• Title/Summary/Keyword: Control schedule

Search Result 622, Processing Time 0.028 seconds

Barriers of Last Planner System: A Survey in Vietnam Construction Industry

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.5-11
    • /
    • 2013
  • Construction industry is overwhelmed by delay and often has suffered cost and time overrun. In this context, Last Planner System (LPS) has been considered as a very useful tool for the management of the construction process. Many previous studies have reported its effectiveness in construction performance. This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire. The respondents are been experienced people in construction project management. There are four processes of LPS that were investigated including master schedule, phase schedule, lookahead plan, and weekly work plan. The results showed that master schedule is the most important item when performing a construction project in the VCI. The highest degree of agreement belongs to 'owner - contractor' pair with 77.1% importance indices; whereas the lowest belongs to 'consultants - contractors' pair with 63.8% importance indices. Eventually, three barrier factors were extracted from factor analysis technique with 62.2% of variance explained.

The Effects of Self-Controlled Learning on Balance in Hemiplegics (자기통제 결과지식이 편마비 환자의 균형능력에 미치는 영향)

  • Yoon, Jung-Gyu;Kim, Myung-Hoon;Yook, Dong-Won
    • Physical Therapy Korea
    • /
    • v.12 no.1
    • /
    • pp.36-44
    • /
    • 2005
  • The purpose of this study was to examine the effects of self-controlled learning using the (KR) feedback schedule versus the yoked KR on the acquisition and retention of balance training for individuals with hemiplegics. Sixteen hemiplegics were randomly assigned to either a self-controlled or yoked KR group. All subjects were ambulatory with or without an assistive device. The self-controlled group was provided with feedback whenever they requested it, whereas the yoked group had no influence on the feedback schedule. All subjects performed 10 acquisition trials and 10 retention trials the day after acquisition. The data were analyzed using an independent t-test and a Mann-Whitney U test. Participants in the self-controlled group achieved significantly more effective learning than the yoked group during the acquisition and retention test except anterior/posterior (AP) body sway. These results suggest that a feedback schedule which is controlled by the individuals with hemiplegics may be more effective in balancing training than a yoked KR which is not controlled by the subject.

  • PDF

Control Efficacy of the Mixture of Fluxapyroxad Plus Pyraclostrobin against Pear Scab Caused by Venturia nashicola (배 검은별무늬병에 대한 Fluxapyroxad/Pyraclostrobin 합제의 방제 효과)

  • Min, Kwang-Hyun;Ryu, Jeong-Pil;Kim, Ju-Mi;Kim, Sun-Hwa;Yim, Sun Hee;Choi, Jang Jeon;Cho, Baik Ho;Yang, Kwang-Yeol
    • The Korean Journal of Pesticide Science
    • /
    • v.18 no.4
    • /
    • pp.434-438
    • /
    • 2014
  • The mixture of fluxapyroxad plus pyraclostrobin or the 9 time-spray schedule with various fungicides was evaluated for their efficacy in controlling pear scab in field trials. It showed sufficient condition to evaluate the efficacy of fungicides for the control of pear scab since disease incidence of the untreated control plot was 58.4% or 100% on leaves or fruits, respectively. Pear scab on leaves was occurred by 6.3% at treated plot with the mixture of fluxapyroxad plus pyraclostrobin, resulting in the 89.2% of control value. Incidence of the fruit disease was 16.7% at treated plot with the mixture of fluxapyroxad plus pyraclostrobin, showing 83.3% of control value. When the 9 time-spray schedule was tested, pear scab was occurred by 5% or 13.3% on leaves or fruits, respectively. Their control values were the 91.4% on leaves or 86.7% on fruits. Although the 9 time-spray schedule showed slightly lower disease incidence than the mixture of fluxapyroxad plus pyraclostrobin, but there is no statistically significant difference. These results suggest that the mixture of fluxapyroxad plus pyraclostrobin can control effectively the pear scab.

