• Title/Summary/Keyword: Construction work

Search Result 4,767, Processing Time 0.035 seconds

Work Time Analysis of Rebar Fabrication Method in Beam Construction. (보 철근공사 조립공법별 작업시간분석)

  • Kim, Ju-Yong;Kim, Min-Ku;Kim, Young-Kil;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.8-9
    • /
    • 2019
  • The rebar work is a labor intensive construction work with a high labor cost ratio. It is difficult to manage the productivity, construction time, and safety of rebar work. The problem of productivity decreased in rebar construction is due to a lack of workers according to the aged workers. Partial prefabrication rebar can be an alternative solution to productivity decreased in rebar work. The characteristic of partial prefabrication method is that time consuming component such as stirrup of beam assemble in factory and others assemble in site. Therefore, in this study, the time required for each rebar assembly method is measured and analyzed to confirm the possibility of productivity improvement.

  • PDF

Exploring the Triangular Relationship: Occupational Diseases, Work-Related Illness, and Accidents in the Construction Sector

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.875-885
    • /
    • 2023
  • This research delves into the evolving interplay between occupational diseases, work-related illnesses, and accidents in the construction industry, focusing on the past twenty years. One significant discovery is the 19-fold escalation in reported occupational diseases, prompting an examination of their root causes and connections to workplace environments. Frequently encountered work-related ailments include physically strenuous tasks, low back pain, and cerebrovascular issues, highlighting the need for robust prevention and management approaches. Predominantly, noise-induced hearing loss and pneumoconiosis are the most common occupational diseases. The study unveils notable correlations between specific work-related illnesses and accidents, indicating the necessity for bespoke safety measures. Additionally, a pronounced association between work-related illnesses and occupational diseases offers insights into underlying risk factors. Remarkably, the findings propose a bidirectional link between occupational diseases and accidents, challenging traditional beliefs about causality. These insights are pivotal for enhancing safety protocols, focusing on preventive measures, and foreseeing occupational diseases that may arise following accidents in the construction industry.

A Study on Landscaping Repair Work Classifications in Cultural Heritage Industry (문화재 수리의 조경분야 공종 분류에 관한 연구)

  • Kim, Min-Seon;Lee, Jae-Yong;Kim, Choong-Sik
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.59-66
    • /
    • 2022
  • The purpose of this study was to suggest the landscaping repair work classification, the standard for securing the independence of and establishing the scope of landscaping repair works. Standard construction specifications currently specify the landscaping repair work classification around the planting construction, while standard work estimate does not include the field of landscaping. The landscaping construction specifications and the standard work estimate in the construction industry should be, however, applied, so it is difficult to specifically understand what is the landscaping repair work classification in the cultural heritage industry. From 1961 to 1980, not only the tree planting but also a variety of landscaping facilities had been specified as the landscaping repair works, and it was found that all of these work classifications are established as the landscaping repair work classifications in the construction industry. A total of 20 work classifications were verified by comprehensively arranging those specified in notices of tender for working drawing services for cultural heritages during three years, from 2018 to 2020, except for those for the maintenance and Dancheong of architectures, plant protection and conservation. All 20 work classifications corresponded to the landscaping work classifications in the construction industry. On the basis of the landscaping work classifications in the construction industry, this study divided the landscaping repair work classifications into site-building and shaping, planting work, facility construction, paving work, ecological landscape architectural construction and vegetation maintenance, by considering the specialty of cultural heritage space.

A Study on The Risk Level of Work Types in Urban Railway Construction (도시철도 건설공사의 공종별 위험도에 관한 연구)

  • Lee, Jong-Bin;Han, In-Kuk;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.2
    • /
    • pp.98-103
    • /
    • 2016
  • The goals of this study were to investigate some significant factors to judge level of safety at urban railway construction field and to analyze degree of risk by work classification. Currently, there are lots of construction fields for the urban railway for national transportation, and our government also planned constructing more urban railway in near future. However, most of the researches on safety neglected the degree of risk factors on the urban railway construction field. Safety managers participated in the brainstorming session for deriving decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for deriving most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including adjacency of obstacle, intensity of work, unsafe condition and work space. Third, the results of AHP showed civil work is the most dangerous work among 6 work types. The results could be used to give the safety management priority on accident prevention efforts among several hazards and to reduce degree of risk in construction field of the urban railway.

