정량적 위험성 평가에 의한 안전관리 투자의 비용-편익분석 (Cost-Benefit Analysis for Safety Management Cost using Quantitative Risk Analysis)

  • 장서일;조지훈;김태옥
    • 대한안전경영과학회지
    • /
    • 제4권4호
    • /
    • pp.15-26
    • /
    • 2002
  • The quantitative evaluation method of the safety management cost was suggested to prevent a gas accident as a major industrial accident. In a gas governor station, process risk assessments such as the fault tree analysis(FTA) and the consequence analysis were performed. Based on process risk assessments, potential accident costs were estimated and the cost-benefit analysis(CBA) was performed. From the cost-benefit analysis for five classification items of safety management cost, the order of the cost/benefit ratio was estimated.

비용과 일정의 결합확률 분포를 적용한 위험비용추정에 관한 연구 (A Study on Cost Risk Estimation applying Joint Cost-Schedule Probability Distribution Model)

  • 김동규;강성진;한규식
    • 한국군사과학기술학회지
    • /
    • 제14권5호
    • /
    • pp.850-858
    • /
    • 2011
  • The risk analysis plays an important role in weapon system acquisition project due to uncertainties in the acquisition process. But in domestic, studies on risk analysis are insufficient and risk cost is not included in acquisition budget in policy. Therefore, in this study, we suggest a method that measures risk or success probability of project using the stochastic model. In particular, in order to calculate the success probability, we apply the joint probability distribution model of cost and schedule that are critical factors influencing the project risk. And also we verify the applicability of this model in Korean defence industry environment through case studies.

건설 프로젝트의 코스트 리스크 분석방법론에 관한 연구 (A Study on the Cost Risk Analysis Method for Construction Projects)

  • 이동운;김영수
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.201-211
    • /
    • 2003
  • 불확정 요소가 많은 건설 프로젝트에서 코스트 리스크의 분석은 관련 전문가의 통찰력이나 주관적 판단에 의존하는 경우가 많다. 하지만 국내 건설산업의 경우 코스트 리스크 분석시 객관적인 산출근거에 의한 확률만을 고려 할 뿐 계량적 측정이 어려운 주관적 요소를 합리 적으로 반영하기 위한 방법이나 절차를 갖고 있지 못하다. 이와 같은 관점에서 본 연구는 보다 신뢰성이 우수한 비용견적을 위해서 전문가의 주관적인 요소까지 종합적으로 평가하고, 리스크로 인한 비용의 변동을 정량적으로 분석할 수 있는 새로운 로스트 리스크 분석모델을 제시하였다 아울러 실무에서도 간단한 절차에 따라 모델을 체계적으로 수행할 수 있도록 편리한 사용자 인터페이스를 제공해 주는 프로토타입을 구현하였다.

노후 공동주택의 위험요인을 고려한 확률적 유지관리비 분석 개념 (A Concept of Probabilistic Maintenance Cost Analysis Considering Risk Factors of Aged Multi-Family Housing)

  • 박문선;원서경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.246-247
    • /
    • 2019
  • This study was conducted to provide useful information to enable planned repair and cost planning during the operation and maintenance phase of aged multi-family housing. For this purpose, The concept of probabilistic maintenance cost analysis considering the risk factors of the aged multi-family housing is presented in the following six steps. 1. Risk factor investigation and analysis 2. Classification and deriving of maintenance cost 3. Investigation and deriving cost maintenance cost of old apartment house 4. Analysis of expert questionnaire 5. Analysis of Monte -Carlo simulation 6. Probabilistic maintenance cost Deriving the result. This study has limitations that need to be verified by applying actual data.

  • PDF

위험을 고려한 응용소프트웨어의 유지관리비용 산정모델에 관한 연구 (A Study on the Maintenance Cost Estimation Model for Application Software by Considering Risks)

  • 정형종;구은영;한경석
    • 한국IT서비스학회지
    • /
    • 제14권3호
    • /
    • pp.67-84
    • /
    • 2015
  • Software is more diverse and complex and the level of importance for the maintenance of application software to securely operate software is also gradually increasing in proportion. The calculation method for maintenance cost of application software applied in Korea public enterprises is involved in the range of 10 to 15% of development cost, depending on the Software Project Cost Estimation Guide. Moreover, as most software maintenance cost estimation procedures do not take into consideration of the risk factors related of maintenance, it can be seen as a main cause for the occurrence of maintenance related accidents. This study proposes a maintenance cost estimate model that takes into consideration of the risks related to the software maintenance activities to improve and resolve issues arising from the estimation of maintenance cost. In doing so, maintenance risk factors are analyzed and a risk index is derived through the analysis of risk levels based on the risk factors. Based on such analysis, a maintenance cost estimate method which reflects the maintenance risk index was established.

