• 제목/요약/키워드: Cost Estimating Relationship(CER)

검색결과 4건 처리시간 0.016초

CER 선형결합을 통한 비용추정 모델 개발 (A Cost Estimation Development Methodology via CER's Linear Combination)

  • 정원일;이용복;김동규;강성진
    • 산업공학
    • /
    • 제25권3호
    • /
    • pp.347-356
    • /
    • 2012
  • The acquisition cost of defense weapon system has been continuously increasing because of art-of-technology of it. This phenomenon requires efficiency and transparency in the weapon system acquisition process through cost estimation. Therefore cost estimation is very important to the government acquisition programs to support decisions about funding and to evaluate resource requirement as a key decision point. The Commercial parametric cost estimating models have been using extensively to obtain appropriate cost estimates in early acquisition phase. These models have many restrictions to ensure the cost estimating result in Korean defense environment because they are developed based on foreign R&D data. Also estimation results are different from Korean defense industry accounting system. So, some studies have been tried to develop a CER (Cost Estimation Relationship) based on the Korean historical data. However, there are some restrictions to improve the predictability and ensure the stability of the developed singular CERs which consider the following data characteristics individually. The the abnormal conditions of data that is multicollinearity, outlier and heteroscedasticity under rack of the number of observations. In this paper, a CER's Linear Combining Model is proposed to overcome those limitations which guarantee more accurate estimation (25.42% higher precision) than other singular CERs. At least, this study is meaningful as a first attempt to improve the predictability of CER with insufficient data. The methodology suggested in this study will be useful to develop a complex Korean version cost estimating model development in future.

유도무기 획득단가 추정 모델 개발에 관한 연구 (A Study on Developing the Acquisition Unit Cost Estimating Model of the Guided Weapon System)

  • 김용현;이용복;정원일;김동규;강성진
    • 한국군사과학기술학회지
    • /
    • 제15권5호
    • /
    • pp.565-576
    • /
    • 2012
  • Cost estimates are necessary for government acquisition program to support decisions about funding, to develop annual budget requests and to validate resource requirements at key decision points. Many researches have been done about cost estimating technique recently. Parametric cost estimating models based on CERs(Cost Estimating Relationships) have been mainly used using regression method with historical data. However, there are many restrictions in developing Korean version CERs because the number of data points are too small. Specially, data collection and data management system are unstable in Korean defense environment, when developing CERs. In this research, we analyzed the historical data, and found some cost drivers in guided weapon system area. We developed the Acquisition Unit Cost CER using the regression to remove multicollinearity in the historical data. So we could overcome the restriction of the insufficient sample number. This research as a first attempt is meaningful in terms of obtaining our own Acquisition Unit Cost CER using historical cost and physical characteristic in Korean development environment.

다양한 데이터 특성을 고려한 무기체계 비용추정관계식 개발 연구 (A Study On Developing Weapon System CERs With Considering Various Data Characteristics)

  • 정원일;김동규;강성진
    • 한국국방경영분석학회지
    • /
    • 제36권3호
    • /
    • pp.43-56
    • /
    • 2010
  • 최근 국방 무기체계 획득 환경의 변화는 무기체계 획득비용의 효율적 집행이라는 측면에서 비용분석의 중요성을 더욱 강조하고 있다. 그러나 정책 및 제도적 측면에서 비용분석이 강조되고 있는 반면 비용분석을 위한 국내 기반여건은 매우 부족한 실정이다. 국내에서의 비용추정은 주로 사업초기부터 국외에서 도입한 비용추정 전산모델을 사용하고 있으나 국내 방산환경에 적합하지 않은 많은 제약사항을 가지고 있다. 이러한 이유로 최근 한국형 비용분석 전산모델을 개발하고자 하는 공감대가 형성되었으며 체계적인 연구가 현재 진행되고 있다. 따라서 본 연구에서는 한국형 비용분석 전산모델의 핵심 논리인 비용추정관계식 개발 방법과 절차를 제안하고 있다. 특히 데이터가 가지는 각각의 회귀적 한계, 즉 다중공선성, 이상치, 이분산성 등을 식별하고 이에 적합한 회귀방법을 선택함으로서 데이터의 특성을 고려한 최선의 회귀모형을 구축하는 방법 및 절차를 제안하고자 한다. 제안한 방법은 국내 포병 무기체계 연구개발 자료를 기초로 비용추정관계식 개발방법 및 절차에 대한 이론적 적용가능성을 사례를 통해 검증하였다.

신뢰도 및 정비도 기반 시뮬레이션과 운영유지 비용분석을 통한 무인항공기의 계획창정비 주기결정 (Planned Depot Maintenance Interval Decision for Unmanned Aerial Vehicle through Reliability and Maintainability Based Simulation and Operating & Support Cost Analysis)

  • 이상엽;손준현
    • 항공우주시스템공학회지
    • /
    • 제17권5호
    • /
    • pp.1-10
    • /
    • 2023
  • 본 연구는 무인항공기에 대한 계획창정비의 최적 주기결정 목표 하에, 신뢰도 및 정비도 분석결과를 활용하여 신뢰도 및 정비도 기반 시뮬레이션과 운영유지 비용분석을 통해 계획창정비 수행의 효용성 (경제성)을 검증하였고, 무인항공기 운영의 효과성과 유지관리 비용의 균형을 맞추는 최적의 계획창정비 주기를 제시하였다.