DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

Generating a Simplistic 3D Model for Mobile Platform Applications

  • Ahmed, Naveed;Park, Jee Woong;Morris, Brendan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1093-1099
    • /
    • 2022
  • The number of buildings is increasing day by day. The next logical footstep is tackling challenges regarding scarcity of resources and sustainability, as well as shifting focus on existing building structures to renovate and retrofit. Many existing old and heritage buildings lack documentation, such as building models, despite their necessity. Technological advances allow us to use virtual reality, augmented reality, and mixed reality on mobile platforms in various aspects of the construction industry. For these purposes, having a BIM model or high detail 3D model is not always necessary, as a simpler model can serve the purpose within many mobile platforms. This paper streamlines a framework for generating a lightweight 3D model for mobile platforms. In doing so, we use an existing structure's site survey data for the foundation data, followed by mobile VR implementation. This research conducted a pilot study on an existing building. The study provides a process of swiftly generating a lightweight 3D model of a building with relative accuracy and cost savings.

  • PDF

Image-Based Automatic Bridge Component Classification Using Deep Learning (딥러닝을 활용한 이미지 기반 교량 구성요소 자동분류 네트워크 개발)

  • Cho, Munwon;Lee, Jae Hyuk;Ryu, Young-Moo;Park, Jeongjun;Yoon, Hyungchul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.6
    • /
    • pp.751-760
    • /
    • 2021
  • Most bridges in Korea are over 20 years old, and many problems linked to their deterioration are being reported. The current practice for bridge inspection mainly depends on expert evaluation, which can be subjective. Recent studies have introduced data-driven methods using building information modeling, which can be more efficient and objective, but these methods require manual procedures that consume time and money. To overcome this, this study developed an image-based automaticbridge component classification network to reduce the time and cost required for converting the visual information of bridges to a digital model. The proposed method comprises two convolutional neural networks. The first network estimates the type of the bridge based on the superstructure, and the second network classifies the bridge components. In avalidation test, the proposed system automatically classified the components of 461 bridge images with 96.6 % of accuracy. The proposed approach is expected to contribute toward current bridge maintenance practice.

3D Architecture Modeling and Quantity Estimation using SketchUp (스케치업을 활용한 3D 건축모델링 및 물량산출)

  • Kim, Min Gyu;Um, Dae Yong
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.7 no.6
    • /
    • pp.701-708
    • /
    • 2017
  • The construction cost is estimated based on the drawings at the design stage and constructor will find efficient construction methods for budgeting and budgeting appropriate to the budget. Accurate quantity estimation and budgeting are critical to determining whether the project is profitable or not. However, since this process is mostly performed depending on manpower or 2D drawings, errors are likely to occur and The BIM(Build Information Modeling) program, which can be automated, is very expensive and difficult to apply in the field. In this study, 3D architectural modeling was performed using SketchUp which is a 3D modeling software and suggest a methodology for Quantity Estimation. As a result, 3D modeling was performed effectively using 2D drawings of buildings. Based on the modeling results, it was possible to calculate the difference of the quantity estimation by 2D drawing and 3D modeling. The research suggests that the 3D modeling using the SketchUp and the calculation of the quantity can prevent the error of the conventional 2D calculation method. If the applicability of the research method is verified through continuous research, it will contribute to increase the efficiency of architectural modeling and quantity Estimation work.

CNC Twisted Tube Method for 3D Coordinate Control Technology for Freeform Structure -Focused on The ARC in DaeGu- (비정형구조의 3차원 좌표제어를 위한 CNC Twisted Tube 공법 적용 -대구 대표물문화관(The ARC)를 중심으로-)

  • Ryu, Han-Guk;Kim, Sung-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.434-440
    • /
    • 2013
  • Generally, the envelope of a freeform building is composed of a structure made with rectangular or C-shaped steel pipe, and steel or aluminum panel finishes on the structure. However, these construction methods increase material loss and cost and time. There are also numerous cases of misunderstanding of design and difficulties in construction, which frequently cause construction errors. Such construction errors decrease construction productivity, resulting in poor construction quality and the need for rework, as well as cost and time overruns. To solve the problem, this study proposes a 3D coordinate control technology for freeform structure implemented through a CNC(Computerized Numerical Control) Twisted tube method, and by extension, develops a BIM-based envelope construction method for freeform building.