A profile Mode Automation Technique for the Mobile Phone using Combination of Schedule and Context-awareness (스케줄과 상황 인식을 결합한 모바일 폰의 프로파일 모드 자동 설정 기법)

  • Seo, Jung-Hee;Park, Hung-Bog
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.21 no.7
    • /
    • pp.1364-1370
    • /
    • 2017
  • This paper proposes a method that automatically sets profile schedule context-based mobile phone by collecting the user's external situation based on the GPS sensor and accelerometer built into the smartphone and interacting with the data in the user's schedule to minimize the user's handset handling. However, real-time data collection in mobile phones causes energy shortage in the device due to battery consumption. In other words, a service control method is explained in a way that can efficiently handle resource consumption because accessing a measurement device such as GPS and other sensors may increase power consumption of the portable device. Therefore, effective data sharing for context awareness to reduce weekly schedules and smartphone mode has improved energy efficiency in sensing for data collection. The user can use the context more effectively by providing environmental adaptability for various situations such as the end user's local context and smartphone force control.

The State of Schedule Management and the Recognition of Duration Shortening (공정관리의 실태 및 공기 단축에 대한 인식정도)

  • Kim, Ja-Yeon;Kim, Eui-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.87-94
    • /
    • 2010
  • Construction projects are based on the actual field, so if the construction schedule that is established in the construction plan is delayed or extended for various reasons, construction companies are vulnerable to claims, and thus strive to complete a building within the planned timeline by shortening the construction time. Therefore, this study surveyed technicians in apartment construction in Gwangju, and studied their perceptions of the actual conditions of process control, construction time needs, goals, and methods. The results showed that the organization of the process control department and professional employees was lacking compared to other regions. The need for construction time was perceived as high, while the reduction of the construction cost was perceived as low. Regarding the reduction goal, they perceived highly the preparation for the delay of construction time and various claims, and for the reduction method, they mentioned the extension of working hours and the increase in employees. Based on the results of this study, technicians should consider that a reduction of construction time not only can make up for a delay in construction, but is also closely related to improvements in production through reduction of cost, and increased international competitiveness.

A novel schedule of accelerated partial breast radiation using intensity-modulated radiation therapy in elderly patients: survival and toxicity analysis of a prospective clinical trial

  • Sayan, Mutlay;Wilson, Karen;Nelson, Carl;Gagne, Havaleh;Rubin, Deborah;Heimann, Ruth
    • Radiation Oncology Journal
    • /
    • v.35 no.1
    • /
    • pp.32-38
    • /
    • 2017
  • Purpose: Several accelerated partial breast radiation (APBR) techniques have been investigated in patients with early-stage breast cancer (BC); however, the optimal treatment delivery techniques remain unclear. We evaluated the feasibility and toxicity of APBR delivered using intensity-modulated radiation therapy (IMRT) in elderly patients with stage I BC, using a novel fractionation schedule. Materials and Methods: Forty-two patients aged ${\geq}65$ years, with stage I BC who underwent breast conserving surgery were enrolled in a phase I/II study evaluating APBR using IMRT. Forty eligible patients received 40 Gy in 4 Gy daily fractions. Patients were assessed for treatment related toxicities, and cosmesis, before APBR, during, and after completion of the treatment. Results: The median age was 73 years, median tumor size 0.8 cm and the median follow-up was 54 months. The 5-year locoregional control was 97.5% and overall survival 90%. Erythema and skin pigmentation was the most common acute adverse event, reported by 27 patients (69%). Twenty-six patients (65%) reported mild pain, rated 1-4/10. This improved at last follow-up to only 2 (15%). Overall the patient and physician reported worst late toxicities were lower than the baseline and at last follow-up, patients and physicians rated cosmesis as excellent/good in 93% and 86 %, respectively. Conclusion: In this prospective trial, we observed an excellent rate of tumor control with daily APBR. The acceptable toxicity profile and cosmetic results of this study support the use of IMRT planned APBR with daily schedule in elderly patients with early stage BC.

Design of Neuro-Fuzzy based Intelligent Inference Algorithm for Energy Management System with Legacy Device (비절전 가전기기를 위한 에너지 관리 시스템의 뉴로-퍼지 기반 지능형 추론 알고리즘 설계)

  • Choi, In-Hwan;Yoo, Sung-Hyun;Jung, Jun-Ho;Lim, Myo-Taeg;Oh, Jung-Jun;Song, Moon-Kyou;Ahn, Choon-Ki
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.5
    • /
    • pp.779-785
    • /
    • 2015
  • Recently, home energy management system (HEMS) for power consumption reduction has been widely used and studied. The HEMS performs electric power consumption control for the indoor electric device connected to the HEMS. However, a traditional HEMS is used for passive control method using some particular power saving devices. Disadvantages with this traditional HEMS is that these power saving devices should be newly installed to build HEMS environment instead of existing home appliances. Therefore, an HEMS, which performs with existing home appliances, is needed to prevent additional expenses due to the purchase of state-of-the-art devices. In this paper, an intelligent inference algorithm for EMS at home for non-power saving electronic equipment, called legacy devices, is proposed. The algorithm is based on the adaptive network fuzzy inference system (ANFIS) and has a subsystem that notifies retraining schedule to the ANFIS to increase the inference performance. This paper discusses the overview and the architecture of the system, especially in terms of the retraining schedule. In addition, the comparison results show that the proposed algorithm is more accurate than the classic ANFIS-based EMS system.

