• Title/Summary/Keyword: Cost and Return

Search Result 447, Processing Time 0.027 seconds

Authentication of Fast Handovers for Mobile IPv6 using Return Routability (Return Routability를 이용한 Fast Handovers for Mobile IPv6 인증기법)

  • Shin, Tea-Il;Mun, Young-Song
    • Journal of Internet Computing and Services
    • /
    • v.9 no.1
    • /
    • pp.1-8
    • /
    • 2008
  • IETF has proposed Fast Handovers for Mobile IPv6 (FMIPv6) for efficient mobility management, FMIPv6 has no solutions to protect binding updates. Previous researches have mainly concentrated on using AAA, public cerificates or cryptographic algorithms to secure binding updates. However the approaches need a particular infrastructure or a heavy processing cost to setup secure associations for handovers. Proposed scheem provides authentication for FMIPv6 without infrasturcture and costly cryptographic algorithms by extending Return Routability Protocol. Also proposed scheme is oble to be used for various existing handover mechanisms in IPv6 network.

  • PDF

A Study on Current Status and Improvement Plans of Ecosystem Conservation Fund Return Projects (생태계보전협력금 반환사업의 추진 현황과 개선 과제)

  • Cho, Dong-Gil;Kim, Sang-Wook
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.3
    • /
    • pp.63-72
    • /
    • 2010
  • This study was conducted to investigate the current status and the improvement plans of the ecosystem conservation fund return projects. In 2007, there was a reformation of the ecosystem conservation fund system but the fund return projects were not vitalized up until now. In this study, 35 of ongoing and finished fund return projects were investigated on their types, sites, costs, local governments, and time required to return the fund. Through the on-site survey of 9 finished projects (4 biotope, 2 corridor and 3 natural conservation facility projects), construction and management conditions were investigated. The main findings are as follows: Among the five fund return types, 17 cases were biotope restoration projects, 4 cases were ecological corridor projects, and 1 case was a nature replacement project. In the case of project sites, there were 14 cases near schools and public facilities, 8 cases near rivers or streams, and 2 cases near ponds or wetlands. For the construction costs, there were 19 cases (65% of all the projects) that cost less than 300 million won. In terms of the involvement of the local government, most of the fund return projects were concentrated in Gyeonggi province and Ulsan city, and there were some local governments outside of these regions that did not carry out any return projects at all. Lastly, in the case of fund return time required, 35% of the fund returns were completed within 5 months, but the overall average fund return time was 9.8 months. In respond to the above study results, the improvement plans to encourage fund return projects are as follows: To diversify return types and sites, piloting and modeling projects for the representative types and sites should be preceded. To emerge from customary small-scaled projects, incentives to encourage large-scale and ecological networking projects should be considered. In addition, in order to write up business plans for the fund return projects, long-term investigations of at least 2 seasons from spring to fall are necessary. Finally, for the continuous management and maintenance of the ecological fund return sites, easier way for the citizens to actively participate in the projects should be incorporated.

The Case Study on the Performance between SCM Adopted Textile.Fashion Firms and Unadopted Firms in a Viewpoint of BSC (BSC 관점에서 SCM 도입 섬유.패션 기업과 미도입 기업의 성과에 대한 사례 연구)

  • Shin, Sang-Moo;Yoon, Jae-Chun
    • The Research Journal of the Costume Culture
    • /
    • v.17 no.1
    • /
    • pp.177-188
    • /
    • 2009
  • SCM as the important marketing strategy enhance the firm's efficiency and compatibility in global market environment such as global outsourcing. Firms adopted SCM realized the need to evaluate precisely the performance of SCM. In spite of importance of SCM, there was not much intention and research to measure SCM performance in textile fashion industry. Therefore, the purpose of this case study was to measure performance of supply chain management in textile fashion business using BSC(Balanced Score Card) to measure not only financial perspective but also non-financial perspectives such as customer perspective, internal business perspectives, financial perspective, and innovation & learning perspective. The questionnaire developed by the reviews of the literature was adopted for this study. The results of this study showed that SCM performance was enhanced from the point of customer perspective(cost, quality, time, service), financial perspective(cash cycle time, inventory turn over, inventory obsolescence, return on asset, return on investment, capacity utilization), and innovation & learning perspective(cost for human resource management, service for human resources). But there was same performance level regarding internal business perspective(lead time, cost for manufacturing process, product quality control, productive flexibility for time, quantity, and variety). Therefore, we should keep close relationship and two way communication among supply chain members to promote better SCM performance.

