Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

A Study on the Measures for Work Interference Reduction in Apartment Construction (공동주택 공사의 작업간 간섭 감소 방안에 관한 연구)

  • An Sung-Hoon;Kim Joon-Ho;Kang Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.117-122
    • /
    • 2006
  • Apartments construction is a one of largest parts in buildings construction. In apartments construction, work interferences are frequently occurred in work processing because workspaces are very various and numerous. However, though work process is important for mainly influencing to the schedule, quality and cost of apartments construction, these work interferences are considered a kind of uncertainty, which is difficult to anticipate at construction planning stage, in work processing. Therefore, this study proposed the measures for work interference reduction in apartment buildings construction and the actual planning for practices. The results can be summarized as follows: (1) the standard of work process is checked regularly. (2) The scope of work and work process is adjusted. (3) The standard of drawings process and cost about work interferences work profess is established.

The Risk Assessment of Work Type in Reinforced Concrete Construction Work (철근콘크리트조 건축공사의 공종별 위험성 평가)

  • Lee Jong-Bin;Go Seong-Seok;Jang Seong-rok
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.1 s.69
    • /
    • pp.119-125
    • /
    • 2005
  • Construction work accidents have not decreased in spite of much effect such as new work methods education and research related to the safety management. Specially, many fatal accidents were mainly caused by unanticipated risk factors in reinforced concrete construction work, which was involved in apartment, building. school church, hotel hospital, bank work and the other works. According to the construction fatal accident book by KOSHA 1,903 workers were killed by the fatal accidents in reinforced concrete construction work during the 13 years$(1992\~2004)$. From these reasons, this study researched the cause of fatal accidents which were happened in reinforced concrete construction work during last 13 years and surveyed construction managers and specialists about risk factors according to the work type in the reinforced concrete construction work. Therefore, this study will suggest the counterplan about the construction safety management and prevent fatal accidents from construction site related to the reinforced concrete construction work.

An Analysis of Influences on Partial Work Rates under the Whole Work Rates on the Landscape Constructions in the Ulsan Grand Park (울산대공원 조경공사의 각 세부공정이 전체공정율에 미치는 영향분석)

  • 성백진;이재근;최종희
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.31 no.6
    • /
    • pp.64-72
    • /
    • 2004
  • This study analyses influences on partial work rates under whole work rates on landscape constructions in Ulsan Grand Park. The schedule management is one of the factors that are very important to the process management of landscape construction. The time process of the whole construction is supposed to be affected by several kinds of work that organize the whole construction. First, this study divides the construction of Ulsan Grand Park into 10 kinds of works: earth work, rain and sanitary sewage water work, water-supplying work, planting work, paving work, water proofing work, fountain work, instituting work and temporary work. Then the time-process curves of all kinds of work are statistically compared to that of the whole construction. The trial methods of statistics are lineal regression, non-lineal regression, and principal analysis. In the result of the non-lineal regression, the rain and sanitary sewage water work, the water-supplying work and the earth work strongly affected the whole construction. The principal analysis results show that the whole construction is affected strongly by the water-supplying work, the rain and sanitary sewage water work and the earth work. However the lineal regression is shown to be senseless because of its high collinearity.

A Study of Landscape Construction Work Classification for System Instruction of New Estimation System based on Historical Construction data. - With regard to Housing Landscape Construction - (실적공사비 적산방식 도입을 위한 조경공사 공종분류체계에 관한 연구 -주택단지 조경공사를 중심으로-)

  • 박원규;김두하;안동만
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.25 no.1
    • /
    • pp.82-99
    • /
    • 1997
  • The purpose of this study is to establish work classification system of landscape construction in order to offer the basis of new estimation system of public landscape construction. New estimation system is based on historical construction data. For application of this system, the standard work classification system is necessary. Because extensive cost data should be accumulated under an unified construction work classification system. In the study of new estimation system carried by KICT(Korea Institute of Construction Technology), landscaping works belong to earth work of civil engineering. It looks very unreasonable work classification, because landscape archtecture has its own specialties and professional domain. In this study, information classification systems in the construction industry and various landscaping works of housing developments are analysed. As a result. a standard work classification system of housing landscape construction is proposed in section VI-3. This standard work classification structure consists of three levels divisions (i.e large work division, middle work division, small work division) . Now in this study, housing landscape construction works are divided into four large works and twenty six middle works. According to work attributes, middle and small work division is possible to subdivide into details.

