• Title/Summary/Keyword: Cost of Rehabilitation

Search Result 297, Processing Time 0.023 seconds

Recognition of Physical Rehabilitation on the Upper Limb Function using 3D Trajectory Information from the Stereo Vision Sensor (스테레오비전 센서의 3D 궤적 정보를 이용한 상지 재활 동작 인식)

  • Kwon, Ki-Hyeon;Lee, Hyung-Bong
    • Journal of the Korea Society of Computer and Information
    • /
    • v.18 no.8
    • /
    • pp.113-119
    • /
    • 2013
  • The requirement of rehabilitation is increasing from the stroke, spinal cord injury. One of the most difficult part is the upper limb rehabilitation because of its nervous complexity. A rehabilitation has effectiveness when a professional therapist treats in work at facility, but it has problems of an accessibility, a constant availability, a self-participation and taking lots of cost and time. In this paper, we test and experiment the accuracy and execution time of the pattern recognition algorithms like PCA, ICA, LDA, SVM to show the recognition possibility of it on the upper limb function from the 3D trajectory information which is gathered from stereo vision sensor(Kinect). From the result, PCA, ICA have low accuracy, but LDA, SVM have good accuracy to use for physical rehabilitation on the upper limb function.

Relationship Between Modified Physiological Cost Index for Isokinetic Ergometer Exercise Test and Oxygen Consumption (등속성 에르고미터 운동을 이용한 수정된 생리적 부담 지수와 산소소비량 변화량과의 상관성)

  • Park, Ho-Joon;Cho, Sang-Hyun;Yi, Chung-Hwi;Park, Jung-Mi
    • Physical Therapy Korea
    • /
    • v.7 no.2
    • /
    • pp.20-34
    • /
    • 2000
  • The purpose of this study was to establish modified physiological cost index (PCI) for predicting energy consumption by heart rate (HR) at isokinetic ergometer exercise testing. The subjects were twenty-eight healthy men in their twenties. All of them performed upper and lower extremity isokinetic ergometer exercise tests which had six loads (400, 500, 600, 700, 800, and 900 kg-m/min) and five loads (400, 500, 600, 700, and 800 kg-m/min) respectively. The exercise sessions were finished when HR was in plateau. HR and oxygen consumption were determined during the final minute. Resting heart rate and oxygen consumption were used for calculating heart rate, oxygen consumption changes and modified PCI. Regression analysis established the relationship between each variable to work load, HR and oxygen consumption. The results were as follows: 1) In the lower extremity ergometer exercise test, oxygen consumption increased continuously as work load increased, but in the upper extremity ergometer test, oxygen consumption only increased until work load was 700 kg-m/min. 2) HR increased as work load increased in both exercise tests, but in the upper extremity ergometer test, HR decreased from the 700 kg-m/min. 3) The modified PCI increased as work load mcreased until the 700 kg-m/min point in the lower extremity ergometer test and until the 500 kg-m/min point in the upper extremity ergometer test when it started to decrease in both tests. 4) In the lower extremity ergometer exercise test, regression analysis established the relation as $dVO_2$ = -.0215HR - .2141 where $dVO_2$ is given in l/min and HR in beat/min ($R^2$ = .2677, p = .000). ln the upper extremity ergometer exercise test. regression analysis established the relation as $dVO_2$ = -.0115HR + .2746 ($R^2$ = .1308, p = .000). The results of this study were similar to previous studies but were different under high work load conditions. So modified PCI should be used with only low intensity work load testing. Subjects for upper extremity ergometer exercise testing should complete a prescribed training course prior to testing, and only low intensity work load should be used for safety considerations.

  • PDF

Experimental study on repair of corroded steel beam using CFRP

  • Chen, Meiling;Das, Sreekanta
    • Steel and Composite Structures
    • /
    • v.9 no.2
    • /
    • pp.103-118
    • /
    • 2009
  • It has been reported that more than thirty five percent of steel bridges in the USA are structurally deficient because of structural degradations. The degraded structures need either full replacement or rehabilitation such that they are able to provide the required services for a longer period of time. The cost for repair in most cases is far less than the cost of replacement. Moreover, repair method generally takes less time than replacement and also reduces service interruption time. Modern advanced composites have been used in aerospace and automotive fields since World War II. In the recent past, because of the high strength-to-weight ratio and high stiffness-to-weight ratio, these composite materials have been introduced to civil engineering infrastructures primarily for repair and rehabilitation of concrete structures. However, only a few preliminary studies on repair of corroded steel structures using theses composite materials are reported in the literature available in the public domain. Thus, in this study, a series of laboratory tests was undertaken to evaluate the effectiveness of this repair method using carbon fiber reinforced polymer composite. The paper discusses the test method and test results obtained from these tests.