  • PDF

Economic Feasibility of Automatic Egg Washer (계란 자동세척기의 경제적 타당성 평가)

  • Lin, Qing-Long;Yeo, Jun-Ho
    • Current Research on Agriculture and Life Sciences
    • /
    • v.32 no.3
    • /
    • pp.165-169
    • /
    • 2014
  • This study assessed the economic feasibility of an automatic egg washer. Based on various cost benefit analysis methods, including the net present value (NPV), internal rate of return (IRR) and benefit cost ratio (B/C Ratio), the automatic egg washer was confirmed to have economic feasibility. The NPVs were 38,565,991 won at 5% discount rate and 32,013,916 won at 10% discount rate, respectively. The IRRs were 1.325 at 5% discount rate and 1.299 at 10% discount rate, respectively. Finally, the B/C ratios were 1.726 at 5% discount rate and 1.699 at 10% discount rate.

Economic Assessment of Manganese Nodules Mining (심해저 망간단괴 사업의 경제성 평가)

  • Hwang, Seog-Won;Hwang, Jung-Tae
    • The Sea:JOURNAL OF THE KOREAN SOCIETY OF OCEANOGRAPHY
    • /
    • v.13 no.3
    • /
    • pp.260-270
    • /
    • 2008
  • The economics of manganese nodules mining was assessed based on 36 scenarios which reflect recent changes of the metal market. Those scenarios included optimistic/neutral/pessimistic prospect for the cost, 2 production scales(1.5 MT and 3 MT) and 6 assumptional paths of future metal prices. A large part of scenarios, in which optimistic or neutral prospect for the cost and metal prices were assumed, showed good economic feasibility of the project. For example, 37.12% of Internal Rate of Return(IRR) was obtained in the scenario of 3 MT production, neutral cost prospect and present metal price maintained in the future.

A Study on the Economic Evaluation of Photovoltaic System in the Residential Building (주거용 건물의 태양광 발전시스템 경제성 평가에 관한 연구)

  • Choi, Jeong-Min;Ju, Jai-Wook;Kim, Dong-Gyu
    • Journal of the Korean Solar Energy Society
    • /
    • v.29 no.6
    • /
    • pp.14-21
    • /
    • 2009
  • The demand and installation for photovoltaic system(namely, PV) has grown steadily in Korea. However, the PV system has a various economic viability according to the PV system characteristic variables such as inverter efficiency, miscellaneous power conditioning losses, azimuth and slope of PV array, PV tracking mode, and so on. The other variables are the monthly consumed electric energy and economic related factor such as initial cost, government subsidy, maintenance cost, inflation rate, energy cost escalation rate, discount rate, etc. Therefore, this study is to present economic evaluation of PV system with those concerned factors by calculating internal rate of return, year-to-positive cash flow and net present value indices.

Economic Valuation for Nursery-Phase Production - Focusing on the tidal flat Oyster - (해면 중간육성 생산방식의 경제성 분석 - 갯벌 참굴 산업을 중심으로 -)

