• Title/Summary/Keyword: Construction worker

Search Result 416, Processing Time 0.03 seconds

Nexus based Quality Inspection Support Model for Defect Prevention of Architectural Finishing Works (하자예방정보 넥서스 기반 건축마감공사 품질점검 지원 모델)

  • Lee, Hye-Rin;Cho, Dong-Hyun;Park, Sang-Hun;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.59-67
    • /
    • 2017
  • At the completion of the construction, various finishing processes are concentrated. This imposes a burden on the on-site manager and imposes on experience based quality control, thereby causing deviations in the quality of construction depending on supervisor or worker's individual competence. In addition, the information related to quality control is frequently scattered in various types of documents such as specifications and drawings, and checkpoints are frequently omitted. It is necessary to provide a tool that can effectively provide the practitioner before or during the inspection work by systematically storing the information related to the defect prevention and linking them in a mutually referential state. This paper proposes an quality inspection support model that can systematically store necessary information on activity or room basis for the quality check of the apartment house finishing work. Establish a defect prevention information base and a information nexus by linking specifications, design standards, checklists, regulations, defect cases, and drawings to the finishing process and the rooms. Based on this, information registration and search interface are presented. It can contribute to securing a certain level of construction quality or more by suggesting a frame that can be utilized by linking various defects prevention information with the focus on closing activity and room.

Operating Strategies for Education and Training Programs for Nurturing North Korean Construction Workers (북한 건설기능인력 양성을 위한 교육·훈련 프로그램 운영 전략)

  • Jung, In-Su;Lee, Giu;Park, Hyeong-Geun;Lee, Young-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.262-269
    • /
    • 2019
  • This study was conducted to pave the way for the development and operation of education and training programs to nurture skilled North Korean construction workers. Such programs would help to meet the expanded demand for setting up infrastructure, which is the backbone of the two Koreas' economic cooperation and mutual development. To achieve this initiative, the targets and scopes of education and training were determined by classifying business types for education and training purposes by construction sector. Furthermore, each education and training course and their allocated time frames were analyzed. Issues related to inter-Korean economic cooperation in the border area were also analyzed to determine regional characteristics. Education and training programs were thus classified into three types of infrastructure units: society, industry, and life infrastructure units. Social infrastructure units are the common demand of the whole border area, including construction of roads, railways, and harbors, as well as inspection and maintenance. Industrial infrastructure units are programs for industrial facilities centering on the designated special economic zone in the western part of the border area. Life infrastructure units are programs for infrastructure facilities such as large, complex facilities and residential facilities for the eastern tourist belt side.

Development of an Automated Layout Robot for Building Structures (건축물 골조공사 먹매김 시공자동화 로봇 프로토타입 개발)

  • Park, Gyuseon;Kim, Taehoon;Lim, Hyunsu;Oh, Jhonghyun;Cho, Kyuman
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.689-700
    • /
    • 2022
  • Layout work for building structures requires high precision to construct structural elements in the correct location. However, the accuracy and precision of the layout position are affected by the worker's skill, and productivity can be reduced when there is information loss and error. To solve this problem, it is necessary to automate the overall layout operation and introduce information technology, and layout process automation using construction robots can be an effective means of doing this. This study develops a prototype of an automated layout robot for building structures and evaluates its basic performance. The developed robot is largely composed of driving, marking, sensing, and control units, and is designed to enable various driving methods, and movement and rotation of the marking unit in consideration of the environment on structural work. The driving and marking performance experiments showed satisfactory performance in terms of driving distance error and marking quality, while the need for improvement in terms of some driving methods and marking precision was confirmed. Based on the results of this study, we intend to continuously improve the robot's performance and establish an automation system for overall layout work process.

Behavioral Change of Workers who completed Experiential Safety Training (체험식 안전교육 이수 근로자의 행동 변화 연구)

  • Choonhwan, Cho
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.161-172
    • /
    • 2023
  • Safety education delivered to construction workers in a lecture manner has limitations in concentration and immersion, so delivery power and interest are low. In order to improve unstable behavior through education and prevent safety accidents, it is necessary to change the paradigm to hands-on education. Purpose: Experiential safety education aims to contribute to preventing accidents for construction workers by quickly recognizing risks, improving emergency response skills, and verifying the effectiveness of pre- and post-learning. Method: Based on a survey of workers who experienced the same work environment as the actual construction site, an opinion survey on the pre- and post-safety experience education and a variable measurement tool were planned, and a research hypothesis was established. Results: The Bayesian theory and MC simulation analysis were used to analyze the structural equation model, and the change in construction worker behavior was confirmed through the intended safety (A), non-experiential education in the sub-area of anxiety (B), average, standard deviation, and minimum and maximum values. Conclusion: The effect of education and industrial accidents are reduced only when construction workers are motivated to participate.

