• 제목/요약/키워드: Cost Risk Analysis

검색결과 662건 처리시간 0.037초

터널사고 재난 안전비용 분석 방법에 관한 연구 (A Study on the Analysis Method of Safety Cost of Tunnel Accident)

  • 백충현
    • 대한안전경영과학회지
    • /
    • 제23권1호
    • /
    • pp.23-30
    • /
    • 2021
  • This paper analyzed a survey of 388 general target samples to analyze the correlation between disaster safety costs and human risk factor analysis and evacuation behavior due to tunnel accidents. Considering the impact of the tunnel accident on disaster safety costs and the correlation between human evacuation and risk factors in the tunnel environment, the system should be reorganized to reflect the tunnel's basic plan, tunnel cross-section, tunnel installation.

추가안전대책비용, 사고위험대응비용의 외부비용을 반영한 원전비용 추정 연구 (Analysis for External Cost of Nuclear Power Focusing on Additional Safety and Accident Risk Costs)

  • 김윤경;조성진
    • 자원ㆍ환경경제연구
    • /
    • 제22권2호
    • /
    • pp.367-391
    • /
    • 2013
  • 후쿠시마원자력발전소의 사고를 계기로 원전의 안전대책비용, 사고위험대응비용과 같은 외부비용들의 존재가 부각되고 있다. 이에 본 연구는 원전의 외부비용들 중에서 추가안전대책비용과 사고위험대응비용을 추정하고, 이를 발전원가 및 전기요금에 반영하여 변화정도를 살폈다. 원전의 추가안전대책비용은 70~90%의 이용률에서 0.53원/kWh~0.80원/kWh으로 원전의 발전원가에 큰 영향을 미치지는 않는다. 사고위험대응비용은 원전사고피해규모별, 사고발생빈도별, 이용률별로 0.0025원/kWh~26.4188원/kWh로 추정되었다. 사고위험대응비용을 포함시키면 원전발전원가는 47.58원/kWh~85.92원/kWh가 된다. 2011년을 기준으로 사고위험대응비용을 내부화한 경우의 전기요금의 증가율은 70~90%의 이용률에서 0.001%~10.0563% 로 추정되었다. 본 연구는 원전의 외부비용을 내부화하는 방법으로서 외부비용을 발전원가에 포함하여 전기요금에 반영하였다. 본 연구는 지금까지 우리나라에 논의되지 않았던 원전 외부비용을 내부화하는 방법의 하나가 될 것이다.

종합건설사 실행예산 편성 시 리스크 비용 산정에 관한 인식 및 실태에 관한 연구 - 건축공사를 중심으로 - (A Study on the Perceptions and Current Practices in Estimating Risk Cost of Contractor's Construction Budget - Focused on Building Projects -)

  • 최정원;김한수
    • 한국건설관리학회논문집
    • /
    • 제23권3호
    • /
    • pp.13-24
    • /
    • 2022
  • 건설공사는 다양한 리스크에 노출되어 있으며, 건설공사의 리스크는 더욱 증가하는 경향을 보이고 있다. 건설공사의 리스크 증가는 건설사의 리스크 예측 및 대응의 중요성을 더욱 증가시키고 있다. 건설사가 건설공사의 리스크를 대응하는 방법 중 하나는 리스크 비용을 사전에 예측 또는 산정하여 이를 실행예산에 반영하는 것이다. 리스크 비용과 관련하여 다양한 연구들이 수행되어 왔지만, 국내 건설사의 실행예산 편성 시 리스크 비용 산정에 관한 인식과 실태에 관한 분석은 미흡한 것으로 나타났다. 본 연구의 목적은 종합건설사의 실행예산 편성 시 리스크 비용 산정과 관련된 인식과 실태를 조사·분석하여 주요 특징 및 시사점을 도출하는데 있다. 본 연구의 주요 결과를 요약하면 실행예산 편성 시 리스크 비용 반영의 중요성에 대한 인식은 상당히 높았으나, 상대적으로 리스크 비용을 산정하는 수준은 상대적으로 미흡한 것으로 나타났다. 리스크 비용 산정을 효과적으로 수행하기 위해서는 실적 데이터, 가이드라인, 전사적 표준절차 등 실무기반이 구축되어야 하며, 충분한 견적기간도 할애될 필요가 있었다. 또한 리스크 비용 산정을 위해 빅데이터 분석기법을 포함한 정교한 분석기법의 활용에 대한 관심은 높지만 현재 준비 및 활용 수준은 낮은 것으로 나타나 이에 대한 실무 적용성을 높이기 위한 연구개발이 필요하다고 할 수 있다.

