• Title/Summary/Keyword: Cost Index

Search Result 1,225, Processing Time 0.025 seconds

Development of the DRG Adjust Index for Nursing Care Quality Assurance (간호의 질 보장을 위한 DRG 보정지수 개발)

  • Kim, Sea-Wha;Kim, Yun-Mi
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.10 no.1
    • /
    • pp.1-9
    • /
    • 2004
  • Korean health insurance has adopted preliminary DRG payment system through 8 DRGs from 1997. But present DRG payment system gives economic incentives for hospitals to hire less nurse. This study was attempted to develope DRG adjust index to differentiate DRG price by nurse staffing level for nursing care quality. Method: We analyzed inpatient care cost by medical institute and developed DRG adjust index to differentiate DRG price by nurse staffing level. Results: Among same medical institute, inpatient care cost are very different according to hospital's nurse staffing level. In the case of casarean section, inpatient care cost of the 1st grade general hospital are more expensive 85,732won than the 6th grade hospital. The cost difference are 8.24% of total casarean section DRG price and 16.48% of DTG variable price. We developed DRG adjust index-a to apply DRG variable price and index-b to apply DRG total price for compensation cost difference of hospitals. Conclusions: DRG price adjust index will give economic incentive for hospitals to hire more nurse and improve nursing care quality.

  • PDF

The Effects of Water-Based Exercise on Physiological Cost Index and Balance in Stroke Patients

  • Park, Seung-Kyu;Park, Sam-Heon
    • The Journal of Korean Physical Therapy
    • /
    • v.26 no.6
    • /
    • pp.411-417
    • /
    • 2014
  • Purpose: This study attempts to find the effects of water-based exercise performed on stroke patients in their physiological cost index and static and dynamic balance. Methods: The subjects were 30 stroke patients, who were randomly divided a water-based exercise group and a land-based exercise group, each with 15 patients. Both exercises ware performed 3 day per week, for 40 minutes a day, for a period of eight weeks. Results: The Water-based exercise group showed a decreased physiological cost index compared to the land-based exercise group, with the physiological cost index of the water-based exercise group decreasing, while the land-based exercise group, showing a significant decrease. Water-based exercise increased static and dynamic balance capacity better than land-based group, showing a significant difference and better efficiency of water-based exercise when compared to land-based exercise. Conclusion: From the result of the study, we found that water-based exercise is more effective in improving PCI and static and dynamic balance capacity. Through this study, training in water-based stroke patients could use cardiovascular endurance and buoyancy and the vortex, as an effective treatment that can enhance the growth and voluntary participation in the range of the patient's own movement the thought is, in consideration of the changes in the physiological cost index due to the difference in the ground and water, and should establish a training program that matches the purpose.

A Basic Study for Developing the Construction Cost Index by Directly Surveying the Cost Input Structure in Korea - Focused on Highway Construction Projects - (원가투입구조의 직접 조사에 의한 국내 건설공사비지수 개발을 위한 기초연구 - 도로시설물 중심으로 -)

  • Kim, Woo-Young;Yi, June-Seong;Lee, Young-Hwan;Lee, Bok-Nam;Kim, Yoon-Joo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.53-61
    • /
    • 2006
  • Korean Government started to publish Korean CCI(Construction Cost Index) again at February 2004 since CAK(Construction Association of Korea) stopped publishing it 1994. CCI is developed using the verified statistical data, that is, input-output table and producer price index by Korean Bank and labor unit cost by CAK. Though the method is available as it uses the verified statistical data, there is a limitation to reflect the characteristics of construction. For overcoming this limitation, this study suggests CCI development method investigating the input structure of labor and material cost for each type of construction project and applying the cost variations of the items.

Development of Outage Cost Impact Index Function of Electricity Energy and Outage Cost Assessment using WOROCAIS (전력에너지 공급지장비의 충격도지수 함수개발 및 WOROCAIS를 이용한 이의 추정에 관한 연구)

  • Lim, Jin-Taek;Choi, Jae-Seok;Jeon, Dong-Hoon;Seo, Chul-Soo;Lee, Jae-Gul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.8
    • /
    • pp.1066-1073
    • /
    • 2013
  • This paper illustrates newly an outage cost impact index function(OCIIF). The assessment of the OCIIF is described using the Web Based Online Real-time Outage Cost Assessment and Information System(WOROCAIS) for power system outage cost assessment in Korea. The proposed OCIIF is not absolute but relative outage cost impact index function in view point of outage time using web based survey method for outage cost assessment. While conventional methodology does not consider short time outage cost assessment, the proposed OCIIF reflects short time outage. SCOF(Sector Customer Outage Function) in stead of the traditional SCDF(Sector Customer Damage Function) is defined and proposed newly in this paper. Based the SCOF, AVLL(Average Value of Loss Load) is newly proposed. The OCIIF is demonstrated by WOROCAIS in case study around 2,000 sample data surveyed by KEPCO in South Korea in recent.

Cost index for residential buildings (공동주택 건설공사비지수)

  • Lee, Dong-Hyun;Koh, Young-Beom;Ruy, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.289-294
    • /
    • 2006
  • Residential buildings industry hold lots of portions in Korean construction. Accurate cost index for Residential buildings is required to understand trends of prices of the constructions and to manage budget for them effectively. So Korea Institute of Construction Technology has issued a cost index for residential buildings every six months. However It hasn't been improved although It can't reflect the actual circumstance. So we are supposed to make a new cost index for residential buildings based on statistical data extracted from bills of quantity at three different projects.

