• Title/Summary/Keyword: Cost and Return

Search Result 447, Processing Time 0.026 seconds

Some Factors Affecting Profitability of Local Public Hospitals (지방의료원의 재무성과 영향요인)

  • Park, Jong-Young
    • Korea Journal of Hospital Management
    • /
    • v.12 no.3
    • /
    • pp.47-67
    • /
    • 2007
  • This paper aims at suggesting several ways lo change financial vulnerability and to improve managerial capability of local public hospitals (LPHs) in Korea through the identification of factors affecting profitability. Several findings of the research are as follows: To begin with, LPHs exhibited a statistically significant difference in their profitability from one another, according to tile analyses of their profitable margins from tile general characteristics. It depends on the number of hospitals in the area, the population of the hospital-built area, the number of competing hospitals, the number of staff per 100 beds, the opening of special clinic, the educational function, and the capacity of rooms. However, there was no variable in the managerial characteristics, presenting a significant difference, in contrast with hospitals which have been managed by private companies and made a great amount of profits. Second, according to the analyses of profit differences in behavioral effort-characteristics, a statistically significant difference was revealed upon the basis of the efforts to improve the clinic service, invite special patients, and shorten the period of being hospitalized. Third, the result of analyses about the difference of profitability from medical care and finance is statistically significant in the rate of labor cost, the rate of management cost, bed-occupancy rate, and the period of being hospitalized. Fourth, according to the analyses of the factors influencing the net profit ratio of the entire capital, Adjusted explanatory power(Adjusted $R^2$) was shown up to 65.2%, which is high. To compare the adjusted explanatory power stage by stage, the first stage model applying only two variables such as structural and strategic characteristics exhibited 23.8%, and the second stage model adding financial characteristics showed 51.5%. The explanatory power was much improved up to 65.2% when the third stage model incorporated the outcome of medical care performance. When the return on investment(ROI) was examined by using the multi-variate linear regression analysis at the final model of third stage, it was found that ROI had a positive relationship with the increase rate of patients, labor costs per doctor, and medical care rate of socially protected inpatients. However, it revealed that ROI had a negative relationship with the ratio of labor costs, the number of patients per managerial staff, and occupancy rate of rooms, respectively. The research suggests that in order for LPHs to increase profitability, LPH, should make efforts not only to attract patients to the hospitals without any discrimination of the patients depending on their financial status, but also to develop efficient management methods to reduce labor costs.

  • PDF

A Case Study of the Improvement of the Structural Work of a Logistics Facility by Using PC Member (PC부재에 의한 물류시설의 골조공사 개선사례 연구)

  • Kim, Seon-Hyung;Choi, Eun-Gyu;Kim, Sun-Kuk;Lee, Sung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.127-135
    • /
    • 2010
  • As logistics facilities have a high ceiling height, simple structure, and the need for a quick return on investment, it is usually essential to advance the construction schedule of such facilities. Accordingly, PC structures, which require less labor, cost and schedule, can be more competitive than RC structures. However, most construction companies in Korea are familiar with RC structure design, have negative perceptions regarding PC structures, and do not sufficiently adopt new construction techniques. The structure that this research features has 110 columns that are 14 m high and are built to the same specification, and applying an RC design to the structure will lead to issues related to constructibility, economic viability, project duration and safety. Therefore, this study intends to feature PC design as an alternative to the RC warehouse design, and perform a comparative analysis of the reduction in labor, cost and construction schedule to highlight benefits. The research outcomes herein will provide inputs to subsequent studies on new construction strategies to advance the construction schedule, improve quality and constructibility, enhance safety and save costs.

A Study on the Construction Demand for Network of Metro Railroad in Busan-Ulsan-Gyeongnam Area - In the place of National Road No.7 - (부울경 광역도시철도망 구축 필요성에 관한 연구 - 국도 7호선 중심으로 -)

  • Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.771-778
    • /
    • 2011
  • Preliminary feasibility study on Busan metro line #1 in Yangsan line (Nopo-Bukjeong) depending on active volume of mass transportation between Yangsan city and Busan city was conducted. As the study concluded that it's valid, the necessity to establish the metro railroad network connecting to Busan, Ulsan and Gyeongnam Province is demanded to improve the transportation issues in Ungsang area vulnerable to metro service and to drive the balanced development between metropolitan cities. In addition, the volume of transportation depending on methods in target areas and road traffic assignment are surveyed to put a stress on the necessity to establish the metro railroad network. As the demand of transportation for alternative lines is predicted, the budget and benefits for construction for each alternative line set for the rough economic analysis depending on traffic volume for each method and traffic assignment results. The total project budget necessary for construction of proposal line #1 set as effective one among target three lines in this project is calculated in 794.32 billion won. Construction accounts for the most expensive in expenses for project and contingency allowances, purchases for vehicles and collateral expense are followed in orders. However, compensation for lands is not counted. In particular, according to economic analysis in proposal #1, ratio of benefit/cost (B/C) is 0.584, net present value (NPV) is -217.47 billion won, the internal rate of return (IRR) is analyzed in 0.604 %. At the current stage, it is not economically feasible, but the B/C is 0.737 in long-term upon construction of Yangsan line between Wolpheong and Yongdang which is proposal line #3. Therefore, when Busan metro basic plan is reorganized to aim the benefit of residents in Ungsang area vulnerable to the metro service, we think it must be necessary to establish the metro railroad network connecting to Busan-Yangsan-Ulsan which is proposal line #2 by extending the existing Sinjeong line and including this task line in high-ranked plan related to metro railroad.

