• Title/Summary/Keyword: Controversial point

Search Result 103, Processing Time 0.025 seconds

Report on the 3rd WHO Informal Consultation on Development of International Standard Acupuncture Points Locations (제 3차 WHO 경혈 위치 국제표준화 회의 보고)

  • Yim, Yun-Kyoung;Kang, Sung-Keel;Kim, Yong-Suk;Sohn, In-Chul;Lee, Hye-Jeong
    • Korean Journal of Acupuncture
    • /
    • v.22 no.1
    • /
    • pp.1-5
    • /
    • 2005
  • Objective : This report is written to inform of the 3rd WHO Informal Consultation on Development of International Standard Acupuncture Points Locations, held in Kyoto, Japan, on October 12-14, 2004. Results : Eight experts from China, Japan and Korea, participated in this meeting discussed the locations and the point finding methods of 92 controversial points based on the fundamental principles established through the 1st and 2nd meetings. Through the discussion in this meeting, agreements were made on most of 92 controversial points, but 8 points(LI12, ST31, PC8, PC9, TE18, LR8, GV1, GV26) still need to be researched in the next meetings. Conclusion : A reasonable and practical International Standard of Acupuncture Point Location for acupuncture education, research and practice is expected to be accomplished in the near future.

  • PDF

Report on the 5th WHO Informal Consultation on Development of International Standard Acupuncture Points Locations (제 5차 WHO 경혈 위치 국제표준화 회의 보고)

  • Kim, Yong-Suk;Kang, Sung-Keel;Sohn, In-Chul;Hwang, Hye-Suk;Choi, Sun-Mi;Koo, Sung-Tae
    • Korean Journal of Acupuncture
    • /
    • v.24 no.2
    • /
    • pp.113-127
    • /
    • 2007
  • Objectives : To inform the 5th WHO Informal Consultation meeting on Development of International Standard Acupuncture Point Locations, held in Osaka, Japan, on September $27{\sim}29$, 2005. Results and Conclusions : Nine experts from Korea, China and Japan discussed the principles of acupuncture points locations and the point locations of 33 controversial acupoints that were not agreed at the previous meeting, as well as 328 non-controversial points that all 3 nations agreed on the locations to confirm the expression of every single point. Through this meeting, the locations of ST30, SP12, LR7 and expressions of LU6, LI8, LI9, LI10, LI 13, SP13, BL60, KI3, GB38, LR11, LR12 were agreed. Furthermore, locations of BL39, GB27, GB28 were confirmed out of 6 non-discussed points. However, several points were still required to held additional meeting to discuss. That includes LI19, LI20, ST36, ST37, ST38, ST39, SI6, KI9, PC8, PC9, TE9, TE17, TE23, GB7, GB30, GV26. In addition, foundation for the international society for the acupuncture point location was proposed to make a regular revision of standard acupuncture point location.

  • PDF

A Study on the Design for Pattern Generator Circuit (Pattern generator 회로 설계에 관한 연구)

  • 노영동;김준식
    • Proceedings of the Korea Institute of Convergence Signal Processing
    • /
    • 2003.06a
    • /
    • pp.262-267
    • /
    • 2003
  • At process of production according to development of accumulation degree of semi-conductor element, because functional mistake examination time required increases, is becoming big obstacle factor in cost-cutting. Studied pattern generator that generate pattern and address that is bundle enemy to process these controversial point effectively.

  • PDF

A Study on Improved Allocations of Permissible Water Pollution Load at the Implementing Stage of Tatal Water Pollution Load Management Plan (수질오염총량관리계획의 시행단계에서 오염부하량 할당방안 개선에 관한 연구)

  • Kim Sie-Heon;Rim Jay-Myung
    • Journal of environmental and Sanitary engineering
    • /
    • v.20 no.3 s.57
    • /
    • pp.51-56
    • /
    • 2005
  • Allocation of water pollution load from loading capacity can be much essential, controversial, and its standards can be applied case-by-case to the various situations. Allocation methods to point sources are generally 'Equal effluent concentration', 'Equal percent Treatment', Loading capacity at planning stage consists of basic pollution load, development pollution load, reserved pollution load and margin of safety. But at the implementing stage loading capacity can be consisted of allocatable load and margin of safety to give more flexibility in the total water pollution load management plan. In that case, we can re-adjust and altogether use the pollution load of point sources of series and non-point sources at the implementing stage.

Use of Visual Digital Media to Develop Creativity: The Example of Video Games

  • V., Zabolotnyuk;S., Khrypko;I., Ostashchuk;D., Chornomordenko;A., Timchenko;T., Motruk;K., Pasko;O., Lobanchuk
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.12
    • /
    • pp.13-18
    • /
    • 2022
  • In the post-information era, most of technologies have a visual part, or at least some functions related to visualization. It is also one of the popular means of presenting materials in education area. However, despite its popularity, the impact of visualization on the effectiveness of learning still remains controversial. Even more controversial is its usefulness in developing creativity, which is one of the most important skills for today's employee. The authors considered the use of visualization as a tool for the development of children's creativity on the example of learning video games, in particular, ClassCraft to distinguish features that, from the point of view of psychology, may lead to developing creativity even being not useful for educational purposes. It is concluded that video games useful for learning may have features, that are inappropriate in formal educational context, but important to develop creative thinking.

