철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 - (Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway -)

  • 김환용;신민호;한상천;최영우;김창호
    • 한국BIM학회 논문집
    • /
    • 제8권4호
    • /
    • pp.41-48
    • /
    • 2018
  • Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.

사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석 (Performance Analysis of BIM Labor using Case Analysis)

  • 김형진;유무영;김재준;최창식
    • 한국BIM학회 논문집
    • /
    • 제7권3호
    • /
    • pp.31-39
    • /
    • 2017
  • BIM is effective to improve the labor productivity of construction participants. From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.

BIM기반 Life Cycle Cost 산정을 위한 프로세스에 관한 연구 (A Study on the Estimating Process for Life Cycle Cost based on BIM)

  • 이현주;문준호;박규태;김태희;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.149-151
    • /
    • 2011
  • Recently, Architectural Design based on Building Information Modeling(BIM) is popular, construction management based on BIM is necessary. such as Quantity take off, scheduling, and Life Cycle Cost Estimating etc. Therefore, in the study, LCC Estimating using BIM Data, which is extracted from architectural designing process is proposed.

  • PDF

BIM기반 건축물 수선교체비 산정 자동화방안 제시 (Suggestion of an Automatic BIM-based Repair & Replacement (R&R) Cost Estimating Process)

  • 박지은;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.87-88
    • /
    • 2016
  • In order to assess the design value of engineering work from the point of view of LCC (Life Cycle Cost) in Korea, it is mandatory for all construction works that the total construction costs are over 10 billion won. The LCC includes initial construction costs, maintenance & operation costs, energy costs, end-of-life costs, and so on. Among these, the portion for maintenance & operation costs for a building is sizeable, as compared to the initial construction costs. Furthermore, the paradigm for construction industry has rapidly shifted from 2D to BIM, which includes design planning and data management. However, the study of BIM-based LCC analysis is not adequate today, even though all domestic construction projects ordered by the Public Procurement Service have to adopt BIM. Therefore, this study suggests a methodology of BIM-based LCC analysis that is particularly focused on repair and replacement (R&R) cost. For this purpose, we defined requirements of calculating R&R cost and extracted X from the relevant IFC data. Thereafter, we input them to the ontology of calculating the initial construction costs to obtain an objective output. Finally, in order to automatically calculate R&R cost, mapping with R&R criteria was performed. We expect that our methodology will contribute to more efficiently calculate R&R cost and, furthermore, that this methodology will be applicable to all range of total LCC. Thus, the proposed process of automatic BIM-based LCC analysis will contribute to making LCC analysis more fast and accurate than it is at present.

  • PDF

국내 설계사무소의 BIM기반 통합설계프로세스 도입에 따른 비용효과분석에 관한 연구 (A Study on Cost-Benefit Analysis of BIM-based Integrated Design Process in Korean Architectural Offices)

  • 서지효;추승연
    • 한국CDE학회논문집
    • /
    • 제15권4호
    • /
    • pp.261-270
    • /
    • 2010
  • These days, architectural projects are becoming larger and more complex. And lots of information occurs through each phases and areas. For these reason, it is emphasized that collaboration with other parts. Therefore we need more effective architectural design process. However, it is difficult to collaborate in early stage with existing design process and it causes unnecessary spending of time and cost because of 2D-based working system. For solving these problem, we should introduce BIM-based Integrated Design Process which makes it possible to collaborate with other parts from early stage. Now the AEC industry in Korea has been trying to introduce BIM, and promoting variety of related business. However, for actual application of this system, it is unfortunately necessary to change various system throughout the construction industry. And this will cause lots of effort and expense. It is essential that scientific analysis and evaluation of efficiency and validity about this investment, because estimation of the investment and accompanying effects will provide reasonable standard of judgment for investment decision. Thus, this research conducted Cost-Benefit Analysis about BIM-based Integrated Design Process compared to existing design process. It is expected that this paper can be used for preliminary data in the future BIM market.

BIM 기반 MEP 설계 조율 프로세스 분석을 통한 비용 관리 시스템 개발 사례 연구 (Cost Management System for Mechanical, Electrical, and Plumbing(MEP) Coordination Using Building Information Modeling(BIM) - A Case Study)

  • 원종성;함성일;장세준
    • 한국건축시공학회지
    • /
    • 제22권2호
    • /
    • pp.195-205
    • /
    • 2022
  • 본 연구에서는 BIM(building information modeling)을 활용한 비용 기반 MEP(mechanical, electrical, and plumbing) 조율 프로세스를 제안하였다. 제안된 프로세스는 MEP 부재간 간섭 해결뿐만 아니라 MEP 조율 과정에서 의사결정에 따른 MEP 관련 비용 변화를 정확하고, 빠르게 분석하고, 참여자와 공유할 수 있도록 해준다. 이를 위하여 MEP BIM 모델로부터 추출된 물량 정보와 비용 데이터베이스, 시간 정보를 통합했다. 제안된 프로세스의 적용성을 평가하기 위하여 국내 건설 프로젝트 현장에 적용하였다. 적용 결과, 예상 비용 대비 약 1.6%의 MEP 관련 비용을 절감했다고 분석되었다.

