.W.;Cheng, Jack C.P.;Das, Moumita
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.103-113
    • /
    • 2020
  • The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.

  • PDF

실시설계단계에서 수량산출을 위한 복합벽체 자동분할에 관한 연구 (A Study for Automated Division of Composite Walls for Quantity Take-off in Construction Document Phase)

  • 박승화;김흥수;윤두영
    • 한국CDE학회논문집
    • /
    • 제20권2호
    • /
    • pp.124-132
    • /
    • 2015
  • When Building Information Modeling (BIM) was introduced at the early stage, it was only utilized as a three-dimensional visualization tool. Nowadays, however, BIM is being studied for increasing design productivity and managing enormous information on building life cycle. One of the representative research is developing 'common prototype BIM libraries'. BIM data made of common prototype libraries should be utilized in various ways, quantity takeoff, code checking, energy analysis and so on. However, common prototype BIM libraries are not enough to estimate accurate cost. For example, composite wall libraries should be divided into several single objects, wall structure and finishes, for the quantity takeoff and construction cost calculation. In this paper, we are suggesting an automated division algorithm of composite wall and developing a system prototype for it. This study is expected to reduce extra modeling work and contribute to fast and accurate cost calculation in the construction.

로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석 (An Analysis on Relations between Design Errors Detected during BIM-based Design Validation and the Impacts Using Logistic Regression)

  • 원종성
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.264-265
    • /
    • 2017
  • This paper aims to analyze relations between design errors prevented by building information modeling (BIM)-based design validation and their impacts in order to identify critical consideration factors for successfully implementing BIM-based design validation in the architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to its causes and work types. The relations between causes and work types of design errors and project delay, cost overrun, low quality, and rework generation that can be caused by the errors are analyzed through conducting logistic regression. Characteristics of each design error are analyzed by conducting face-to-face interviews with practitioners in the two BIM-based projects. As the results, the impacts of design error causes on predicting project delay, cost overrun, low quality, and rework generation were the highest.

  • PDF

IFC와 디지털 수량산출정보 교환표준의 연계 가능성 평가 (Evaluation on the Possibility of Connection Between IFC and Digital Quantity DataBase Exchange Standard)

  • 원지선;문진석;최원식
    • 한국산학기술학회논문지
    • /
    • 제14권12호
    • /
    • pp.6488-6494
    • /
    • 2013
  • 최근 BIM이 건설생산성을 향상시키는 기술로 주목 받으면서, BIM 발주가 화두가 되고 있다. BIM 사업에 적용될 표준은 현행 2D 기반의 표준을 최대한 활용하거나 연계를 지원하는 방향으로 제시되는 것이 필요하다. 따라서 본 논문에서는 BIM 기반 수량산출서와 내역서 표준을 개발함에 있어 현재 도로사업 공사비 관리를 위해 적용 중인 디지털 수량산출정보 교환표준(QDBEx)을 활용하고 BIM 데이터 납품 포맷인 IFC 표준과 연계하는 관점에서 연구를 수행하였다. BIM 기반 수량산출서와 내역서가 IFC 파일로 납품될 경우, IFC 파일이 QDBEx에 따른 XML 수량산출정보로 변환되어 활용될 수 있는지를 평가하였다. 그 결과, 전체의 66%가 바로 연계가 가능하며, 17%가 인스턴스의 가공을 통해 연계가 가능하였다. 나머지 17%는 연계가 불가능한 것으로 평가되었다. 향후, 이 결과를 바탕으로 연계 가능성을 높이기 위한 IFC와 QDBEx의 스키마 개선방안을 제시할 계획이다.

BIM 객체분류체계 (OBS) 개념 및 구조 (Concept and Structure of Parametric Object Breakdown Structure (OBS) for Practical BIM)

  • 정영수;김예솔;김민;주태환
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.88-96
    • /
    • 2013
  • 건설정보화의 다양한 노력 중, 최근 Building Information Modelling (BIM) 활용이 급속히 확대되고 있으며 그 활용 형태 또한 점차 '고도화' 및 '효율화'되고 있다. 그럼에도 불구하고, BIM 실무활용을 위해서 요구되는 다대한 추가 업무 부담은 BIM 실무적용의 가장 중요한 장애요인으로 지적되어 왔다. 이러한 맥락에서, 본 연구는 BIM 활용의 기능적인 '고도화'를 더욱 발전시키면서 동시에 이에 요구되는 업무 부담을 최소화시키는'효율화'를 연구목표로 설정하고, 이를 위한 핵심 요소기술로서, "BIM 객체 분류체계 (OBS)"를 정의하고 개발하였다. 본 연구에서 제안된 OBS는 BIM 도형정보의 각 객체별 식별번호를 목적에 부합한 규칙에 의해 부여함으로써, 비도형 정보(예로서 공정 및 원가)와의 연계를 용이케 하는 것을 목적으로 한다. 제안된 OBS 활용을 통하여 객체간의 물리적 위계 구성, 공정 액티비티 연계, 원가 정보 연계 등 다수 기능이 시스템화 되며, 따라서 다차원 CAD 구현을 위해 요구되는 지나치게 많은 데이터간의 연계 작업이 자동화됨으로써 BIM 실무구현의 현실성을 획기적으로 높일 수 있다. 제안된 OBS의 개념은 신한옥 주택 건설 사례를 통하여 적용 및 검증하였다.