A Brushless DC Motor Drive System and Phase Current Estimation Method For Active Knee Prothesis (동력의지를 위한 BLDCM 구동 시스템 및 상전류 추정 기법)

  • Nam, K.J.;Choi, Y.B.;Jung, D.H.
    • Journal of rehabilitation welfare engineering & assistive technology
    • /
    • v.7 no.2
    • /
    • pp.7-12
    • /
    • 2013
  • In this paper, we propose a brushless DC motor drive system for active knee prosthesis and low-cost estimation method for phase current from DC-link current. To control motor torque directly, current sensing is very important and current sensing point should be synchronized with voltage switching command to minimize the effect of switching noise in current measurement, For maintaining small form factor, simplifying control schemes and achieving low-cost system, control schemes using DC-link current are used. Moreover, we incorporated phase current estimation method using analog MUX for minimizing current estimation error between DC-link current and phase current. The validity of the proposed system is verified through experimental works.

  • PDF

The Effects of Clinical Characteristics of Chronic Stroke Patients on Physiological Cost Index During Walking (만성 뇌졸중 환자의 임상적 특성이 보행 시 생리적 부담지수에 미치는 영향)

  • Kim, Won-Ho
    • Physical Therapy Korea
    • /
    • v.13 no.1
    • /
    • pp.32-37
    • /
    • 2006
  • The purpose of this study was to investigate the effects of clinical characteristics of chronic stroke patients on physiological cost index (PCI) during walking. Fourteen stroke patients participated in this study. To investigate the clinical characteristics, Fugl-Meyer score (FMS), gait velocity (GV), muscle strength of the knee extensor, modified Ashworth scale (MAS) of ankle plantar flexor, devices, and gait patterns during walking were measured and analyzed. The results were as follows: Firstly, use of devices and high MAS of the ankle plantar flexor significantly increased PCI. Secondly, PCI was significantly correlated with the FMS and MAS of the ankle plantar flexor. In conclusion, inhibition of spasticity of the ankle plantar flexor is considered to reduce PCI during walking for chronic stroke patients.

  • PDF

Case Study on the Construction Standard Production Rate for Operation and Maintenance Technology (건설공사 유지보수품셈 사례조사 연구)

  • An, Bang-Yul;Park, Tae-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.250-251
    • /
    • 2019
  • Lots of infrastructures have been newly constructed through the rapid economic growth of 1970's. Since the infrastructures has mostly deteriorated and this circumstance makes the need for maintenance and rehabilitation(M&R) of infrastructures to obtain the convenience and safety of users even more essential. Although markets for M&R project become larger, the construction standards for cost estimation of M&R work are insufficient. Thus, the purpose of this study is to examine the present state of standards for cost estimation of M&R works using case studies. Finally, this work could be utilized as the basis for the development of national standard for estimation of M&R work.

  • PDF

Optimal Design of Breakwater Caisson Considering Expected Total Construction Cost and Allowable Sliding Distance (기대 총 건설비 및 허용 활동량을 고려한 방파제 케이슨의 최적설계)

  • Kim Kyung-Suk;Suh Kyung-Duck
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.17 no.4
    • /
    • pp.280-293
    • /
    • 2005
  • In this study, a model to calculate the expected total construction cost has been developed by combining a model to calculate the sliding distance of a caisson of a vertical breakwater and a model to calculate the rehabilitation cost of a caisson. The optimal cross-section of a caisson of a vertical breakwater is defined as the cross-section that requires a minimum expected total construction cost within the allowable limit of caisson sliding. Two allowable limits are considered: 0.1 m of the expected sliding distance during the lifetime of the breakwater and 0.1 of the probability that the cumulative sliding distance during the lifetime of the breakwater is greater than 0.3 m. A discount rate has also been introduced to convert the future rehabilitation cost to the present value. The introduction of the discount rate reduces the expected total construction cost for the caissons designed for shorter return periods due to frequent rehabilitations. The present design method requires a smaller cross-section than the conventional deterministic method in shallow water depths, enabling us to design a caisson more economically. On the other hand, the above-mentioned allowable limits of caisson sliding show similar results for smaller water depths, while, for larger depths, the former requires a larger cross-section than the latter.