Heat Exchanging Performance as Affected by Arrangement of Heat Exchanging Pipe (열회수장치의 열교환 파이프배치 형식별 열교환 성능)

  • 윤용철;강종국;서원명
    • Journal of Bio-Environment Control
    • /
    • v.11 no.3
    • /
    • pp.101-107
    • /
    • 2002
  • This study was carried out to improve the performance of heat recovery device attached to exhaust gas flue connected to combustion chamber of greenhouse heating system. Three different units were prepared far the comparison of heat recovery performance; A-type is exactly the same with the typical one fabricated for previous study of analyzing heat recovery performance in greenhouse heating system, other two types (B-type and C-type) modified from the control unit are different in the aspects of airflow direction (U-turn airflow) and pipe arrangement. The results are summarized as follows ; 1. In the case of Type-A, when considering the initial cost and current electricity fee required for system operation, it was expected that one or two years at most would be enough to return the whole cost invested. 2. Type-B and Type-C, basically different with Type-A in the aspect of airflow pattern, are not sensitive to the change of blower capacity with higher than 25m$^3$.min$^{-1}$ . Therefore, heat recovery performance was not improved so significantly with the increment of blower capacity. This was assumed to be that air flow resistance in high air capacity reduced the heat exchange rate as well. Never the less, compared with control unit, resultant heat recovery rate of Type-B and Type-C was improved by about 5% and 13%, respectively 3. Desirable blower capacity of these heat recovery units experimented were expected to be about 25m$^3$.min$^{-1}$ , and at the proper blower capacity, U-turn airflow units showed better heat recovery performance than control unit. But, without regard to the type of heat recovery unit, it was recommended that comprehensive consideration of system's physical factors such as pipe arrangement density, unit pipe length and pipe thickness, etc., was required for the optimization of heat recovery system in the aspects of not only energy conservation but economic system design.

Reuse Technology Development and Economic Evaluation of Dyeing Wastewater Treatment Sludge (폐수처리슬러지의 재활용기술개발 및 경제성 평가 -B염색조합을 중심으로-)

  • 임재호;이정연
    • Resources Recycling
    • /
    • v.9 no.1
    • /
    • pp.36-43
    • /
    • 2000
  • This study was carried out for treatment and reuse of inorganic sludge from Fenton process at B dyeing wastewater treatment plant. The parameters for pilot-scale treatment system were derived from the results of this study. It was found that $COD_{cl}$ of the treated effluent became lower than 100 mg/l approximately on the optimal reaction condition. 2nd sludge which was generated after redissolving sludge was analyzed, and it showed that reduction ratio of ash in 2nd sludge and total dry sludge weight in comparison with current sludge were 85% and 65%. Also Fe salt in sludge was redissolved about 90~95% of initial Fe by weight. It was estimated almost ₩350,000,000 for sludge reuse process. It was estimated saving of about ₩1,300,000 per day (₩420,000,000 per year) in operating cost based on 30,000 $m^3$/d treatment, which these were about ₩430,000 per day in chemical, ₩1,100,000 per day in sludge transportation and ₩200,000 per day in equipment maintenance. Payback period with interest charge for investment cost was estimated about 10.5 months. Also, net present value (NPV) was ₩792,000,000 and internal rat of return (IRR) was about 110%.

  • PDF

Development of Model for Optimal Concession Period in PPPs Considering Traffic Risk (교통량 위험을 고려한 도로 민간투자사업 적정 관리운영기간 산정 모형 개발)

  • KU, Sukmo;LEE, Seungjae
    • Journal of Korean Society of Transportation
    • /
    • v.34 no.5
    • /
    • pp.421-436
    • /
    • 2016
  • Public-Private-Partnerships tend to be committed high project development cost and recover the cost through future revenue during the operation period. In general, long-term concession can bring on more revenue to private investors, but short-term concession less revenue due to the short recovering opportunities. The concession period is usually determined by government in advance or by the private sectors's proposal although it is a very crucial factor for the PPPs. Accurate traffic forecasting should be most important in planing and evaluating the operation period in that the forecasted traffic determines the project revenue with user fees in PPPs. In this regards, governments and the private investors are required to consider the traffic forecast risk when determining concession period. This study proposed a model for the optimal concession period in the PPPs transportation projects. Monte Carlo simulation was performed to find out the optimal concession period while traffic forecast uncertainty is considered as a project risk under the expected return of the private sector. The simulation results showed that the optimal concession periods are 17 years and 21 years at 5.5% and 7% discount level, respectively. This study result can be applied for the private investors and/or any other concerned decision makers for PPPs projects to set up a more resonable concession period.