  • PDF

An Analysis of Effects of Water Perturbation Exercise on Physiological Cost Index and Gait Ability in Stroke Patients (수중 동요 훈련이 뇌졸중 환자의 생리학적 소비지수와 보행 능력에 미치는 효과 분석)

  • Park, Seungkyu;Park, Samheon
    • Journal of The Korean Society of Integrative Medicine
    • /
    • v.4 no.3
    • /
    • pp.39-47
    • /
    • 2016
  • PURPOSE : This study attempts to find the effects of water perturbation exercise performed on stroke patients in their physiological cost index and gait ability tests. METHOD : The subjects were 30 stroke patients, water perturbation exercise group was performed 3 day per week, for 40 minutes a day, for a period of eight weeks. The physiological cost index and gait of all subjects were assessed by using the polar, 6 Minute Walk Test (6MWT), and 10 meter Walk Test(10mWT) at pre training and post training. Paired t-test was used to analyze change before and after intervention in group. Pearson's correlation was used to analyze correlation of all variables. RESULT : Water perturbation exercise group showed increased physiological cost index. Water perturbation exercise increased gait ability, showing a significant difference. Showing the correlation between the relatively high amount between physiological cost index and 6 minutes walking test. CONCLUSION : From the result of the study, we found that water perturbation exercise was effective in improving physiological cost index and gait ability. The patient is considered to be used by itself to involve the treatment and the risk of falling from the lowered state into the treatment method for the intensive treatment of stroke patients to be useful in improving the cardiovascular system and ability to walk. Through underwater training for stroke patients in the future on the basis of this study it is considered to require additional clinical studies on the impact on daily living and quality of life of stroke patients.

Performance Index Analysis of Schedule Introducing EVMS (EVMS를 도입한 공정의 성과지수 분석)

  • Kim Young;Lee Young-Dae;Kim Sung-Hwan;Kim Jung-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.456-459
    • /
    • 2002
  • It is lately issued studies on EVMS(Earned Value Management System) throughout construction industry, which is management system integrating cost and schedule effectively. So identifying importance and circumstance of introducing EVMS, CPI(Cost Performance Index) and SPI(Schedule Performance Index), which are critical components on schedule introducing EVMS, calculate and it intends to analyze the trend and problem of cost and time throughout project management, applying various statistical data analysis method.

  • PDF

Bus Power Quality Index and Cost based on Load-Voltage Characteristics (부하의 전압특성을 고려한 모선별 전력품질 지표 및 가격 산정기법)

  • Lee, Geun-Joon;Heydt, G.T.
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.9-14
    • /
    • 2002
  • In front of the opening of electric distribution market in 2004. it is indispensable to have a proper estimation of power quality index and power quality cost calculation mechanism are indispensable to stabilize highly industrialized society and to vitalize the investment for electric power system. However, there were not enough measures to reflect the voltage characteristics such as voltage sags and interruptions which make electric load in unstable operation. This paper suggests power quality index(LDI) and power quality cost(LDC) which translate various kinds of voltage records into load drop index and cost based on aggregated load CBEMA curve. A sample calculation result shows that this method can produces the acceptable power quality index and costs for utilities and customers requirements.

  • PDF

A Study on the Construction Cost Index for Calculating Conceptual Estimation : 1970-1999 (개략공사비 산출을 위한 공사비 지수 연구 : 1970-1999)

  • Nam, Song Hyun;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.5
    • /
    • pp.527-534
    • /
    • 2020
  • A significant factor in construction work is cost. At early- and advanced-stage design, costs should be calculated to derive realistic cost estimates according to unit price calculation. Based on these estimates, the economic feasibility of construction work is assessed, and whether to proceed is determined. Through the Korea Institute of Civil Engineering and Building Technology, the construction cost index has been calculated by indirect methods after both the producer price index and construction market labor have been reprocessed to easily adjust the price changes of construction costs in Korea, and the Institute has announced it since 2004. As of January 2000, however, the construction cost index was released, and this has a time constraint on the correction and use of past construction cost data to the present moment. Variables were calculated to compute a rough construction cost that utilized past construction costs through surveys of the producer price index and the construction market labor force consisting of the construction cost index. After significant independent variables among the many variables were selected through correlation analysis, the construction cost index from 1970 to 1999 was calculated and presented through multiple regression analysis. This study therefore has prominent significance in terms of proposing a method of calculating rough construction costs that utilize construction costs that pre-date the 2000s.

Forecasting of building construction cost variation using BCCI and it's application (건축공사비지수를 이용한 건설물가 변동분석 및 공사비 실적자료 활용방안 연구)

  • Cho Hun Hee;Kang Kyung In;Kim Chang Duk;Cho moon Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.64-71
    • /
    • 2002
  • This research developed construction cost forecasting model using Building Construction Cost Index, time series analysis and Artificial Neural Networks. By this model, we could calculate the forecasted values of construction cost precisely and efficiently. And we also could find out that the standard deviation of forecasted values is 0.375 and it is a very exact result, so the standard deviation is just 0.33 percent of 112.28, the average of Building Construction Cost Index. And it show more exact forecasting result in comparison with Time Series Analysis.

  • PDF