3D WALK-THROUGH ENVIRONMENTAL MODEL FOR VISUALIZATION OF INTERIOR CONSTRUCTION PROGRESS MONITORING

  • Seungjun Roh;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.920-927
    • /
    • 2009
  • Many schedule delays and cost overruns in interior construction are caused by a lack of understanding in detailed and complicated interior works. To minimize these potential impacts in interior construction, a systematic approach for project managers to detect discrepancies at early stages and take corrective action through use of visualized data is required. This systematic implementation is still challenging: monitoring is time-consuming due to the significant amount of as-built data that needs to be collected and evaluated; and current interior construction progress reports have visual limitations in providing spatial context and in representing the complexities of interior components. To overcome these issues, this research focuses on visualization and computer vision techniques representing interior construction progress with photographs. The as-planned 3D models and as-built photographs are visualized in a 3D walk-through model. Within such an environment, the as-built interior construction elements are detected through computer vision techniques to automatically extract the progress data linked with Building Information Modeling (BIM). This allows a comparison between the as-planned model and as-built elements to be used for the representation of interior construction progress by superimposing over a 3D environment. This paper presents the process of representing and detecting interior construction components and the results for an ongoing construction project. This paper discusses implementation and future potential enhancement of these techniques in construction.

  • PDF

Web-system development for the feasibility of national road

  • Park, T.;Shin, E.;Kang, T.;Park, W.;Lee, Y.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.698-699
    • /
    • 2015
  • For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.

  • PDF

Recipe-based estimation system for 5D(3D + Cost + Schedule) CAD system (레서피(Recipe) 기반의 견적 방법을 이용한 5D CAD 시스템)

  • Choi, Cheol-Ho;Park, Young-Jin;Han, Sung-Hun;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.154-160
    • /
    • 2006
  • There wasn't very successful practice cases for the quantity take-off based on the CAD system since the CAD system is used in the construction industry more than 20 years in Korea. It was also not easy to use 3D CAD system in design management and cost management in the construction industry although 3D CAD system is very successful in the manufacturing industry for those areas recently. It is important to construct 3D libraries and to supply those libraries for the designers in time. Architectural work is a kind of creative work. So, Architects like to create their own model. Unlike the manufacturing industry, 3D CAD system can not be survived in the construction industry without new 3D objects supply in the right time. Moreover, the estimation system for 3D must support the schematic design phase, detailed design phase and construction design phase. The product called "Constructor" of Graphisoft consist of modeller, estimator and scheduler based on 3D model. We applied the system to a real project and compared the estimation result and we made a very successful case study.

  • PDF

The Development of Information Breakdown Structure for Integrated Management of Water Filtration Plants (정수장 시설공사의 통합관리를 위한 시설물분류체계 개발)

  • Kim, Chang Hak;Kang, Leen Seok;Kim, Hyo Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.863-869
    • /
    • 2017
  • In this study, the information breakdown structure of water purification plant has been made by classifying various the water purification methods and facilities. this can be utilized as a code system of computer for integrating information and analyzing quantitative of environmental impact and calculating cost of maintenance and energy consumption which was used during life cycle of water purification plant. Since the construction information contains many heterogeneous information, it is very important to have a code system for managing the integrated information. In addition, since water purification plant facilities are mainly composed of installation of facilities including many processes, a more detailed classification code is required. Therefore, in this study, the water purification breakdown structure which is not yet attempted in Korea was constructed by using facet classification system.

Analysis of 3D Building Construction Applications in Augmented Reality

  • Khan, Humera Mehfooz;Waseemullah, Waseemullah;Bhutto, Muhammad Aslam;Khan, Shariq Mahmood;Baig, Mirza Adnan
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.10
    • /
    • pp.340-346
    • /
    • 2022
  • Construction industry is considered as one of the oldest industries in the world since human came into being and the need of their own space is realized. All this led to make the world a space of many beautiful constructive ventures. As per the requirements of today's world, every industry is recognizing the need for use and adoption of modern as well as innovative technologies due to their benefits and timely production. Now construction industry has also started adopting the use of modern and innovative technologies during their projects but still the rate of adoption is so slow. From design to completion, construction projects take a lot to manage for which technology based solutions have continuously been proposed. These include Computer Aided Design (CAD), building information modeling (BIM) and cloud computing have been proved to be much successful until now. The construction projects are high budgeted, and direly require timely and successful completion with quality, resource and other constraints. So, the researchers observe the need of more clear and technology based communication between the construction projects and its constructors and other stakeholders is required before and during the construction to take timely precautions for expected issues. This study has analyzed the use of Augmented Reality (AR) technology adopting GammaAR, and ARki applications in construction industry. It has been found that both applications are light-weighted, upgradable, provide offline availability and collaborative environment as well as fulfil most of the requirements of the construction industry except the cost. These applications also support different screen size for better visualization and deep understanding. Both applications are analyzed, based on construction's application requirements, usability of AR and ratings of applications user collected from application's platform. The purpose of this research is to provide a detail insight of construction applications which are using AR to facilitate both the future developers and consumers.