• Title/Summary/Keyword: Construction types

Search Result 3,464, Processing Time 0.035 seconds

Light Emotion Friendly Concrete With Transparent Materials (투명재료를 이용한 빛 감성 친화형 콘크리트)

  • Kim, Byoungil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.40-41
    • /
    • 2015
  • The purpose of this study is to develop advaced furture type of concrete which utilizes transpart plastic types of fiber replacing previously used high price optical fiber and porous type of steel mold to induce its mass production. New type of concrete solved problems of construction and economy can make it easily their application to construction market.

  • PDF

Cause Analysis and Reduction of Safety Accident in Modular Construction - Focusing on Manufacturing and Construction Process - (모듈러 건축에서의 안전사고 원인 분석 및 저감방안 - 제작 및 시공단계 작업을 중심으로 -)

  • Jeong, Gilsu;Lee, Hyunsoo;Park, Moonseo;Hyun, Hosang;Kim, Hyunsoo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.8
    • /
    • pp.157-168
    • /
    • 2019
  • Modular Construction is regarded as having enhanced safety compared to traditional construction since most of modular manufacturing process in plants. Unlike general consideration for safety in modular construction, several industrial accident data and studies have pointed out that the accident rate of modular construction is not enough less as much as the practitioners have expected. It means that there is a clear need for improvement of safety management in modular construction. To enhance safety, it is necessary to identify the type and cause of accident through accident cases in order to prevent safety accident in advance. In this consideration, this study analyzed the types and causes of accidents through root cause analysis procedure with accident cases of U.S. OSHA. The classification was carried out in the order of process type, accident type and cause of accident. By following the classification criteria in this study, the causal factor was derived and the root cause map was created. Based on the analysis results, cross-analysis was conducted and it is shown that activity characteristics of modular construction are related to safety accidents. In addition, prevention methods to reduce safety accident by major activity are presented in terms of organizational, educational and technical aspects. This study contributes that the result can be used as the basic safety management in the manufacturing and construction process of modular construction.

Finding on Preventive Intervention of Fatal Occupational Injuries Through Empirical Analysis of Accident Death (사고사망자의 심층적 실증분석을 통한 예방적 개입점 발견 연구)

  • Yi, Kwan Hyung;Rhee, Hong Suk
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.3
    • /
    • pp.83-88
    • /
    • 2019
  • The 7,993 cases of Survey Report of Fatal Industrial Accidents conducted jointly by the MEOL and the KOSHA for the recent seven years(2007-2013) were categorized according to personal and occupational characteristics, industry types, business sizes, job types, activities at the time accident, types of accidents, material agents(assailing materials), unsafe conditions, and unsafe acts. And it is found that among the 72.2 percent of fatal occupational accidents in the construction and manufacturing industries are caused by falling, sticking, bumping and being caught under objects & overturning. For this study, through the empirical analysis on causes of fatal industrial accidents, was used to identity high risk groups based on total data of 7,993 victims of occupational accidents. An annual fatal occupational injury (FOI) rate per 10,000 workers was about 0.47‱. The middle-aged group and the elderly group showed the highest FOI rates per 10,000 workers (0.73‱, 0.80‱), and the daily workers showed the highest FOI rate (1.46‱), and the craft and related trades workers showed the highest FOI rate (2.17‱). In case of industry type the mining industry (7.26‱) showed the highest FOI rate, followed by the sewerage, waste management, materials recovery and remediation activity industry (3.91‱) and the construction industry (2.71‱). The primary high risk target group that requires a strategy designed to reduce fatal occupation injuries caused by falling and bumping & contact(collision) is the construction industry, and the secondary high risk target group in the construction industry is classified as the equipment, machine operating and assembling workers in the construction industry, those aged 50 years old and above need the prevention measures against bumping & contact(collision) and being caught under an object & falling(objects), while those aged less than 50 years old need prevention measures against falling(persons).

Analysis of Potential Construction Risk Types in Formal Documents Using Text Mining (텍스트 마이닝을 통한 건설공사 공문 잠재적 리스크 유형 분석)

  • Eom, Sae Ho;Cha, Gichun;Park, Sun Kyu;Park, Seunghee;Park, Jongho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.91-98
    • /
    • 2023
  • Since risks occurring in construction projects can have a significant impact on schedules and costs, there have been many studies on this topic. However, risk analysis is often limited to only certain construction situations,and experience-dependent decision-making is therefore mainly performed. Data-based analyses have only been partially applied to safety and contract documents. Therefore, in this study, cluster analysis and a Word2Vec algorithm were applied to formal documents that contain important elements for contractors or clients. An initial classification of document content into six types was performed through cluster analysis, and 157 occurrence types were subdivided through application of the Word2Vec algorithm. The derived terms were re-classified into five categories and reviewed as to whether the terms could develop into potential construction risk factors. Identifying potential construction risk factors will be helpful as basic data for process management in the construction industry.

MEASURING AND COMPARING PROFIT PATTERNS OF TRADITIONAL CONSTRUCTION COMPANIES EXTENDING TO HIGH-TECH CONSTRUCTION

  • Jieh-Haur Chen;Chung-Fah Huang;S. C. Hsu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.360-365
    • /
    • 2005
  • The need of constructing high-tech facilities is one of the important issues concerning the competitiveness by the high-tech companies. It, simultaneously, offers a magnificent opportunity for construction participants. Nevertheless, the high-tech construction is experience-based, resulting in little related construction knowledge that has been statistically analyzed and documented. This study measures and confers with the profit patterns causing the disparity between the traditional and high-tech construction. The database was the result of collecting detailed information of 65 construction projects from eight construction companies, including detailed records of over 20 main construction operations in each project. All of these were performed during the recent 10 years and encompassed in the project types of the high-tech construction, residential building, and commercial building. Rendering suggestions regarding profit management and expecting to economize cost of learning from inexperience while extending to the high-tech construction were both presented.