건설공사를 위한 위험분석기법 사례연구 (A Case Study on Risk Analysis of Large Construction Projects)

  • 김창학;박서영;곽중민;강인석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.1155-1162
    • /
    • 2004
  • This research proposes a new risk analysis method in order to guarantee successful performance of construction projects. The proposed risk analysis methods consists of four phases. First step, AHP model can help contractors decide whether or not they bid for a project by analysing risks involved in the project. Second step, the influence diagraming, decision tree and Monte Carlo simulation are used as tools to analyze and evaluate project risks quantitatively. Third step, Monte Carlo simulation is used to assess risk for groups of activities with probabilistic branching and calendars. Finally, Fuzzy theory suggests a risk management method for construction projects, which is using subjective knowledge of an expert and linguistic value, to analyze and quantify risk. The result of study is expected to improve the accuracy of risk analysis because three factors, such as probability, impact and exposure, for estimating membership function are introduced to quantify each risk factor. Consequently, it will help contractors identify risk elements in their projects and quantify the impact of risk on project time and cost.

  • PDF

건설공사 하도급 입찰단가 산정에 영향을 미치는 리스크 요인의 중요도 분석 (An Analysis of the Importance of the Risk Factors Influencing the Calculation of the Subcontract Construction Bidding Cost)

  • 이성구;박태근
    • 한국건설관리학회논문집
    • /
    • 제8권2호
    • /
    • pp.109-117
    • /
    • 2007
  • 건설산업의 환경은 대형화, 전문화의 추세와 공사이행기간의 증가와 건설공사의 입찰에 있어서 중요한 리스크 요인과 불확실 요인이 존재하게 되었으며 하도급자의 판단오류 및 인식부족은 이윤감소 혹은 적자를 초래하게 되며, 이는 결과적으로 하도급자에게 재정적 부담을 주게된다. 따라서 입찰단계에서의 리스크요인에 의한 공사예비비 산정을 예측하고 계약의 합의와 이행 과정에서 하도급자의 목표이윤 확보를 고려한 입찰단가를 산정하는 것은 매우 중요하다. 이러한 취지에서 본 연구는 하도급자의 공종별 사례로 선정하여 입찰금액 산정에 미치는 리스크에 대한 중요도가 공사비에 미치는 영향정도를 기초로 하여 분석하고, 이를 바탕으로 하도업자의 합리적인 입찰전략을 수립하는 기초자료로 활용하는데 있다.

COCOMOII의 cost driver를 이용한 PCD결과의 위험분석 (Risk analysis using PCD result and cost driver of COCOMOII)

  • 박지협;이은서;장윤정;이경환
    • 한국정보과학회:학술대회논문집
    • /
    • 한국정보과학회 2002년도 가을 학술발표논문집 Vol.29 No.2 (2)
    • /
    • pp.10-12
    • /
    • 2002
  • 본 논문에서는 신뢰성 있는 소프트웨어 개발을 위한 위험분석 방법을 모색한다. 기존의 프로세스 능력 결정(PCD: Process Capability Determination)결과의 차이를 이용한 전체 위험결정 방법의 취약점을 보안하기 위해 MBASE(COCOMOII)I에서 제시하는 위험분석 방법을 이용한다. 이 과정에서 필수적으로 수행되어야 할 과제는 레벨의 MP(Management Practice)단위 속성과 cost driver를 매핑함으로써 개별 위험항목(risk item)을 얻는 것이다. SPICE 레벨4 단계를 예로 cost driver를 추출하고 rating 결과를 입력하여 위험요소의 우선순위를 결정하며, 결정된 위험 우선순위에 따라 위험을 제거할 경우 전체 위험이 급격히 감소되어 RE(Risk Exposure) 그래프의 하강 곡선을 따름을 증명하였다. 이러한 산정결과를 통해 레벨에 영향을 미치는 위험 속성 및 위험 제거시 전체위험의 감소율을 예상할 수 있다.