Estimation of Appropriate Wage by Development of Wage Survey Framework for Forest Workers (산림사업 작업자 임금실태조사 프레임워크 개발을 통한 적정 노임단가 추정)

  • Hye-in Park;Cham Kim;Sung-Min Choi
    • Journal of Korean Society of Forest Science
    • /
    • v.112 no.2
    • /
    • pp.217-229
    • /
    • 2023
  • Forest projects often apply construction industry labor rates, without considering the demanding work conditions and labor intensity unique to forest operations, resulting in workplace issues. This study aims to analyze forest operations' characteristics and wage survey methods in other fields to establish a framework for surveying the wages of forest workers. The developed framework was tested through direct surveys conducted with all forest operation companies. Survey items included actual wages by occupation, identification and removal of outliers using quartile deviation, and occupation-based wage calculation. Results revealed that the appropriate wages for 2022 were as follows: KRW 163,376 for general workers, KRW 221,407 for special workers, KRW 250,045 for work leaders, and KRW 239,863 for wood cutters. These figures were 16.27% higher than those derived from the standard construction wage survey. The developed framework was validated by comparing the appropriate wages with both the standard construction wage survey and the forestry workers' wage. The results indicated that the wages calculated using the developed framework were 4.5% more similar to the forestry workers' wage compared with those from the standard construction wage survey. Consequently, the standard construction wage survey was deemed unsuitable for forest projects. To ensure efficient forest operations, it is imperative to conduct wage surveys using the developed framework over multiple years to accumulate sufficient data.

Evaluation of Radon Exposure During Highway Tunnel Construction by New Austrian Tunneling Method (NATM 공법에 의한 고속도로 터널 공사 중 라돈 노출 평가)

  • Ye-Ji Yu;Hyoung-Ryoul Kim;Mo-Yeol Kang;Sangjun Choi
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.33 no.2
    • /
    • pp.115-125
    • /
    • 2023
  • Objectives: This study was conducted to measure the level of radon in the air at a highway tunnel construction site in a gneiss area using the New Austrian Tunneling Method (NATM) and to evaluate exposure levels by occupation. Methods: Radon concentrations in the air were measured using E-PERM at points 300 m, 600 m, and 900 m from the tunnel entrance during the excavation and waterproofing work inside the tunnel. In addition, radon concentrations were measured during external excavation to compare with the inside of the tunnel. Personal exposure levels for major occupations including tunnel workers, construction equipment operators, waterproofers, shotcrete workers, and safety and health managers who participated in the construction were estimated using radon concentration measured in the work process area and working hours by occupation. Results: As a result of a total of 77 radon measurements, the geometric mean (GM) concentration was 71.1 Bq/m3, and the maximum concentration was 127.3 Bq/m3, which was below the indoor air quality criteria. Radon concentration by process decreased in the order of the tunnel excavation process (GM= Bq/m3, GSD=1.2), waterproofing process (GM=73.35 Bq/m3, GSD=1.2), and outside excavating process (GM=45.28 Bq/m3, GSD=1.2). Processes inside the tunnel were significantly higher than outside excavating processes (p<0.05). There was no statistically significant difference in radon concentration measured inside by distance from the tunnel entrance, but the innermost point of the tunnel, 900 m (GM=79.24 Bq/m3, GSD=1.27), measured the highest. Conclusions: The occupation with the highest individual exposure to radon was tunnel worker (64.16 Bq/m3), followed by construction equipment driver (64.04 Bq/m3) and waterproofer (63.13 Bq/m3).

