Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase (대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석)

  • Ham, Nam-Hyuk;Yuh, Ok-Kyung;Ji, Kyu-Hyun
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

Development of Construction Cost Analysis Process Based on Structural Building Information Modeling (구조BIM기반 공사비 상세분석 프로세스 구축)

  • Lee, Seung-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.237-238
    • /
    • 2012
  • As a way to improve productivity and integrated project delivery in construction industry, BIM(building Information Modeling) using IT technique is being studied and applied recently. S-BIM application Process was established that enable efficient work through Structural BIM detailed Model in consideration of the collaboration among relevant fields. This study has the objective applying S-BIM technique to enable effective Cost Analysis in initial design phase and presenting the method for practical works using Construction Cost Analysis Process based on S-BIM.

  • PDF

Evaluation and Selection of Building Materials based on Life Cycle Cost Prediction (생애주기비용 예측 기반 건물재료 경제성 평가 및 선정)

  • Ahn, Junghwan;Lim, Jinkang;Oh, Minho;Lee, Jaewook
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.34-45
    • /
    • 2015
  • As buildings become larger and more complicated, construction costs have increased with a considerable effect on buildings' Life Cycle Cost (LCC). However, there has been little consideration on economic aspects in the selection of construction materials due to limited information on the materials and dependency in architects' experience and inefficiency in cost estimation, causing design changes, increase in maintenance cost, difficulty in budgeting, and decrease in building performance. To solve these problems, this study proposed a BIM-based material selection model which reflects the comprehensive economic efficiency of building materials. Our cost prediction model can estimates the material-related cost during the entire building life cycle. Furthermore, we implemented the proposed model in connection with BIM, which can analyze and compare LCC by material. Through the validation of the model, we could confirm the necessity of LCC-based material selection in comparison with the conventional cost-centered material selection.

Preliminary Study on the Construction of Database for BIM-based preliminary estimate. (BIM 기반 개산견적을 위한 DB구축 기초연구)

  • Jun, Kl-Hyun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.291-292
    • /
    • 2012
  • Progress in the construction project, the estimated cost of the measure is very important. Use preliminary estimate cost data for the prediction of construction cost. But, preliminary estimate cost data a clear calculation, there is no way. it is rely on the historical data and the past construction data. As a result, a significant difference in the actual construction cost and the predicted cost of the problem occurs. In this study, taking advantage of BIM Cost Prediction for efficient and rapid preliminary estimate BIM for building database through the study preliminary estimate cost data.

  • PDF

A Framework Integrating Cost and Schedule based on BIM using IFC (IFC활용 BIM기반 공정/원가 통합관리 프레임워크)

  • Lee, Jin-Gang;Lee, Hyun-Soo;Park, Moonseo;Jung, Minhyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.53-64
    • /
    • 2013
  • In building construction project, there are numerous information or data parts across many different software applications and professional specialists. BIM (Building Information Modeling), as a medium for managing information generated during construction project, it is intended to enhance the effectiveness of construction management and reap a lot of advantages such as, automatic quantity takeoff, error-free estimation, 4D(3D+Time), 5D(4D+Cost) simulation. Nevertheless, the overall and practical effectiveness of BIM utilization is difficult to justify at this stage. While helpful, there are some limitation when BIM applied to construction management due to the differences of data processing process between BIM and work in the field, limitations of information generated from BIM object and interoperability problem among BIM application. Therefore, this paper propose a framework integrating BIM with cost-schedule information using IFC. And we construct the system prototype based on the framework and performed case study to examine the framework. The proposed framework provides the information basis for BIM based cost-schedule integration. ultimately, the framework increase the utilization of BIM and work efficiency of construction industry by supporting an understanding of information.

A Survey of the effective BIM introduction plan on school building construction by Delphi Technique (델파이 기법을 이용한 학교건축물의 효율적 BIM 도입방안 조사 연구)

  • Seo, Deok Seok;Won, Ho Sik
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.13 no.1
    • /
    • pp.24-31
    • /
    • 2014
  • This study is focused to find the ways to improve the effective BIM introduction plan on school building construction by Delphi Technique. For this, the questionnaire is made by in-depth interviews of 10 BIM specialists, the survey of other 30 experts was carried out. The results of 30 experts Delphi survey are as followed. (1) The haptic effect of BIM introduction is very rare as lack of awareness and information on BIM. (2) Problems are arising from deficiency of training and experience on BIM. (3) Practical utilizations of BIM are very useful. (4) Barriers of the spread of BIM are high cost and insufficient environments. (5) The development potential of BIM is high. In order to activate the BIM market, the introduction of an accurate evaluation criteria and rational cost calculation standard are needed.

Developing an Integrated Evaluation Technology for Energy- and Cost-Efficient Building Design Based on BIM in the Real-time Manner

  • Park, Jae Wan;Lee, Yun Gil
    • Architectural research
    • /
    • v.16 no.3
    • /
    • pp.93-100
    • /
    • 2014
  • Existing BIM(Building Information Modeling) based energy evaluation tools cannot be utilized enough for the potential performance of BIM because most of them have not provided the integrated model for energy evaluation, assessment of the material, cost of the construction, and so on. This research aims to propose and develop a new application, EcoBIM, to support an integrated evaluation of the energy and cost efficiencies of the design alternatives within the design process. The proposed application functions as a BIM-based evaluation system that calculates energy-savings performance as well as the construction cost of the alternatives at the design stage. This study mainly focuses on the possibilities of developing the proposed technology. We also suggest an advanced design process using the proposed system, corresponding to changes of national regulations in Korea. This study deduce that EcoBIM can allow architects to make suitable decisions regarding energy- and cost-efficient designs. The proposed design process will allow architects not only to check the eco-friendly performance of design alternatives but also predict the operation cost in a certain period in the future. EcoBIM can prevent large-scale design changes required to obtain environmental certification and enable the owner to make an informed decision about the initial investment of construction according to the result of the analysis of the energy requirement at the design stage.