• Title/Summary/Keyword: Contaminant concentration ratio as initial one (C/$C_0$)

Search Result 4, Processing Time 0.017 seconds

Analysis of Effecting Parameters on Extraction of Soil Contaminants using Vertical Drains - Focusing on Soil and Contaminants Physical Properties (연직배수재에 의한 토양오염물질 추출에 미치는 영향인자 분석 - 토양 및 오염유체의 물성치를 중심으로)

  • Lee, Haeng-Woo;Chang, Pyoung-Wuck;Kang, Byung-Yoon;Kim, Hyun-Tae
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.355-360
    • /
    • 2005
  • The properties of contaminants, contaminated soil, and the elapsed time are important factors to in-situ soil remediation. Gabr et. al. (1996) derived the solution equation of contaminant concentration ratio as initial one $(C/C_0)$ with time and spatial changes in contaminated area with vertical drains. The contaminant concentration ratio $(C/C_0)$ is analyzed with time and spatial changes as varying the effective diameter, porosity, shape factor, density of contaminated soil and temperature in ground and unit weight, viscosity of contaminants by using FLUSH1 model. Results from numerical analysis indicate that the most important factor to the in-situ soil remediation using vertical drains is the effective diameter of contaminated soil. It also shows that the viscosity of contaminants, porosity of soil, shape of soil, temperature in ground, unit weight of contaminants are, in order, affected to the soil remediation but density of soil is insignificant to the soil remediation.

  • PDF

Analysis on Effects of Permeability in Contaminated Area on Extraction of Contaminants from Soil Using Vertical Drains (연직배수재에 의한 토양오염물질 추출에 지반의 투수계수가 미치는 영향분석)

  • Lee, Haeng-Woo;Chang, Pyoung-Wuck;Kang, Byung-Yoon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.373-381
    • /
    • 2005
  • The permeability of contaminated soil and elapsed time are important considering factors to in-situ soil remadiation. Gabr et. al. (1996) derived the solution equation of contaminant concentration ratio as initial one (C/$C_0$) with time and spatial changes in contaminated area which embedded with vertical drains. The contaminant concentration ratio (C/$C_0$) is analyzed with time and spatial changes in three different permeability areas which are $k=l.0{\times}10^{-5,}$ $l.0{\times}l0^{-6,}$ $l.0{\times}l0^{-7}\;_{m/s}$ by using the Gabr's equation. Results from numerical analysis indicate that the ratio (C/$C_0$) decreases as the elapsed time increases in every point, however, remediation efficiency decreases as the analyzing point is far from injection well to extraction one and is deeper from top level of contaminated area. And also it decreases as the permeability of contaminated area decreases. Especially, the lower permeability of contaminated area effects directly on the soil remediation, in this research, under condition which the permeability of contaminated area is $l.0{\times}l0^{-7}\;_{m/s}$, the maximum time needed to attain 90% clean up level ($t_{90}$) is 65,690 hours(7.5 years), it takes so much time to clean the low permeability contaminated soil.

  • PDF

Numerical Analysis of Effects of the Physical Properties of Soil and Contaminant Materials on In-situ Soil Remediation Using Vertical Drain (토양 및 오염물질의 물성치가 연직배수재에 의한 현장오염정화에 미치는 영향에 대한 수치해석적 연구)

  • Lee, Haeng-Woo;Chang, Pyoung-Wuck
    • Journal of the Korean Geosynthetics Society
    • /
    • v.5 no.2
    • /
    • pp.1-8
    • /
    • 2006
  • The properties of contaminated soil, contaminants and elapsed time are important considering factors to in-situ soil remediation. Gabr et. al. (1996) derived the solution equation of contaminant concentration ratio as initial one ($C/C_0$) with time and spatial changes in contaminated area which are embedded with vertical drains. The contaminant concentration ratio ($C/C_0$) is analyzed with time and spatial changes as varying the effective diameter, porosity, shape factor, density of contaminated soil, temperature in ground, unit weight and viscosity of contaminants by using FLUSH1 model modified from FLUSH. Results from numerical analysis indicate that the most important factor to the in-situ soil remediation in vertical drain system is the effective diameter of contaminated soil. It also shows that the next important factors are the viscosity of contaminants, porosity of soil, shape of soil, temperature in ground, unit weight of contaminants and density of soil, in order. However, the others except the effective diameter of contaminated soil are insignificant to the soil remediation.

  • PDF

Mechanism of Soil Remediation in Contaminated Area Using Vertical Drains (연직배수재(VDs)에 의한 오염지반정화 메커니즘 연구)

  • Lee Haeng Woo;Chang Pyoung Wuck;Kang Byung Yoon;Kim Hyun Tae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.47 no.5
    • /
    • pp.63-71
    • /
    • 2005
  • In-situ soil remediation mechanism through the vertical drains (VDs) is analyzed with numerical model as the error and complementary error function. Results from in-situ test and analysis indicate that the contaminant concentration ratio as initial one ( C/$C_0$) increases as the radius ratio ( r/R) increases from the injection well, and also increases as the depth ratio ( z/ H) increases from the top of contaminated area. The elapse time needed to attain $50\%$ and $90\%$ clean up level ($ t_{50},\;t_{90}$) increases as the radius ratio ( r/R) and the depth ratio ( z/ H) increase. As above results, the procedure of soil flushing in contaminated area using vertical drains makes progress from the top of injection well to the bottom of extraction well.