Development of Task Planning System for Intelligent Excavating System Applying Heuristics (휴리스틱스(Heuristics)를 활용한 지능형 굴삭 시스템의 Task Planning System 개발)

  • Lee, Seung-Soo;Kim, Jeong-Hwan;Kang, Sang-Hyeok;Seo, Jong-Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.859-869
    • /
    • 2008
  • These days, almost every industry's production line has become automatic and this phenomenon brought a lot of benefits such as increase in productivity and economical effect, assurance in industrial safety, better quality and compatibility. However, unlike industrial production line, in construction industry, automation has number of barriers like uncertainty incidents and intellectual judgment to make ability to make solution out of it. Therefore construction industry is still demanding use of construction machine through labor. Due to this matter operational labor in construction industry is aging and fading. To solve these problem, in developed nations like Europe, US or Japan are keep researching for the automation in construction and road pavement, strengthening and some other simple operations have been worked through automation but in civil engineering site, automation research is still low despite of its importance in constructional site. For automating civil engineering operation, effective operational plan have to be set by analyzing ground information acquainted. If skillful worker apply heuristics, trial & error can be reduced with increased safety and the effective work plan can be established. Hence, this research will introduce Intellectual Task Planning System for Intelligent Excavating System's effective work plan and heuristics applied in each steps.

Development of Non-Contact Penetration Measuring Device for Pile Driving Workers (항타 시공 작업자를 위한 비접촉식 관입량 측정기 개발)

  • Kim, J.K.;Kong, Y.K.;Choi, K.H.;Cho, M.U.;Kim, S.Y.;Kim, M.J.;Lee, J.H.;Park, Chae Won
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.58-63
    • /
    • 2020
  • At the construction site of the driving site, the pile rebound and penetration measurements are performed manually to determine the end point of the driving operation, thereby causing the measurer to be exposed to a death accident. In this study, in order to eliminate the risk of this work, a non-contact penetration measuring device was developed and usability evaluation was conducted. The penetration measuring device is manufactured based on the ultrasonic sensor, and can be combined with the pile to deliver the data in real time, and the delivered data can be output in real time on the portable PC and the final penetration can be calculated. Usability evaluation on the device was conducted by comparison with manual work. Usability evaluation was largely evaluated on measured values, subjective comfort, and body parts comfort. The result of the measured value tended to overestimate the value measured manually by the measuring device, which is similar to the previous research. In terms of subjective comfort and body part comfort, overall satisfaction was higher than the manual method when using the measuring device. Taken together, these results indicate that it is possible to use the rudder measuring device in place of manual work in the construction site, and it is judged that the worker's comfort is greatly increased by using the measuring machine. The results of this study suggest that the use of non-contact measuring device in the field can be used as basic data to support them.

2D Spatial-Map Construction for Workers Identification and Avoidance of AGV (AGV의 작업자 식별 및 회피를 위한 2D 공간 지도 구성)

  • Ko, Jung-Hwan
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.49 no.9
    • /
    • pp.347-352
    • /
    • 2012
  • In this paper, an 2D spatial-map construction for workers identification and avoidance of AGV using the detection scheme of the spatial coordinates based on stereo camera is proposed. In the proposed system, face area of a moving person is detected from a left image among the stereo image pairs by using the YCbCr color model and its center coordinates are computed by using the centroid method and then using these data, the stereo camera embedded on the mobile robot can be controlled for tracking the moving target in real-time. Moreover, using the disparity map obtained from the left and right images captured by the tracking-controlled stereo camera system and the perspective transformation between a 3-D scene and an image plane, depth map can be detected. From some experiments on AGV driving with 240 frames of the stereo images, it is analyzed that error ratio between the calculated and measured values of the worker's width is found to be very low value of 2.19% and 1.52% on average.

Setting Time Evaluation of High Flowable Ternary Concrete Mix Using Durometer (듀로미터를 이용한 3성분계 고유동 콘크리트의 응결시간 추정)

  • Han, Min-Cheol;Lee, yuk-Ju
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.8 no.1
    • /
    • pp.33-38
    • /
    • 2020
  • The aim of the research is to evaluate the feasibility of durometer for assessing setting time of the concrete by comparing it with the currently used proctor penetration test method to improve the surface finishing timing determining method generally determined based on the experience of the worker. As a research result, the correlation between suggesting method using durometer with currently used proctor penetration test method was high enough. Hence, on the surface of the concrete, the initial setting time and the final setting time could be designated as 41 HD with C-type, and 11 HD with D-type, respectively. Therefore, the durometer can be used as a portable setting time evaluation device with the easiness of handling and measuring for determining concrete surface finishing timing quantitatively.