• Title/Summary/Keyword: Cost Evaluation

Search Result 3,458, Processing Time 0.027 seconds

Economic Evaluation of Integrated Operation & Management through Operation Performance Analysis of Sewage Facilities (하수도시설 통합운영 성과분석을 통한 통합운영관리의 경제성 평가)

  • Shin, Jungsub;Chung, Seokhyun;Cho, Byoungog;Lee, Kwanhyung;Kang, Seonhong;Kim, Yongdae;Yoon, Joonjae
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.1
    • /
    • pp.63-72
    • /
    • 2017
  • For economic evaluation of integrated operation to sewage facilities, benefit-cost analysis was performed to watershed sewage works project in 7 watershed areas, 156 facilities. In this study, the cost before and after integrated operation was compared and benefits are calculated from the reduction of operators, increasement treated pollution loads, reduction cost through operation convenience, reduction water consumption through effluent reuse, and improvement of life benefit. The result showed that cost was 8,500million won and benefit was 16,747million won, so benefit was 49% higher than cost. B/C analysis result showed that B/C ratio was 1.97 and it is similar to other researches. The benefits of integrated operation included convenience of data management, increase of emergency response, decrease of complains with sewage which was not reflected numerically, so the benefits of integrated operation were expected much greater than this result

Risk Structure Analysis for Cost of Capital : A Demonstrative Study using Financial Indices

  • Ling, Feng;Suzuki, Tomomichi;Ojima, Yoshikazu
    • International Journal of Quality Innovation
    • /
    • v.7 no.3
    • /
    • pp.1-14
    • /
    • 2006
  • Economic value added (EVA) is introduced on two levels: as index for evaluation of corporation and as index for evaluation of business unit. In the latter case, application of one and the same cost of capital to all business units of a business corporation may be possible, but it is a fundamental policy for EVA to apply different cost of capital to business units with different risks. Estimate of cost of capital of business units is a problem to be resolved. The author, focusing on the question of the estimate of cost of capital of business units, has conducted a demonstrative study on risk structure of cost of capital estimates by using financial indices of Japanese manufacturers (37 automotive industries, 141 electrical and electronic machinery industries, 63 food processing industries, 98 chemical industries, 125 general machinery industries) for a period of 5 years from 1995 to 1999. The author presumes that $\beta$ is explained by a regression formula ${\beta}=B_0+{\Sigma}B_iY_i+{\alpha}$ ($Y_i$: financial indices) and selects 40 explanatory variables from financial statements as risk components. Using their financial indices, the author concludes through a series of statistical analyses that there is a good likelihood of estimating cost of capital for Japanese industries and is convinced that it will lead to more reliable and practical results by assigning averages and variances to 40 primary financial indices for a period of 3 to 5 years selected in this demonstrative study.

The Benefit-Cost Evaluation of the Surveying and Mapping Methods (측량 및 매핑 방법의 비용 대 효과 분석)

  • 박홍기
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.19 no.1
    • /
    • pp.19-26
    • /
    • 2001
  • The Organizations working with technological projects will be more and more common to connect consultants. Those who shall carry out the pre-analysis of the projects ought to have a professional knowledge to the area about economical methods with information technology and changed technology of surveying and mapping. New surveying and mapping methods, such as TotalStation, GPS, orthophoto, digital map, and satellite remote sensing, have totally changed the old concept of surveying. Also the technology for the new mapping has greatly changed from analog to analytical to digital during the past 50 years. Now, the proper choice of surveying and mapping methods becomes a decision on cost and efficiency rather than the use of a particular technology. As an example, GPS equipment dose cost considerably more than traditional surveying equipment, but the advantages it provides make it very cost-effective. In this study, the cost and benefit factors of the surveying and mapping projects are evaluated independently and benefit/cost ratio(B/C ratio) is used in benefit-cost evaluation of the different surveying methods. The benefit-cost model of surveying and mapping methods will produce economical result in the whole projects.

  • PDF

Integrated Optimum Design and Cost Effectiveness Evaluation of Viscoelastically Damped Building Structures based on Life-Cycle Cost Minimization (생애주기비용 최소화에 의한 점탄성감쇠기 장착 빌딩구조물의 통합최적설계 및 비용효율성 평가)

  • Park, Kwan-Soon;Hahm, Dae-Gi;Koh, Hyun-Moo
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.9 no.2 s.42
    • /
    • pp.17-27
    • /
    • 2005
  • This paper presents an integrated optimum design and a cost effectiveness evaluation method of a viscoelastically damped structural system. The criterion selected for the optimization is the minimization of the life?cycle cost which is a function of structural sizing variables and the amount of the viscoelastic damper. A genetic algorithm is used as a numerical searching technique in order to simultaneously find the optimum parameters of the integrated system. Optimal distributions of design variables according to various seismic characteristics are investigated by applying the proposed design method to a numerical example of a 10?story building structure. The cost effectiveness of viscoelastically damped structural system is also evaluated by comparing the life-cycle cost of the structure without viscoelastic dampers. The results show that the viscoelastic damper is effective in a region of low to moderate seismicity.