Evaluation of Seismic Response of Multi-Story Frames for Multiple Ground Excitations (다중 가진에 대한 구조물의 지진응답 평가)

  • Choi, Hyun-Hoon;Christopoulos, C.;Kim, Jin-Koo
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.12 no.6
    • /
    • pp.35-45
    • /
    • 2008
  • To investigate the effects of residual displacement, the structural responses of buckling-restrained braced frames (BRBF) and special moment-resisting frames (SMRF) were evaluated for design-based excitations following an application of initial residual drift. The initial residual drift was applied to the structure in two ways. The first way was to simply apply the same earthquake record to the structure twice, with an appropriate pause between applications to allow the structural response from the first record to return to zero. The second way to apply the initial residual drift was to apply a pushover to the structure until it arrives at the desired residual drift value. According to the analysis results, the initial residual drifts had a significant effect on the responses of steel BRBF and SMRF. The responses of BRBF were more highly dependent on the initial residual deformation than the responses of SMRF. Therefore, in order to minimize the post-event repair cost, a reduction of residual drift is required.

The method of making Rule Cases to build Rule-Based System (규칙기반시스템의 구축에 필요한 규칙 발생 기법)

  • Zheng, BaoWei;Yeo, Jeongmo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2010.04a
    • /
    • pp.852-855
    • /
    • 2010
  • Tree type of Rule Case will be processed by the method that provide practical Rule Case to Rule Engine that is made with procedural language beforehand, then the Rule Engine according to the condition of the special Rule Case to return result in current Rule-Based System. There are two disadvantages in the method; the first is according to specific business rule after construct the Rule Engine when the business rule changing the Rule Engine also must be changed. The second is when Rule have many conditions the Rule Engine will become very complex and the speed of processing Rule Case will become very slow. In this paper, we will propose a simplified algorithm that according to the theory of ID Tree to produce Rules which be used in Rule-Based System. The algorithm can not only produce Rules but also make sure of satisfying change of business rule by execute the algorithm. Because it is not necessary to make a Rule Engine, we will anticipate effect of increasing speed and reducing cost from Rule-Based System of applying the algorithm.

Feasibility Study on the Construction of a Wood Industrialization Services Center for a Wood Industry Cluster Establishment in Jeollanam-do (전라남도 지역의 목재산업 클러스터 구축을 위한 목재산업화지원센터 설립의 타당성 검토를 위한 연구)

  • An, Ki-Wan;Park, Kyung-Seok;Ahn, Young Sang
    • Journal of Korean Society of Forest Science
    • /
    • v.102 no.4
    • /
    • pp.506-514
    • /
    • 2013
  • This study examined the feasibility on the construction of a wood industrialization service center for a wood industry cluster establishment in Jeollanam-do. Construction of the wood industrialization service center is based on a discount rate of 3.5%, an investment period of 4 years, a business operations period of 16 years and an investment cost of 24600 million won; the total amount of the net present value, the cost-benefit ratio and the internal rate of return were assumed to be 2.579 million won, 2.51%, and 10.1%, respectively. In addition, the production inducement coefficient, the induced production effect, the income-induced coefficient, the income inducement effect, the employment inducement coefficient, and the employment inducement effect were estimated 1.4345, 35287 million won, 0.1655, 4000.7 million won, and 0.4665, 1,145 people, in the effects of the wood related industries using the multi-regional input-output model, respectively. Financial independence of operating income to cover its own costs incurred in accordance with the operating project might be practicable.

Cost-Benefit Analysis on Marine Transportation Safety Facility Using CVM(Contingent Valuation Method) (CVM을 이용한 해상교통안전시설 투자 편익 분석)

  • Kim, Sooyeob;Lee, Gunwoo
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2014.06a
    • /
    • pp.73-75
    • /
    • 2014
  • Marine transportation facility is public goods for the general public and their safety. The study used the Contingent Valuation Method (CVM), a method to estimate economic value of non-market goods, such as environmental goods. In order to analyze economic effects of marine accidents preventable by the VTS, the study estimated costs caused by marine accident cases. It conducted surveys with people and shipping companies in local areas where VTS is to be established in the future. According to a survey with people in areas where marine transportation control center is to be built (Tongyoung), the yearly benefit from building new VTS is estimated at KRW 11billion. If fees are paid in the form of income tax for five years from 2014, corresponding benefits during the same period will reach KRW 47.3 billion in current value. An analysis on economic validity of VTS establishment in Tongyong showed the B/C ration stood at 3.193, far higher than 1. The Net Present Value (NPV) was KRW 32.5 billion and the Internal Rate of Return (IRR) turned out to be 37.4% which was higher than social discount rates of 53.5%. On balance, the establishment has reasonable economic validity.

  • PDF