  • PDF

Derivation and Implications of Digitalizing Key Construction Supervision Work: Focusing on the Construction Supervision Work of the Domestic Construction Sites

  • Chan Hyuk Park;Seong Mi Kang
    • Architectural research
    • /
    • v.25 no.1
    • /
    • pp.11-17
    • /
    • 2023
  • This study aims to derive key construction supervision work that can be digitalized among construction supervision work. The scope of the study includes domestic construction sites to which the Building Act of South Korea is applied. First, the construction supervision process was identified through extensive consultation of construction expert witnesses. Afterwards, the key construction supervision works for digitization were derived through survey results construction expert witnesses. Among the 24 supervision works throughout the pre-construction, construction, and post-construction stages, the proportion of supervision work manpower or cost, the type of data generated by supervision work and the urgency of introducing digital technology, and the impact on productivity and safety of supervision work were evaluated on a 5-point scale from "very low" to "very high" was investigated. The survey was conducted by t-test analysis, and as a result, it was possible to derive that the level of digitization was higher than average in "quality management," "safety management," and "collection and cooperation of maintenance instructions." It can be interpreted that digitization has been introduced on a pilot testing basis or has already been completed according to the needs of the site. On the other hand, it can be interpreted that the work that are obtained below the average score are considered to be realistically constrained at the construction site and that it is inevitable for the supervisor to proceed manually. Future studies include analyzing the quantitative impact of the key construction supervision work once digitalization is fully applied.

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

The DEVELOPMENT OF WORK PERFORMANCE ANALYSIS SYSTEM

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.738-746
    • /
    • 2009
  • The purpose of this study is to develop the web-based system for work performance analysis(WPAS). The need of work performance analysis system has already been suggested in many previous researches on the computerization of the performance measurement in the construction site by using the indicators such as time, cost and quality. However, they had focused on measuring or analyzing the result when the project would be over. The WPAS suggests three indicators - work reliability, work effectiveness and work efficiency - to manage the performance of the construction site. It can help the manager more easily recognize the status of on-going work in the construction site by measuring and analyzing the work reliability rate, the work effectiveness and work efficiency every day. This research includes the procedures for WPAS measurement process, database structure of WPAS which was analyzed by the IDEF0 and the data flow diagram. Finally, this research introduces the result of WAPS's case studies and validation in the Korean construction site.

  • PDF

Workload and Productivity during Work from Home (WFH) for the Construction Workforce

  • Wu, Hongyue;Chen, Yunfeng
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.492-499
    • /
    • 2022
  • A large number of employees shifted to Work from home (WFH) due to the COVID-19 pandemic, including the construction workforce. The changes in workload and productivity due to WFH impact the work performance and economic outputs of companies. However, there are mixed results about the impacts of WFH on workload and productivity. In particular, limited studies focused on specific types of work of different occupations in the construction workforce. This study aims to explore the impacts of WFH on workload and productivity considering different types of work for the construction workforce in the U.S. After identifying three main occupations and five types of work, an online survey (N = 69) was distributed. Descriptive analysis showed that participants had less workload (0.82 hours/week) and lower productivity (9.69%) during WFH. Three occupations had varied changes due to the different types of work. Analysis of Variance (ANOVA) indicated that there was no significant difference in workload, while productivity was decreased during WFH. In particular, the productivity of project-related work and communication and documentation decreased significantly. Overall, participants finished 2.85% less workload per week during WFH. The findings provide an insight into WFH in the construction workforce, which improves future remote or hybrid work arrangements in the construction industry.

  • PDF

The Study on Case Analysis of an Apartment House Defects (공동주택 하자사례 분석에 관한 연구)

  • 이희두;이해진;김진호;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.130-135
    • /
    • 2001
  • In this study, I have researched into the causes of defects in apartment house, The results of this study are listed below. (1) Water leakages which result from land sinking and cracks, results of misuse of back filling method, are the main reason of defects in civil engineering work and architectural work. (2) Inexperience and unwillingness are the main reason of defects in plaster work. (3) In windows work and painting work, the main reasons are lacks of precision construction and efflorescence resulting from outdoor air, respectively. (4) Defects in waterproofing work and electric work result from fault construction by low unit Costs. (5) Equipment work requires uses of standardized construction materials and management, and landscape architecture work requires minimizing human mistakes, for instance, degin carelessness. For the reasons stated above, the causes of defects in apartment house are insufficient construction labors, inferior construction materials, urgent construction process time, and conscientiousless industrialists who only seek after a profit margin.