Mediating Conflicts in Concurrent Engineering / Design Environment (동시공학/설계 환경에서 Conflict 중재)

  • Kim, Myong-Ok
    • The Journal of Society for e-Business Studies
    • /
    • v.1 no.2
    • /
    • pp.161-173
    • /
    • 1996
  • It Is a typical scenario in concurrent engineering/design that different perspectives of each team members participating In the project exist, and those perspectives lead to conflicting decisions. The model 'resolution network' proposed in this work provides system-mediated resolution for all related team engineers to consider to optimize the manufacture in general. This paper focuses on development of the general architecture of the model and a search engine called Mediator to determine a resolution network from a given constraint network. The Mediator manages the constraint network, determines the most optimistic resolution called optimal point in terms of satisfying overall production goal , and use the optimal point to mediate controversial issues among teams. The biggest merit of our model is that it provides teams with resolution with logical and rational reasoning.

  • PDF

Research about commerce equipment change factor in apartment house complex (공동주택단지내 상업시설의 변화요인에 관한 연구)

  • 최용준;김한수
    • Journal of the Korean housing association
    • /
    • v.12 no.4
    • /
    • pp.105-113
    • /
    • 2001
  • This research indicates to controversial point that store equipments were not applying correct development factor in the each apartment house by that change rate by scale and uniformity of form and inefficiency, effect of discount store is increasing in apartment house and progressed research. The result are as follows; First, interior main point of store of that influence greatly to change rate number of store be. Second, being lot area in jar in outside factor of store. Third, discount store separation appeared by leading person who influence greatly to change rate in middle who is contiguity market singleness residential quarter and contiguity existence of commercial district and nonexistence and discount store separation of only outside right near at hand. Construction of commerce equipment may have to consist in practical apartment house after examine various kinds factor such as store indoor, store outside and only outside while plan practical use of systematic and efficient commerce equipment focusing more in efficient utilization of commerce institution that consist after plan that is not planed commerce equipment focusing in development in plan of commerce equipment in apartment house hereafter accordingly.

  • PDF

An Improved Variable Step Size MPPT Algorithm Based on INC

  • Xu, Zhi-Rong;Yang, Ping;Zhou, Dong-Bao;Li, Peng;Lei, Jin-Yong;Chen, Yuan-Rui
    • Journal of Power Electronics
    • /
    • v.15 no.2
    • /
    • pp.487-496
    • /
    • 2015
  • In order to ensure that photovoltaic (PV) systems work at the maximum power point (MPP) and maximize the economic benefits, maximum power point tracking (MPPT) techniques are normally applied to these systems. One of the most widely applied MPPT methods is the incremental conductance (INC) method. However, the choice of the step size still remains controversial. This paper presents an improved variable step size INC MPPT algorithm that uses four different step sizes. This method has the advantages of INC but with the ability to validly adjust the step size to adapt to changes of the PV's power curve. The presented algorithm also simultaneously achieves increased rapidity and accuracy when compared with the conventional fixed step size INC MPPT algorithm. In addition, the theoretical derivation and specific applications of the proposed algorithm are presented here. This method is validated by simulation and experimental results.

Measuring the Location of PC8 Acupuncture Point Using X-ray Radiography in Healthy Adults (X선 촬영을 통한 노궁(勞宮)의 혈위에 대한 고찰)

  • Koo, Sung-Tae;Kim, Sung-Chul;Kim, Yong-Suk;Kang, Sung-Keel;Choi, Sun-Mi
    • Korean Journal of Oriental Medicine
    • /
    • v.16 no.3
    • /
    • pp.123-126
    • /
    • 2010
  • Objective : There are controversial opinions on the location of PC8 (Nogung). The one is to localize the point between the 2nd and 3rd metacarpal bone, the other is to localize the point between the 3rd and 4th metacarpal bone. The study was performed to provide an experimental evidence to standardize the location of PC8 point. Methods : We employed 30 healthy adults evenly in sex. To identify the location of PC8 in the hand, we took X-ray photograph in both hands of participants. Thin layer of leads were pasted on to PC7 and tip of middle finger prior to take X-ray photograph. The line connecting two points corresponding to the leads in X-ray film was read by a radiologist to decide that the line passes which side between the 2nd metacarpal space and the 3rd one. Results and Conclusions: The line passed the 3rd metacarpal space in 49 cases out of 60 hands (82 %). Data suggest that PC8 could be localized at the point between the 3rd and 4th metacarpal bone.

Evaluation of the characteristics of plasma sprayed ceramic coatings by Indentation test (압입 시험에 의한 플라즈마 세라믹 용사코팅의 특성 평가)

  • Choi, Se-Young;Chae, Young-Hun;Kim, Seock-Sam
    • Proceedings of the Korean Society of Tribologists and Lubrication Engineers Conference
    • /
    • 2002.05a
    • /
    • pp.248-254
    • /
    • 2002
  • The most controversial topics in plasma sprayed ceramic coating system are recently mechanical properties such as bond strength, cohesive strength, toughness and so on. Determination of bond strength of coatings is one of the most important problems. In the industry, the bond strength of coating system has been estimated by Pull-off test(ASTM standard C633-79). But, without a fixed jig and specimen, it is impossible to obtain the bond strength. Therefore, it is necessary to study the critical fracture load on interface of the coating by indentation test. Because the critical fracture load plays an important role in evaluating the bond strength for plasma sprayed ceramic coating system. So, we have estimated critical fracture load in plasma sprayed ceramic coating system, and it was shown that inverse relationship between the cross-section hardness of coating and the critical fracture load(Pc). In case of the high load(1kgf, 2kgf) in $Al_{2}O_{3}+13%TiO_{2}$, it was found that the critical point(Pco), which the coating was broken on.

  • PDF