• Title/Summary/Keyword: Constructon methods

Search Result 2, Processing Time 0.015 seconds

A Characteristics of the Strength Recovery of the Soil Adjacent to the Pile Depending on the Construction Methods of a Environment-friendly Screw Concrete Pile for a Noise- and Vibration-free Method (무소음·무진동을 위한 환경친화적인 스크류콘크리트말뚝의 시공법에 따른 말뚝 인접 지반의 강도 회복 특성)

  • Kim, Dong-Chul;Choi, Youngkyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.1
    • /
    • pp.71-80
    • /
    • 2013
  • Before and after the test constructions, and after an 11-month hiatus from the pilot pile installations, the in-situ tests (CPT, SPT) were carried out at the ground adjacent to the noise- and vibration-free screw concrete piles installed by 2 kinds of construction methods (i.e., the toe-jetting shoe type, the pre-digging type). In the toe-jetting shoe type construction methods, after construction, the soil strength within 3.5D (where, D = pile diameter) from the pile center decreased greatly by about 46% of the original ground and, after an 11-month hiatus, a strength recovery adjacent to the piles appeared about 71% of the original ground. In the pre-digging type construction methods, a strength recovery adjacent to the piles appeared 100% of the strength of the original ground.

Development of Stage-Cut Method for medium depth Shaft in Korea (국내 중저심도(20~80m) 수직구에 적합한 Stage-Cut 공법 개발)

  • Hong, Chang-Soo;Lee, Ji-Su;Hwang, Dae-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1522-1529
    • /
    • 2009
  • When a shaft is excavated in Korea, the mechanized method such as RBM(Raise Boring Machine) or RC(Raise Climber) is used independently of depth. But usually, the mechanized method is useful for the deep depth. On the contrary, when the depth of shaft is short, the cost of excavation increase. So in the case of shaft constructon less than 100m, we need to consider more suitable method of shaft construction such as Stage-cut which is one of blasting methods. Stage-Cut is widely used in the field of shaft construction in Japan as a tool of rock excavation. The main purpose of this study is to provide technical guidance for design and construction of shafts in rock, using Stage-cut method which is suitable for 20m~80m depth shaft. In this study, Blasting tests was performed in field, according to rock classification. Finally, the stage-cut method which is suitable for the geology of Korea was developed.

  • PDF