A decision support system (DSS) for construction risk efficiency in Taiwan

  • Tsai, Tsung-Chieh;Li, Hsiang-Wen
    • Smart Structures and Systems
    • /
    • 제21권2호
    • /
    • pp.249-255
    • /
    • 2018
  • Many studies in risk management have been focused on management process, contract relation, and risk analysis in the past decade, but very few studies have addressed project risks from the perspective of risk efficiency. This study started with using Fault Tree Analysis to develop a framework for the decision-making support system of risk management from the perspective of risk efficiency, in order for the support system to find risk strategies of optimal combination for the project manager by the trade-off between project risk and cost of project strategies. Comprehensive and realistic risk strategies must strive for optimal decisions that minimize project risks and risk strategies cost while addressing important data such as risk causes, risk probability, risk impact and risk strategies cost. The risk management in the construction phase of building projects in Taiwan upon important data has been analyzed, that provided the data for support system to include 247 risk causes. Then, 17 risk causes were extracted to demonstrates the decision-making support system of risk management from the perspective of risk efficiency in building project of Taiwan which could reach better combination type of risk strategies for the project manager by the trade-off between risk cost and project risk.

적외선 검출기 개발가능성 및 대안 분석 연구 (A Study on Feasibility Analysis and Alternatives for Infrared Detector Development)

  • 김경수;민성기;김철환
    • 시스템엔지니어링워크숍
    • /
    • 통권4호
    • /
    • pp.123-134
    • /
    • 2004
  • This paper deals with the feasibility analysis and alternatives for infrared detector development. The purpose of this paper analyze development requirement and feasibility study in both technology and cost. We get raw input data for system engineering process from development and technical expert, and then analyze cost and technology for development feasibility, and alternative study. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 to 2008 year. Technical level is analyzed by TRL(Technical Readiness Level) and AOA(Analysis of Alternative) is done by development and production cost estimate. We use SEER-H tool for cost estimate, that is parametric cost estimate tool based on Knowledge Base. Also this paper presents risk analysis for project management because it is necessary to risk driver management during the infrared detector development. The result of IR Detector feasibility and alternative study will be used in technical and cost analysis. This study can help those who are related to the cost analysis and development feasibility of other weapons

  • PDF

위험도 분석을 이용한 철도투자사업 경제성평가 적용방안 (Application of Risk Analysis for Economic Evaluation of Railroad Investments)

  • 이호;서선덕
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 춘계학술대회 논문집
    • /
    • pp.44-51
    • /
    • 2001
  • To account for uncertainties involved in an economic analysis of project, sensitivity analysis are usually being done in Korea. Though useful for policy analysis, but it larks explicit consideration of probability of occurring certain events considered in the sensitivity analysis. Risk analysis otherwise can explicitly account for the probability of certain event which has dire impact on project viability, such as cost, discount rate, and size of benefit. This paper reports experience of applying risk analysis method for economic evaluation of railroad investment. Probability distribution of event has paramount impact on the risk analysis results, while not many prior researches dealt with these issues. Probability distribution of rolling stock cost and operating cost, in addition to those cost variables, are developed considering railway demand in this study. Case study results are reported. Issues in applying risk analysis are reported in addition to further research direction.

  • PDF

정보보안 예산 수립에서 퍼지 AHP의 적용을 통한 위험 비용 분석 (Cost Risk Analysis for Preparing Budgets of Information Security using Fuzzy AHP)

  • 류시욱;허덕규
    • 대한안전경영과학회지
    • /
    • 제14권3호
    • /
    • pp.119-126
    • /
    • 2012
  • Recently, the breakdown of online banking servers and the leakage of customer information give rise to much concern about the security of information systems in financial and banking companies in Korea. The enforcement of security for information system becomes much more important issue than earlier. However, the security reinforcement of information system is restricted by a budget. In addition, the activities' cost to secure information system from threatening are under uncertain circumstances and should be established by a human decision maker who is basically uncertain and vague. Thus, making the budget for information system is exposed to any extent of the risk for these reasons. First, we introduce brief fuzzy set theory and fuzzy AHP (Analytic Hierarchy Process) methodology. Then, the cost elements that comprise yearly budget are presented and the priorities among the cost elements are calculated by fuzzy AHP. The cost elements that are exposed to risk are evaluated from the both perspectives of the risk impact and risk occurrence possibility which are expressed as linguistic terms. To get information on the risk profiles-pessimistic, most likely, and optimistic-for each cost element, the evaluation is accomplished and the result is presented. At last, the budget ranges-minimum, mode, maximum-for each cost element are estimated with the consideration of the risk profiles.

R & D 프로젝트의 위험분석모형의 연구 (A Risk Analysis Model Using VERT for R & D Project Management)

  • 황홍석
    • 한국경영과학회지
    • /
    • 제20권1호
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.