Indirect Cost Effects on Life-Cycle-Cost Effective Optimum Design of Steel Box Girder Bridge (강상자형교의 LCC 최적설계에 미치는 간접비용의 영향)

  • Lee, Kwang Min;Cho, Hyo Nam;Cha, Chul Jun;Eom, In Su
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.2 s.75
    • /
    • pp.115-130
    • /
    • 2005
  • This paper presents the effects of indirect costs on Life-Cycle-Cost(LCC) effective optimum design of steel-box girder bridges. The LCC formulations considered in the LCC optimization of the bridges consist of initial cost and expected rehabilitation costs including repair/replacement costs, loss of contents or fatality and injury losses, and indirect costs such as road user costs and indirect socio-economic losses. To demonstrate the LCC-effectiveness for optimum design of the bridges, an actual steel box girder bridge having two continuous spans(2@50m=100m) is considered as a numerical example. And also, in this paper, various sensitivity analyses are performed to investigate the effects of indirect costs caused by traffic conditions such as number of detour route, number of lane on detour route, length of detour route, and traffic volumes on the LCC-effective optimum design. From the numerical investigations, it may be concluded that indirect costs caused by traffic network may sensitively influence on the LCC-effective optimum design of steel-box girder bridges. Therefore, it may be stated that the traffic conditions should be considered as one of the important items in the LCC-effective optimum design of the bridges.

Lifetime Reliability Based Life-Cycle Cost-Effective Optimum Design of Steel Bridges (생애 신뢰성에 기초한 강교의 LCC최적설계)

  • Lee, Kwang Min;Cho, Hyo Nam;Cha, CheolJun;Kim, Seong Hun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1A
    • /
    • pp.75-89
    • /
    • 2006
  • This paper presents a practical and realistic Life-Cycle Cost (LCC) optimum design methodology of steel bridges considering time effect of bridge reliability under environmental stressors such as corrosion and heavy truck traffics. The LCC functions considered in the LCC optimization consist of initial cost, expected life-cycle maintenance cost and expected life-cycle rehabilitation costs including repair/replacement costs, loss of contents or fatality and injury losses, road user costs, and indirect socio-economic losses. For the assessment of the life-cycle rehabilitation costs, the annual probability of failure which depends upon the prior and updated load and resistance histories should be accounted for. For the purpose, Nowak live load model and a modified corrosion propagation model considering corrosion initiation, corrosion rate, and repainting effect are adopted in this study. The proposed methodology is applied to the LCC optimum design problem of an actual steel box girder bridge with 3 continuous spans (40 m+50 m+40 m=130 m), and various sensitivity analyses of types of steel, local corrosion environments, average daily traffic volume, and discount rates are performed to investigate the effects of various design parameters and conditions on the LCC-effectiveness. From the numerical investigation, it has been observed that local corrosion environments and the number of truck traffics significantly influence the LCC-effective optimum design of steel bridges, and thus realized that these conditions should be considered as crucial parameters for the optimum LCC-effective design.

Life-Cycle Cost-Effective Optimum Design of Steel Bridges Considering Environmental Stressors (환경영향인자를 고려한 강교의 생애주기비용 최적설계)

  • Lee, Kwang Min;Cho, Hyo Nam;Cha, Cheol Jun
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.2 s.75
    • /
    • pp.227-241
    • /
    • 2005
  • This paper presents a practical and realistic Life-Cycle Cost (LCC) optimum design methodology for steel bridges considering the long-term effect of environmental stressors such as corrosion and heavy truck traffics on bridge reliability. The LCC functions considered in the LCC optimization consist of initial cost, expected life-cycle maintenance cost, and expected life-cycle rehabilitation costs including repair/replacement costs, loss of contents or fatality and injury losses, road user costs, and indirect socio-economic losses. For the assessment of the life-cycle rehabilitation costs, the annual probability of failure, which depends upon the prior and updated load and resistance histories, should be accounted for. For the purpose, Nowak live load model and a modified corrosion propagation model, which takes into consideration corrosion initiation, corrosion rate, and repainting effect, are adopted in this study. The proposed methodology is applied to the LCC optimum design problem of an actual steel box girder bridge with 3 continuous spans (40m+50m+40m=130m). Various sensitivity analyses are performed to investigate the effects of various design parameters and conditions on the LCC-effectiveness. From the numerical investigation, it has been observed that local corrosion environments and the volume of truck traffic significantly influence the LCC-effective optimum design of steel bridges. Thus, these conditions should be considered as crucial parameters for the optimum LCC-effective design.