A Study on Re-calculation of Recycling Standard Cost through the Analysis on Standard Cost (표준원가 분석을 통한 재활용 기준비용 재산정에 관한 연구)

  • Lee, Hee-Nahm;Choi, Yoon-Jeong
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.1
    • /
    • pp.189-193
    • /
    • 2011
  • The current standard cost for recycling applied under the Extended Producer Responsibility(EPR) institution, is not coping with continuously increased number of obligatory subject items as well as a variety of variable cost changing factors regarding the recycling treatment cost caused by price fluctuation such as increased material and labor cost entirely across the society; changes in recycling treatment process following the developing technologies; and changes in the required work forces and equipments followed by the trends of automated facilities. Despite such various cost fluctuation factors, the current EPR is not coping with the trends, making the re-calculation process difficult, which causes differences between the real treatment cost for recycling. In this study, the analysis was made on main factors affecting on the related cost and the related price changing index was calculated, by conducting the influence evaluation on the standard cost factors of the current standard cost for recycling. Through theses results, more objective standard will be set for the re-calculation of standard cost for recycling to greatly contribute to setting up the midterm and long-term strategies in the future towards efficient institution.

A Performance Comparison of Block-Based Matching Cost Evaluation Models for FRUC Techniques

  • Kim, Jin-Soo;Kim, Jae-Gon
    • Journal of information and communication convergence engineering
    • /
    • v.9 no.6
    • /
    • pp.671-675
    • /
    • 2011
  • DVC (Distributed Video Coding) and FRUC (Frame Rate Up Conversion) techniques need to have an efficient motion compensated frame interpolation algorithms. Conventional works of these applications have mainly focused on the performance improvement of overall system. But, in some applications, it is necessary to evaluate how well the MCI (Motion Compensated Interpolation) frame matches the original frame. For this aim, this paper deals with the modeling methods for evaluating the block-based matching cost. First, several matching criteria, which have already been dealt with the motion compensated frame interpolation, are introduced and then combined to make estimate models for the size of MSE (Mean Square Error) noise of the MCI frame to original one. Through computer simulations, it is shown that the block-based matching criteria are evaluated and the proposed model can be effectively used for estimating the MSE noise.

Economic Evaluation of ESS in Urban Railway Substation for Peak Load Shaving Based on Net Present Value

  • Park, Jong-young;Heo, Jae-Haeng;Shin, Seungkwon;Kim, Hyungchul
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.2
    • /
    • pp.981-987
    • /
    • 2017
  • In this paper, we estimate the economic benefits of Energy Storage Systems (ESSs) for peak load shaving in an urban railway substation using the annual cost. The annual investment cost of ESSs is estimated using Net Present Value (NPV) and compared with the cost reduction of electricity by the ESS. The optimal capacities of the battery and Power Converting System (PCS) are determined for peak load shaving. The optimal capacity of the ESS and the peak load shaving is determined to maximize the profit by the ESS. The proposed method was applied to real load data in an urban railway substation, and the results show that electric power costs can be reduced. Other aspects of the ESS, such as the lifetime and unit price of the battery, are also investigated economically.

The Evaluation of Quality Management standards for Contract Foodservice Company (위탁급식 업체의 품질 관리기준의 수행평가)

  • 한경수;이소영;서경미
    • Korean journal of food and cookery science
    • /
    • v.18 no.4
    • /
    • pp.426-432
    • /
    • 2002
  • The purpose of the study was to identify the standards of quality management in contract foodservice companies. The subject companies were selected by convenient sampling and surveyed for their standards. The questionnaire consisted of 7 categories: managements of food procurement, menu, production, personnel, equipment, information system, and solid waste. As a result of the study, 60% of the respondents appeared to use standard recipes, 51.5% of them spent 21-30% of the total cost as a labor cost, and 70% were reluctant to answer the food cost. The half of the respondents had job description and specification, 74.76% had training manuals on foodservice and computer software program, and 80.6% had a training program for solid waste management.

Evaluation and Planning of Distribution System Considering Reliability and Harmonics (신뢰도와 고조파를 고려한 배전시스템의 평가 및 계획)

  • Lee Buhm;Kim Yong-ha;Choi Sang-kyu
    • Journal of Energy Engineering
    • /
    • v.14 no.3 s.43
    • /
    • pp.167-172
    • /
    • 2005
  • This paper presents a methodology to support decision making for distribution system planning based on value. To evaluate the reliability value, we employ valued-based distribution reliability assessment. To evaluate the harmonics value, we employ a marginal pricing method, and by using reliability cost, harmonics cost, and construction cost, we can make the most economic decision. By applying the method to the real system, we show this method can get the best result which meet reliability and harmonics level.

A Risk Analysis Model Using VERT for R & D Project Management (R & D 프로젝트의 위험분석모형의 연구)

  • 황홍석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.1
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

  • PDF