BIM 모델 표현 수준(LOD) 분석을 통한 내역체계 개선방안 연구 (Improvement of Quantity Take-Off and BoQ through the LOD Criteria Analysis of BIM Models)

  • 최현준;윤석헌
    • 한국건설관리학회논문집
    • /
    • 제20권6호
    • /
    • pp.89-97
    • /
    • 2019
  • 최근 건설프로젝트에서 BIM의 도입이 활발히 이루어지고 있다. 특히 견적단계에서의 BIM의 도입은 공사비 예측의 정확성 향상 및 견적자의 업무를 절감할 수 있는 효과가 기대된다. 하지만 현재의 물량산출 과정과 내역서 작성과정은 상당부분 수작업으로 이루어지고 있다. 또 현행 내역서의 내역항목을 만족시키기 위해서는 BIM 모델이 매우 상세해져야 하는 문제점이 있다. 이에 본 연구는 LOD기준을 분석하여 BIM 모델의 표현 수준에 따라 산출될 수 있는 내역항목을 도출함으로써 현행 내역서의 개선방향을 BIM 모델의 LOD 측면에서 도모하고자 한다. LOD기반 내역항목 분석을 위해 내역항목 등급을 A,B,C등급으로 나누었다. 따라서 본 연구에서는 실시설계 단계에서 LOD 수준 따라 산출될 수 있는 내역항목의 수와 해당항목이 차지하는 금액 비율을 각 공종별로 검토하였다. 실시설계 단계에서 주요 개선 등급인 B등급에서 가장 많은 항목을 차지한 공종은 창호 및 유리공사이며, 가장 많은 금액을 차지한 공종은 철근콘크리트 공사로 분석되었다. 추후 항목비율이 높은항목과 금액비율이 높은항목별 적절한 개선방안제시가 필요할 것으로 판단된다. 본 연구의 결과는 BIM 견적이나 현행 내역서 체계 개선을 위한 기초자료로서의 역할을 기대 할 수 있을 것으로 판단된다.

BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안 (A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase)

  • 정준호;진상윤
    • 한국건설관리학회논문집
    • /
    • 제12권5호
    • /
    • pp.23-34
    • /
    • 2011
  • 건설현장에서 정확한 진도를 관리하기 위해서는 비용정보와 일정정보를 결합한 통합정보가 요구되며 프로젝트의 성과측정을 위한 기초자료가 된다. 그러나 국내 건설공사는 비용과 일정정보를 각각 관리함으로써 객관적인 성과측정이 어려우며 내역서상의 물량을 액티비티에 분개하는 작업을 통해 생산성을 감소시킨다. 한편, BIM을 활용한 연구가 진행되면서 BIM을 통해 보다 효율적으로 진도관리하는 연구가 필요한 실정이며 현장에서는 일일 작업관리에 대한 필요성이 요구되고 있다. 이러한 건설 산업의 흐름에 따라 본 논문에서는 BIM 모델의 위치정보와 BIM기반의 견적데이터를 활용하여 3가지 타입의 진도관리단위를 생성하고 이를 통해 일일 진도율 및 일일 기성액을 파악하는 정보모텔을 제시하고자 한다.

Automated Methodology for Linking BIM Objects with Cost and Schedule Information by utilizing Geometry Breakdown Structure (GBS)

  • Lee, Kwangjin;Jung, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.637-638
    • /
    • 2015
  • There has been growing interests in life-cycle project management in the construction industry. A lot of attention is given to Building Information Modeling (BIM) which stores and uses a variety of construction information for the life cycle of project management. However, due to the additional workload arising from BIM, its expected effects versus its input costs are still under discussion in practice. As an attempt to address this issue, one of previous studies suggested an automated linking process by developing Standard Classification Numbering System (SCNS) and Geometry Breakdown Structure (GBS) to enhance the efficiency of integration process of BIM objects, cost, and schedule. Though SCNS and GBS facilitates identifying all different dataset, making object sets and linking schedule activities still needs to be manually done without having an automated tool. In this context, the purpose of this paper is to develop and validate a fully automated integration system for 3D-objects, cost, and schedule. A prototype system for single family homes (Hanok) was developed and tested in order to verify its efficiency.

  • PDF

BIM 설계지원 기술콘텐츠 구축에 관한 연구 (A Study on the Technical Contents for BIM Design Support)

  • 조현정;장진석;김연수
    • 한국CDE학회논문집
    • /
    • 제20권2호
    • /
    • pp.114-123
    • /
    • 2015
  • The BIM libraries and technical contents in order to develop common technical standards that reflect the contents for a BIM design support should be based. It is essential to redress the technological burden on design office requirements. The technical contents consisted of Material Information, Standard Details and Cost Information are made by system of standard classification. By connecting BIM libraries with each of information including the contents, it derives the consistent BIM data application through the integrated model. In addition, we look forward to introducing and applying BIM more easily through securing common technical contents which remove the pressure of engineering developments of each individual architectural design office and prevent overlapping investments.