  • PDF

가스 공급기지에서 FMEA/HAZOP에 의한 안전관리 비용-편익분석 (Cost and Benefit Analysis for Safety Management Cost by FMEA/HAZOP at Governor Station)

  • 장서일;이헌창;조지훈;오신규;김태옥
    • 대한안전경영과학회지
    • /
    • 제3권4호
    • /
    • pp.1-9
    • /
    • 2001
  • Cost-benefit analysis was investigated to propose the analysis method of the effect of investment and the optimum investment level of safety management cost for preventing gas accident in the B governor station. From five classifications of safety management costs consisting of cost items with similar characters and potential accident costs calculated by risk assessments(FMEA/HAZOP), we found that the order of the benefit(the reduction cost of the potential accident cost) was the instrument increase and repair cost > the safety checking and inspection cost > the labor and training cost > the safety equipment and corresponding cost > the research and development cost. As the benefit was increased with increasing the investment cost, the effect of investment was increased with decreasing the Investment cost. As a result, the optimum safety management cost was estimated and the investment level was analyzed by the model of optimum investment level.

  • PDF

해외 프로젝트 시공단계 리스크 요인의 실제 비용 초과 영향과 현장관리자 인식 차이 분석 (A Comparative Analysis of Risk Impacts on Cost Overrun between Actual Cases and Managers' Perception on Overseas Construction Projects)

  • 이경태;안한나;김재원;김주형
    • 한국건설관리학회논문집
    • /
    • 제22권3호
    • /
    • pp.52-60
    • /
    • 2021
  • 국내 시공사의 해외 건설 비중이 증가하면서, 발생하는 리스크로 인한 비용초과는 시공사의 재정 상황에 막대한 영향을 끼친다. 특히, 현지 관리자의 올바른 시공단계의 리스크 인식은 실질적인 관리에 영향을 끼친다. 그러나 실제 사례에서 발생한 리스크 요인의 비용초과 영향도와 현장 관리자의 인식도에는 차이가 있다. 따라서 이 연구는 리스크 관리를 위한 비용초과 대응전략 구축 이전에 해외 건설 시공단계 리스크 요인을 기반으로 실제 사례와 현지관리자의 인식도 비교를 목표로 한다. 우선, 이론고찰을 통해 선별된 리스크 요인을 기반으로 20개 사례에서 발생한 290개의 비용초과 데이터 기반으로 몬테카를로 시뮬레이션을 통해 추가 데이터를 획득한 후, 다중회귀분석으로 얻을 수 있는 표준화계수를 통해 요인별 비용초과 영향도를 구하였다. 또한, 42명의 현지관리자를 대상으로 동일 요인에 대한 인식도 파악을 위해 설문조사 진행 후, SWARA를 활용하여 분석하였다. 두 데이터 비교 결과, '하청업체와의 갈등', '현지 커뮤니티와의 갈등' 등의 갈등 관련 리스크들이 높은 비용초과를 보인다. 그러나 현지관리자들은 이를 낮은 순위로 인식하며, '자재 가격의 변동', '시공 품질 오류' 등에 대해 높은 순위로 인식하고 있었다. 따라서 현지관리자들의 갈등 리스크에 대한 교육과 관심이 필요하다.

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF

전기철도 전철전력설비의 위험도 평가 기반 안전관리에 관한 연구 (A Risk Assessment Approach to Safety Management of Electric Railway Facilities)

  • 장윤석;최규형
    • 전기학회논문지
    • /
    • 제58권5호
    • /
    • pp.960-967
    • /
    • 2009
  • Power supply system of electric railway has a diversity of safety problems since it should supply high electric power to the trains moving high speed with a lot of passengers on board. This paper provides a risk assessment approach to safety management of the electric railway facilities. Construction of database from field accident information, risk assessment and management of the risk are carried out systematically to ensure the safety. The risk assessment includes hazard identification, cause analysis by FTA(Fault Tree Analysis), consequence analysis by EVA(Event Tree Analysis), and loss analysis. In terms of the severity and the probability of the accidents deduced by these analyses, the risk of the accidents is assessed by using a risk matrix designed for electric railway facilities. Based on the risk assessment, possible risk mitigation options are identified and evaluated by analyzing their impact on the risk reduction and their cost benefit ratio. The long-term safety of the electric railway facilities can be ensured by renewal of the risk assessment and the risk mitigation option analysis with continuous accident database update. The proposed approach is applied to the electric railway facilities of Korean railway based on the accident data from 2002 to 2008.