Long-term cosmesis following a novel schedule of accelerated partial breast radiation in selected early stage breast cancer: result of a prospective clinical trial

  • Sayan, Mutlay;Hard, Daphne;Wilson, Karen;Nelson, Carl;Gagne, Havaleh;Rubin, Deborah;Heimann, Ruth
    • Radiation Oncology Journal
    • /
    • v.35 no.4
    • /
    • pp.325-331
    • /
    • 2017
  • Purpose: There is controversy regarding the cosmetic outcome after accelerated partial breast radiation (APBR). We report the cosmetic outcome from a single-arm prospective clinical trial of APBR delivered using intensity-modulated radiation therapy (IMRT) in elderly patients with stage I breast cancer (BC), using a novel fractionation schedule. Materials and Methods: Forty-two patients aged ${\geq}65$, with Stage I BC who underwent breast-conserving surgery were enrolled in a phase I/II study evaluating a 2-week course of APBR. Thirty eligible patients received 40 Gy in 4 Gy daily fractions. Cosmetic outcome was assessed subjectively by physician/patient and objectively by using a computer program (BCCT.core) before APBR, during, and after completion of the treatment. Results: The median age was 72 years, the median tumor size was 0.8 cm, and the median follow-up was 50.5 months. The 5-year locoregional control in this cohort was 97% and overall survival 87%. At the last follow-up, patients and physicians rated cosmesis as 'excellent' or 'good' in 100% and 91 %, respectively. The BCCT.core program scored the cosmesis as 'excellent' or 'good' in 87% of the patients at baseline and 81% at the last follow-up. The median $V_{50}$ (20 Gy) of the whole breast volume (WBV) was 37.2%, with the median WBV $V_{100}$ (40 Gy) of 10.9%. Conclusion: An excellent rate of tumor control was observed in this prospective trial. By using multiple assessment techniques, we are showing acceptable cosmesis, supporting the use of IMRT planned APBR with daily schedule in elderly patients with early stage BC.

A Study on the Reformation of the Contract Time Extension Process in the Public Construction projects (공공건설사업에서 계약기간 연장처리방법 개선에 관한 연구)

  • Cho Young-Jun;Lee Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.81-89
    • /
    • 2005
  • Delay schedule coming about duration extension is happening essentially because public construction project consist of many sub contractor. The method which can calculate delay day is suggested by many studies in case of happing delay schedule, but It is difficult to apply to real construction project because there is no mention about the control of The law of contract according to delay schedule. The law of Contract which is cost of account has more uncertain problem than FIDIC condition of contract. This study suggests method which can make extension of duration procedure clear in case of happing the reason of design change related with activity duration during carrying on construction, and a submission process of the reason of duration extension and modify schedule making way about section which is basis of calculating contract amount clear.

A Study on the Operation and Special Quality of the Records Disposition Schedule (기록물분류기준표 특성 및 운영에 관한 연구)

  • Park, Yoo-Jin
    • Journal of Information Management
    • /
    • v.35 no.1
    • /
    • pp.71-91
    • /
    • 2004
  • This study focuses on establishing a base for approaching record disposition schedules, which may be felt unfamiliar, through the overview of record disposition schedules. For this purpose, this study examined the meaning of record disposition schedules, the significance and principle of their elements, and their operation. In addition, it presented tasks to perform for record disposition schedules to play a central role of record management in the future. This study showed that record disposition schedules authorize people to control and process records, and are closely related to the development and the stability of record disposition system in Korea. What is more, it proved that record disposition schedules enable the assessment of the historical values of records, so it is possible to maintain records from the perspective of historical records. Besides, record disposition schedules are important in that they contain information on organizations and their functions, based on which we can preserve and manage extrinsic information about records.