AUTOMATED HAZARD IDENTIFICATION FRAMEWORK FOR THE PROACTIVE CONSIDERATION OF CONSTRUCTION SAFETY

  • JunHyuk Kwon;Byungil Kim;SangHyun Lee;Hyoungkwan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.60-65
    • /
    • 2013
  • Introducing the concept of construction safety in the design/engineering phase can improve the efficiency and effectiveness of safety management on construction sites. In this sense, further improvements for safety can be made in the design/engineering phase through the development of (1) an automated hazard identification process that is little dependent on user knowledge, (2) an automated construction schedule generation to accommodate varying hazard information over time, and (3) a visual representation of the results that is easy to understand. In this paper, we formulate an automated hazard identification framework for construction safety by extracting hazard information from related regulations to eliminate human interventions, and by utilizing a visualization technique in order to enhance users' understanding on hazard information. First, the hazard information is automatically extracted from textual safety and health regulations (i.e., Occupational Safety Health Administration (OSHA) Standards) by using natural language processing (NLP) techniques without users' interpretations. Next, scheduling and sequencing of the construction activities are automatically generated with regard to the 3D building model. Then, the extracted hazard information is integrated into the geometry data of construction elements in the industry foundation class (IFC) building model using a conformity-checking algorithm within the open source 3D computer graphics software. Preliminary results demonstrate that this approach is advantageous in that it can be used in the design/engineering phases of construction without the manual interpretation of safety experts, facilitating the designers' and engineers' proactive consideration for improving safety management.

  • PDF

A Study on Establishing Facility and Asset Information from Construction Phase (유지보수 및 자산관리를 위한 시공단계 정보 활용에 관한 연구)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.529-532
    • /
    • 2003
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility. Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from all asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

  • PDF

Development of Web-based Facility Management System by utilizing Information in Construction Phase (시공단계 정보 활용을 통한 웹 기반 유지관리 시스템 개발)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.99-106
    • /
    • 2004
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility, Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from an asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

A Development of the Risk Identification Checklist through the Re-establishment of Risk Breakdown Structure of Construction Project (건설사업 위험분류체계의 재정립을 통한 위험인지 체크리스트 개발)

  • Chu Hae-Keum;Kim Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.109-117
    • /
    • 2003
  • The construction project is largely exposed to much more risk events over the project life cycle due to its complexity and size than the other industries. Therefore, the construction risk management process to identify and response the risk events is not only performing acutely but also proceeding systematically. The risk identification phase in the risk management process is to identify various risk events and define its characteristics. At this phase, the risk identification system is very useful tool to identify every possible risk events in the project. This study shows some problems of the existing risk identification system and proposes the modified risk identification system based on the project phases and the contract bodies, and also suggests partial but more enough detailed risk checklists to be implemented in the actual risk identification phase than any other existing risk breakdown systems to be examined at this study.

Development of VR Simulation Algorithm and System for Supporting Optimal Road Design Information (가상 시뮬레이션에 의한 도로설계정보 최적화 방법론 및 지원체계 개발)

  • Moon, Hyoun-Seok;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.101-110
    • /
    • 2009
  • The current virtual reality(VR) simulation functions in construction project are focused on the construction phase. This study attempts to extend the application of VR functions to the design phase. This study suggests various VR functions such as earthwork simulation by road alignment, alternative route selection simulation, structure type selection simulation and underground structure visualization simulation. These functions can visualize road route and earthwork condition and select an optimal design route by simulating virtual placement of alternative route. This study configures systematic methodology for suggested VR simulation functions and develops VR system by the functions. Finally this study suggests an improved design process of road construction project by using the developed VR functions

Collaborative Process to Facilitate BIM-based Clash Detection Tasks for Enhancing Constructability

  • Seo, Jung-Ho;Lee, Baek-Rae;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.299-314
    • /
    • 2012
  • One of reasons for introducing Building Information Modeling (BIM) is to support clash detection tasks by means of a 3D product model. In the conventional construction project process, clashes have been found during construction phase. However, it can cause cost overrun and time delay. In order to investigate and correct clash detections at design phase, relevant business process and guide for this task should be provided. This study aims to identify hindrances in clash detection tasks at the design phase and analyze its current process using IDEF0 model. Despite the convenience of IDEF0 as a systems analysis tool, professional participants might have difficulties to understand their own tasks according to business process. For this reason, in this research, Business Process Model and Notation (BPMN) is introduced to provide ideal process and required decision making governance. The provide BPMN model will provide insights for a BIM-based collaborative environment to enhance the constructability through the construction project.