  • Choi, Jong-Du
    • The Journal of Fisheries Business Administration
    • /
    • v.43 no.3
    • /
    • pp.31-41
    • /
    • 2012
  • This paper was conducted to study the economic valuation for Nursery-Phase production of the tidal flat oyster in Korea. Benefit-cost(B/C) model used to indicate the effects of economic valuation. Using discounting rates(i.e., 4.5%, 6.5% and 8.5%), the model compared revenues and costs that occur at different times from 2012 to 2018. This study also estimated various submodels, which are Benefit Cost Ratio(B/C ratio), Net Present Value(NPV), Internal Ration of Return(IRR), to compare profit of Nursery-Phase production styles and analyzed returns to evaluate the scenarios. Sensitivity analysis were conducted for various scenarios. The results suggest as follows. First, the oyster spat to the shell height of 3~5cm was more profit than the shell height of 1~3cm. Second, all of sensitivity analysis with submodels were economic valuation such that B/C ratio > 1, NPV > 0 and IRR > discounting rate. Third, the payback period was about 3years after installed Nursery-Phase production system.

Benefit Cost Analysis of Automatic Eggshell Crack Detection System (계란 실시간 자동 파각란 검사시스템의 비용 편익분석)

  • Lin, Qing-Long;Yeo, Jun-Ho
    • Current Research on Agriculture and Life Sciences
    • /
    • v.32 no.4
    • /
    • pp.231-235
    • /
    • 2014
  • This study performed a benefit cost analysis of an automatic eggshell crack detection system. Based on various cost benefit analysis methods, including the net present value (NPV), internal rate of return (IRR), and benefit cost ratio (B/C Ratio), the automatic eggshell crack detection system was confirmed to have economic validity. The NPVs were 175,035,645 won at a 5% discount rate and 129,082,393 won at a 10% discount rate. Plus, the IRRs were 0.686 at a 5% discount rate and 0.660 at a 10% discount rate. Finally, the B/C ratios were 1.981 at a 5% discount rate and 1.900 at a 10% discount rate.

A Study on the Determination of Economic Life of Weapon System by using the PRICE Model (PRICE 모텔을 이용한 무기체계 경제수명 결정에 관한 연구)

  • Kim Seung-Soo;Kang Sung-Jin
    • Journal of the military operations research society of Korea
    • /
    • v.30 no.2
    • /
    • pp.13-31
    • /
    • 2004
  • This paper aims at efficient determining the economic life of weapon systems. Specifically, the procedure to estimate the life cycle cost at initial acquisition state or at development state using the PRICE model is proposed. The PRICE model is a parametric cost estimation which is widely used in the field of national defense. The model includes the estimation of the cost in life cycle of weapon systems such as research and development, acquisition, operation and support. Using this model, economic life of weapon systems can be determined. Based on an equivalent annual cost (EAC) method which sums the capital recovery with return (CR) and the equivalence cost (EC), the economic life will be calculated. A case study is accomplished to illustrate the proposed procedure.

Estimation of Partial Safety Factors and Target Failure Probability Based on Cost Optimization of Rubble Mound Breakwaters (경사식 방파제의 비용 최적화에 기초한 부분안전계수 및 목표파괴확률 산정)

  • Kim, Seung-Woo;Suh, Kyung-Duck;Burcharth, Hans F.
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.22 no.3
    • /
    • pp.191-201
    • /
    • 2010
  • The breakwaters are designed by considering the cost optimization because a human risk is seldom considered. Most breakwaters, however, were constructed without considering the cost optimization. In this study, the optimum return period, target failure probability and the partial safety factors were evaluated by applying the cost optimization to the rubble mound breakwaters in Korea. The applied method was developed by Hans F. Burcharth and John D. Sorensen in relation to the PIANC Working Group 47. The optimum return period was determined as 50 years in many cases and was found as 100 years in the case of high real interest rate. Target failure probability was suggested by using the probabilities of failure corresponding to the optimum return period and those of reliability analysis of existing structures. The final target failure probability is about 60% for the initial limit state of the national design standard and then the overall safety factor is calculated as 1.09. It is required that the nominal diameter and weight of armor are respectively 9% and 30% larger than those of the existing design method. Moreover, partial safety factors considering the cost optimization were compared with those calculated by Level 2 analysis and a fairly good agreement was found between the two methods especially the failure probability less than 40%.