  • PDF

THE TREND OF CONSTRUCTION COST INDICES AND THEIR APPLICATIONS

  • Yoo-Sub Lee;Seung-Hyun Lee;Tai-Kyung Kang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.908-912
    • /
    • 2005
  • Construction Cost Indices are values for measuring fluctuations in direct construction costs which include material costs, labor costs, and equipment costs for construction operations. In Korea, Korea Institute of Construction Technology (KICT) has been assessing and announcing these indices since January, 2004. The main goals of this paper are to look over the calculation process for those indices and then present the trend in construction costs according to the types of facilities with the past construction cost index data. Also, this paper traces the origin of the occurrence of significant changes on those indices through the further analysis of the trend. In addition, this paper shows the practicality of the indices and the way how to put them to practical use. An alternative estimate method using the indices is suggested for compensating the changes of construction costs caused by price fluctuations.

  • PDF

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

A Study on the Prediction Model of Total Construction Period according to the Type of Machine Learning Regression (머신러닝 회귀분석 유형에 따른 총 공사기간 예측 모델에 관한 연구)

  • Kang, Yun-Ho;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.361-362
    • /
    • 2023
  • In construction work, there is often a difference between the estimated construction period and the actual construction period. Accordingly, the project may be delayed from the scheduled date, leading to huge losses due to problems such as increased costs during construction. In this way, it is important to calculate the appropriate construction period at the project planning stage in construction work. To solve this problem, we would like to study a model that will increase the accuracy of the scheduled construction period at the project planning stage. This study compared and analyzed linear regression, Lasso regression, Ridge regression among the types of regression analysis to select an appropriate construction period prediction model to secure an appropriate construction period at the project planning stage to reduce problems during construction.

  • PDF

Characterization of Runoff Properties of Non-point Pollutant at a Small Rural Area considering Landuse Types (토지이용 특성을 고려한 소규모 농촌유역의 비점오염물질 유출특성 해석)

  • Bae, Sang-ho;Kim, Weon-jae;Yoon, Young H.;Lim, Hyun-man;Kim, Eun-ju;Park, Jae-roh
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.4
    • /
    • pp.654-663
    • /
    • 2010
  • Attention has increasingly focused on the pollutant load discharged from rural area since the enforcement of total maximum daily loads (TMDLs) in korea. As one of the methods to control the inflow of pollutant load during wet weather events, local governments are attempting to apply non-point source control facility. To design those facilities appropriately, it is essential to understand the runoff characteristics of pollutants such as TSS, $BOD_5$, $COD_{Cr}$, TP and TN. In the paper, the quantitative analyses for pollutant runoff characteristics were examined in a small rural watershed with the area of about 53 hectares. For a dry weather day and wet weather events, variation patterns of dry weather flow and runoff characteristics of wet weather flows were monitored and investigated. The runoff model using XP-SWMM reflecting the landuse types of the watershed in detail was simulated to perform the sensitivity analyses for several factors influencing on their hydrograph and pollutographs. As a result, for the case of medium and small rainfall events (i. e. total rainfall of 35.8 and 17.5 mm), the impervious area including green house, roof and road which covers relatively low portion of total area (i. e. 16%) caused substantial first flush and the majority of total runoff load. Therefore, it has been concluded that the runoff characteristics of each pollutant and distribution of impervious area should be considered for the establishment of the control strategy of non-point pollutant runoff at a rural area.

A Measurement Study of Body Types for Clothing Construction (의복구성(衣服構成)을 위한 계량적(計量的) 체형연구(體型硏究))

  • Jeong, Ok-Im
    • Journal of the Ergonomics Society of Korea
    • /
    • v.5 no.1
    • /
    • pp.19-28
    • /
    • 1986
  • To study the body trunk form which is essential to clothing constructions, necessary body sizes were measured indirect1y from 216 unmarried women from 19 to 24 years old by a photographic network method. The results are obtained as follow; 1) In this study of body type measurements, the four factors of bust, abdomen, column and hip size have been divided into four-stage intervals and given the body type codes 1, 2, 3 and 4, with 1 designating the size difference of the factor with the minimum size difference of the factor with the maximum size difference from waist size. These body type codes can be easily, linguistically interpreted. In this study, among $4^4=256$ possible body types, 54 types appeared frequently. These 54 types are integrated into 6 groups of types by clustering analysis. Representative types of each group are types 3333 and 2333 in group 1, 2233, 1233 and 1332 in group 2, 2222, 1222 and 1223 in group 3, 2223 in group 4, 2323 and 2322 in group 5, and 3323, 3223 and 3322 in group 6. In the types of groups 1, 2, and 3, the change is mainly in bust size, and in the types of group 4. is single type. In the types of group 5 the change is mainly in hip size, and in the types by groups 6 the change is mainly in abdomen size and hip size. 2) The analysis by measuring the four elements of body trunk in reference to waist size is scientific and grading of similar styles is possible in clothing construction. 3) Assuming that the human body is oval, using the calculating method, the size of girth, which cannot be measured by the indirect measuring method, is obtained approximate to actual size, with an error of ${\pm}2.8cm$.

  • PDF