건축 물량산출 활용을 위한 BIM품질기준 도입 방안 (Introduction of BIM Quality Standard for Quantity Take-off)

  • 권오철;조찬원;조주원
    • 한국건축시공학회지
    • /
    • 제11권2호
    • /
    • pp.171-180
    • /
    • 2011
  • 최근 국내외에서 건축물의 고층화 및 비정형화 추세 속에서 BIM기술이 활발히 이루어지고 있으나 설계단계의 BIM 데이터가 시공현장에 적극적으로 재활용되지는 못하고 있다. 건설 회사들의 주요 관심사는 공정 및 공사비 관리 등 여러 분야인데 BIM기술이 활발히 사용되기 위해서는 BIM 데이터가 이러한 용도로 활용될 수 있도록 올바르게 작성되어야 한다. 이를 위해서는 특히 BIM데이터를 건물 부재별로 수량을 올바르게 산출할 수 있도록 기준을 설정하여 BIM데이터를 작성하는 것이 필요하며 작성된 BIM데이터가 올바르게 만들어졌는지를 품질관리 차원에서 확인하는 것이 필요하다. 본 연구는 BIM기술이 건설현정의 공정 및 공사비 관리에 활용에 매우 중요한 물량산출을 올바르게 할 수 있도록 BIM데이터의 품질을 확보할 방안에 대한 제시를 목적으로 수행되었다.

클라우드 컴퓨팅 기반 BIM 서비스를 위한 BIM 서버 기반의 뷰어 개발 (A Prototype BIM Server based viewer for Cloud Computing BIM Services)

  • 윤수원;김병곤;최종문;권순욱
    • 대한토목학회논문집
    • /
    • 제33권4호
    • /
    • pp.1719-1730
    • /
    • 2013
  • 최근 BIM 기술은 적용 확대가 모색되고 있으나, 관련 제도 미비, BIM 인프라 구축비용, 프로세스 상이 등과 같은 문제로 인해 초기 기대치보다 확산이 지연되고 있다. 따라서 본 연구는 이러한 문제 중, BIM 운영을 위해 필요한 인프라 구축 비용 절감과 국내 프로세스에 맞는 다양한 BIM 서비스 제공을 위한 방안으로 클라우드 컴퓨팅 기술과 BIM을 접목하는 것을 제안하고, 이를 위한 수요 조사를 바탕으로, 클라우드 컴퓨팅을 이용한 인프라 비용 절감(IaaS 구축)을 위한 IFC 기반 BIM 서버와 맞춤형 서비스(SaaS 제공)를 위한 Viewer를 개발하였다. 또한 본 연구에서는 개발된 시스템의 실용화 가능 여부에 관한 성능 테스트를 실시하여, 개발 결과물이 향후 클라우드 기반 BIM 서비스 개발의 요소기술로 활용될 수 있다는 것을 검증하였다.

BIM과 온톨로지를 활용한 표준내역항목 추론 자동화 (Automatic Inference of Standard BOQ(Bill of Quantities) Items using BIM and Ontology)

  • 이슬기;김가람;유정호
    • 한국건설관리학회논문집
    • /
    • 제13권3호
    • /
    • pp.99-108
    • /
    • 2012
  • BIM(Building Information Model) 기반으로 기본설계를 수행한 경우에도 개략적인 설계 정보만 제공되므로, 내역작성에 필요한 충분한 정보를 설계도면으로부터 확보하는 것이 어렵다. 하지만 대부분 BIM기반 공사비산정 관련 연구들은 물량산출 자동화 또는 BIM 기반 물량산출결과의 정확도 향상을 위한 방안 제시하는 것이 대부분이며, 건설사업의 공사비산정에서 요구되고 있는 표준품셈 및 일위대가에 대한 고려가 미흡하다. 따라서 본 연구에서는 BIM 활용의 장점을 활용하고 여기에 온톨로지 기술을 접목하여, BIM 기반의 기본설계 정보로부터 내역서 생성에 필요한 작업내역을 자동으로 추출하는 프로세스를 제시한다. 이 프로세스를 적용할 경우, BIM 정보의 활용성이 더욱 향상될 것으로 기대되며, 견적자의 자의적 판단이 개입되던 문제를 해결하여 동일한 BIM이라면 동일한 견적결과를 얻을 수 있는 일관성 있는 내역작성 방법 개발의 기초가 될 것으로 기대된다.