A STUDY ON THE SAFETY INFORMATION SYSTEM TO PREVENT HAZARD OF BUILDING CONSTRUCTION

  • Han-Min Lee;Seong-Seok Go;Hyuk Song;Hyun-Chul Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1048-1052
    • /
    • 2005
  • In Korean cases, the occupation of building construction is below 10% of the total industry workers but from a accident rate point of view, it is a risk serious industry and it's hazard is very considerable which accident rate is up to 30% of the total industry workers. The reason of high accident rate of the building construction is its own characteristic, hazard of the work in which is implicated and the shortage of safety counter plan and information, so it is most required to the building construction that educating, training, short and long period approaching to prevent the hazard. The safety information of building construction which is related to safety accident is divided into human and material such as hazard, work situation, cause and counter plan. The existing hazard cases imply all of the information about the work type and work progress of the building construction, so if the research of the every fact is well accomplished, we can obtain the useful information and prevent the hazard of building construction. From this point of view, the emphasis of this study is based on analyzing the cause of hazard first, suggesting the safety information each part of work type and work progress second, and finally making the all existing hazard cases to the Data Base and developing the safety information system.

  • PDF

The Improvement Plan of Information Management of Interior Finishing Work at Apartment in Korea (국내 집합 공동주택 내장마감공사 정보관리 개선방안)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.3
    • /
    • pp.99-106
    • /
    • 2003
  • The purpose of this study is to suggest the rational plans of Information Management in the interior finishing work. The results of this study are summarized as follows; I) Analytical survey of actual construction progress of interior finishing work 2) Review of computer-based development in construction planning & information management of interior finishing work 3) Structure of interior finishing work Planning and Management Support System And the expectancies of this paper are that it can be used as efficient data for improvement of system to systematize planning and execution of interior finishing work in korea.

Process Optimization Method Based on Emergency Construction Work Scenario (돌관공사 시나리오 기반 공정관리 최적화 방안)

  • Lee, Si-Hyun;Lee, Seung-hak;Woo, Mi-Sun;Son, Jae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.117-118
    • /
    • 2015
  • These days buildings have more possibilities to occur construction delay as many variables and risks are inherent in them due to the enlargement and complexity. When a project is delayed, it generates extra working expenses and this causes a dispute between the employer and the constructor. Most construction sites conduct emergency construction work to recover the delay of the project duration. When an emergency construction is carried out in the actual construction site, it's necessary to utilize and distribute the proper working groups based on the procedure of successor and predecessor. Many constructions, however, have been going only with more number of work forces and working time. This study suggests a process management optimization plan with an application of emergency construction scenario by using linear programing.

  • PDF

Delay Factor Analysis and Process Enhancement System Development Focusing on Masonry Work (조적공사에서의 작업 지연 요소 도출 및 개선 시스템 제안)

  • Park, Min Ha;Lee, Hye Lin;Ko, Yong-Ho;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.119-120
    • /
    • 2015
  • Appropriate management of the finish works in construction project is one of most important activities that must be conducted considering the total duration of the project. Masonry work is a fundamental process that is performed in the preliminary steps of finish works. However, it has been investigated that the analysis of delay factors affecting masonry work has been neglected in the domestic construction site. Therefore, this study deducts delay factors affecting masonry work by literature review and survey on site engineers and labors. This study has been conducted as a preliminary step of developing a construction project interference management system which is expected to suggest objective information for the decision making in construction sites.

  • PDF

Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System (인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

A Work Process for Productivity Improvement of Concrete Structural Frame Work in Tall Building (초고층 골조공사 생산성 향상을 위한 작업 프로세스 개선)

  • Jang Ji-Sun;Shin Yoon-Seok;Kang Kyoung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.161-164
    • /
    • 2005
  • According to the trend of tail building, it is essential to improve productivity in tall building construction. However, the study on that is insufficient until now. Therefore, the purpose of this study is to propose a new work process of efficient concrete structural fame work to improve productivity in tall building construction. The results of being applied proposed work process are that the 5day cycle time of concrete structural frame work is cut by 0.5day and the quantity of rebar to be demanded in concrete structural frame work is reduced.

  • PDF