Comparative Analysis of Lifting Loads of Tower Cranes by Core Structure Construction Methods

  • Choi, Yong Seok;Kim, Taehoon;Kim, Sangdae
    • 국제초고층학회논문집
    • /
    • 제9권3호
    • /
    • pp.301-306
    • /
    • 2020
  • In tall building construction, the appropriate control of lifting loads on tower cranes is critical in terms of the construction duration of structural works. The adoption of efficient construction methods can be the most effective way of minimizing the inputs of tower cranes and making a lifting plan and management easier. Based on actual data from a tall building project, this study comparatively analyzes lifting loads of tower cranes by the core structure preceding construction method (CSPCM) and the core structure succeeding construction method (CSSCM). The results revealed that the CSSCM could reduce up to about 56.3% of lifting loads for core works and significantly enhance lifting efficiency compared with the CSPCM. Consequently, this enabled a substantial reduction in the construction duration of structural works. This study provides a practical reference to assist engineers and managers in applying efficient construction methods and lifting equipment operation in tall building projects.

역타공법 중심의 골조 공기단축을 위한 시공시퀀스 변경에 따른 구조해석 및 요소기술 분석 (Structure and Construction Technology Analysis about Construction Sequence Change for Superstructure Construction Period Reduction in Top-down Method)

  • 박용현;주영규
    • 대한건축학회논문집:구조계
    • /
    • 제35권6호
    • /
    • pp.101-109
    • /
    • 2019
  • The purpose of this study is to improve a general Top-Down construction process for superstructure construction period reduction. In a general Top-Down construction sequence, the ground floor slab is set up first. Subsequently, 1st basement level construction including core walls is constructed. Initiation of the ground level superstructure gets waited until then. In this study, removable deck plate installation on the bottom of the core walls of ground level is preceding the concrete casting, therefore, ground level superstructure construction is able to get started earlier. Up to first typical floor concrete casting, total of seventy-two working(calendar) days will be resulted in a reduction from the total construction periods.

코오롱 트리폴리스 코아 선행공법 시공사례 분석 (A Case Study On The Core Construction Method Applied to the Kolon Tripolis Project)

  • 이성진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술논문발표회
    • /
    • pp.13-20
    • /
    • 2002
  • Recently, as the tripolis where the construction of the high-rising building is actively advanced domestic, it will be able to resist in the various horizontal load with the resistance system against hereupon to arrange R.C wall in Core Portion in order, like this building the core construction must preceding from the steel structure and it will reduce using of steel frame amount and it will be able to reduce a whole construction cost with a horizontal resistance ability from the report which provides a reference data to the similar project after to analyze the application of the mivan formwork system which relates in Tripolis.