Building Commissioning Management Framework from the Case Study of Green Building (녹색건축물인증(LEED) 사례연구를 통한 커미셔닝 관리 프레임워크 도출)

  • Jeong, Jin-Hak;Park, So-Yeon;Song, Dong-Hun;Ahn, Yong-Han
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.8
    • /
    • pp.23-30
    • /
    • 2018
  • A necessity of increasing the energy efficiency of the buildings is rising due to global warming and high energy demands prices. Commissioning is an effective way to increase the energy efficiency of the building and reduce maintenance costs. In this study, a case study was conducted to derive the commissioning process of green building and propose management factors that can be used in domestic commissioning projects. The case was a university renovation project that received a LEED Glod certification and conducted the enhanced commissioning. The commissioning is divided into planning, design, construction, and post-construction phases. In the planning stage, commissioning company selection, commissioning goal setting, tasks and responsibilities for each subject are set. In the design phase, preparations are made for inspection and construction steps to prevent design errors. In the construction phase, problems are solved through periodic on-site inspections. In the post-construction phase, a final report with all the details of the commissioning will be created and future maintenance strategies will be proposed. Based on the findings of this study, it will be a basis for the management factors that can be used in the implementation of domestic commissioning projects.

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

A Process for Replacing BIM Property Information about Internal Finishing of Office Building in Design Phase (업무시설 설계단계 BIM 내부마감 속성정보 교체 프로세스)

  • Han, Ji-Ho;Nam, Dong-Hee;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.207-208
    • /
    • 2023
  • The procedure of predicting the construction cost and selecting the best alternative is performed based on comparative review of each building case. In the case of office building, it is required continuously until design is complete, since the owner requirements are various and likely to change during the design process compared to a standardized apartment. However, since the comparison work for each alternative in practice uses only the unit construction cost, there is no correlation between the alternative and the final result, and it is difficult to quantitatively determine the effect of the determined design factor on the total construction cost. It is needed that a means to support the generation of design alternatives using similar building cases during the design phase. This paper proposes a BIM-based data replacing process to support creating and comparison of design alternatives of internal finishing for office building. When design alternatives are created through the proposed process, it is possible to compare several similar cases with current project under equivalent design circumstance. Because only some finishing properties are replaced while maintaining the shape information such as the length, height, and base constraint of the object to be replaced.

  • PDF

A Study on the Phase Bandwidth Frequency of a Directional Control Valve based on the Metering Orifice (미터링 오리피스를 이용한 방향제어밸브 위상각 대역폭 주파수 측정에 관한 연구)

  • Kim, Sungdong;Jeon, Sehyeong;Yun, Jooseop
    • Journal of Drive and Control
    • /
    • v.15 no.1
    • /
    • pp.1-9
    • /
    • 2018
  • The spool displacement of directional control valve can be considered as the standard signal to measure the bandwidth frequency of a directional control valve. When the spool displacement is not available, the metering-orifice system is implemented in this research as an alternative way of measuring the 90 degrees phase bandwidth frequency of the hydraulic directional control valve. The inertia effect on the transmission line oil induces the phase lead of the valve load pressure when compared with the phase of spool displacement. The capacitance effect of the oil induces the phase lag of the valve load pressure. The phase of the load pressure can be adjusted to be the same as that of the spool displacement by controlling the opening area of the metering orifice. A series of experiments were conducted to verify the effectiveness of the metering orifice. The 90 degrees phase bandwidth frequency measured from the valve load pressure was significantly deviated in some cases from the frequency of the spool displacement. The metering orifice was hard to be applied to measure the -90 degrees phase bandwidth frequency of the high precision.